| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-AOC | L1 | Accepted-AOC RATES ARE FOUND REASONABLE AND BEING LOWEST BIDDER | |
| 2 | L2₹46.9 L+₹3.2 L (7.39%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | chhaba construction L2 | D DEV COMPANY L1 |
|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of Guard room with watch post and toilet (Guard house, Hard standing and Sentry box elevated) RCC framed structure in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22. | 1 | Lumpsum | 43,00,000 ₹43,00,000 | 39,00,000 ₹39,00,000 Lowest |
| 2.00SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24 | 1 | Lumpsum | 36,458 ₹36,458 Lowest | 47,000 ₹47,000 |
| 3.00SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) | |||||
| 3.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25 to 27. | 1 | Lumpsum | 1,49,856 ₹1,49,856 Lowest | 1,80,000 ₹1,80,000 |
| 4.00SCHEDULE 'A' PART-IV (EXTERNAL WATER SUPPLY) | |||||
| 4.01 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 28. | 1 | Lumpsum | 34,565 ₹34,565 Lowest | 40,000 ₹40,000 |
| 5.00SCHEDULE 'A' PART-V (INTERNAL WATER SUPPLY) | |||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 29 to 30. | 1 | Lumpsum | 9,578 ₹9,578 Lowest | 15,000 ₹15,000 |
Tender Value
₹43.1 L
EMD Value
₹86,280
Closing Date
13 Jul 2026, 6:00 pmClosed
GE (ARMY) NO 2 JODHPUR
Military Engineer Services, Garrison Engineer (Army) No 2 Jodhpur, Multan Lines, Army Area Jodhpur -342010
PROVN OF BUILDING FOR TECH TRAINING OF UNIT PERSONNEL UNDER GE (A) NO. 2 JODHPUR
2026_MES_756888_2
8800/25-26/84/E8
Open Tender
Civil Works
Lump-sum
180 days
GE (ARMY) NO 2 JODHPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (ARMY) NO 2 JODHPUR
₹86,280
Yes
11 Aug 2026
10 Jun 2026
15 Jul 2026
10 Jun 2026
13 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of Guard room with watch post and toilet (Guard house, Hard standing and Sentry box elevated) RCC framed structure in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22. | 1 | Lumpsum | 38,93,785.1 | ₹38,93,785.1 |
| 2SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24 | 1 | Lumpsum | 42,295.95 | ₹42,295.95 |
| 3SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) | |||||
| 3.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25 to 27. | 1 | Lumpsum | 1,66,448.44 | ₹1,66,448.44 |
| 4SCHEDULE 'A' PART-IV (EXTERNAL WATER SUPPLY) | |||||
| 4.01 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 28. | 1 | Lumpsum | 38,924 | ₹38,924 |
| 5SCHEDULE 'A' PART-V (INTERNAL WATER SUPPLY) | |||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 29 to 30. | 1 | Lumpsum | 10,766.46 | ₹10,766.46 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
84TENDERDOCUMENTSnew.pdf
Tender Documents • 3.15 MB
84STR_AND_ARCH_DWGS.pdf
Additional Documents • 9.61 MB
BOQ_863518.xls
BOQ • 0.28 MB
TD_compressed.pdf
Additional Documents • 6.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .