Loading…
Loading…
Tender Value
₹43.1 L
EMD Value
₹86,280
Closing Date
13 Jul 2026, 6:00 pm3d left
GE (ARMY) NO 2 JODHPUR
Military Engineer Services, Garrison Engineer (Army) No 2 Jodhpur, Multan Lines, Army Area Jodhpur -342010
PROVN OF BUILDING FOR TECH TRAINING OF UNIT PERSONNEL UNDER GE (A) NO. 2 JODHPUR
2026_MES_756888_2
8800/25-26/84/E8
Open Tender
Civil Works
180 days
GE (ARMY) NO 2 JODHPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (ARMY) NO 2 JODHPUR
₹86,280
Yes
13 Jul 2026
10 Jun 2026
15 Jul 2026
10 Jun 2026
13 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of Guard room with watch post and toilet (Guard house, Hard standing and Sentry box elevated) RCC framed structure in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22. | 1 | Lumpsum | 38,93,785.1 | ₹38,93,785.1 |
| 2SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24 | 1 | Lumpsum | 42,295.95 | ₹42,295.95 |
| 3SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) | |||||
| 3.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25 to 27. | 1 | Lumpsum | 1,66,448.44 | ₹1,66,448.44 |
| 4SCHEDULE 'A' PART-IV (EXTERNAL WATER SUPPLY) | |||||
| 4.01 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 28. | 1 | Lumpsum | 38,924 | ₹38,924 |
| 5SCHEDULE 'A' PART-V (INTERNAL WATER SUPPLY) | |||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 29 to 30. | 1 | Lumpsum | 10,766.46 | ₹10,766.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
84TENDERDOCUMENTSnew.pdf
Tender Documents • 3.15 MB
84STR_AND_ARCH_DWGS.pdf
Additional Documents • 9.61 MB
BOQ_863518.xls
BOQ • 0.28 MB
TD_compressed.pdf
Additional Documents • 6.06 MB
Download all tender documents and submit your bid