| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L Quoted ₹2.6 L | L1 | Accepted-AOC ... |
| 2 | L2₹2.6 LRejected-Finance | ₹2.6 L | L2 | Rejected-Finance .. |
| 3 | L3₹2.8 LRejected-Finance | ₹2.8 L | L3 | Rejected-Finance .. |
| Sl No | Description | Qty | Unit | ANISH SHARMA L2 | PUNJAB SINGH L3 | MAXIM ENGINEERING SOLUTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Providing consultancy services for Preparation of Detailed Project Report for A/R & M/O Various LIS under JSV Division Sujanpur in Tehsil Sujanpur Distt. Hamirpur (SH:-Consultancy service for preparation of detailed prject report for Providing Lift Irrigation Project to Gram Panchayats Chabutra, Ree, Banal & Darla in Tehsil Sujanpur Distt. Hamirpur under PMKSY). based on detailed survey, Preparation Shajra Plan, revenue record, Contour Plan, marking of proposal on plan, preparation of L-section of Rising Main and distribution system, detailed hydraulic design, design calculations, structural design, cost estimations complete for an Area of about 626.32 Hect. and approval of Detail project reports from different agencies etc. including prepration of working estimate, tender document, agreement, NIT, Schedule of quantity etc. required for tenders and approval thereof from the competent authority & investigation including the detailed study of all related parameters given in the following check list. | 623 | Per Hect | 415 ₹2.6 L | 445 ₹2.8 L | 412 ₹2.6 L |
| 2.00Check List:-The Report shall be presented covering the following parameters. | ||||||
| 3.00i) Check list as per CWC (MOWR) PMKSY latest guideline minor irrigation requirement. | ||||||
| 4.00ii) Introduction | ||||||
| 5.00iii)Salient features | ||||||
| 6.00iv)Physical features | ||||||
| 7.00v) General Investigations (Social, Climate, Geological, Population & other details. | ||||||
| 8.00vi) Hydrological studies & water resources. This should include measurement of Discharge of source for a period of site. One year by installing a gauge of suitable site consideration of various roads/proposal and finalisation most economical route. | ||||||
| 9.00vii) Design features. | ||||||
| 10.00viii) Crop water requirement & meteorological (Irrigation planning). | ||||||
Tender Value
₹2.5 L
EMD Value
₹4,984
Closing Date
17 Jan 2026, 11:00 amClosed
Executive Egnineer JS Division Sujanpur
Executive Egnineer JS Division Sujanpur
Sub Head Consultancy service for preparation of detailed project report for providing Lift Irrigation Project to Gram Panchyats Chabutra, Ree, Banal and Darla in Tehsil Sujanpur Distt. Hamirpur under PMKSY)
2026_HPIPH_125323_1
EE-JSV-SJN-CB-E-tenders-2025-
Open Tender
Consultancy
30 days
Executive Egnineer JS Division Sujanpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Egnineer JS Division Sujanpur
₹4,984
28 Feb 2026
8 Jan 2026
17 Jan 2026
8 Jan 2026
17 Jan 2026
8 Jan 2026
Providing consultancy services for Preparation of Detailed Project Report for A/R & M/O Various LIS under JSV Division Sujanpur in Tehsil Sujanpur Distt. Hamirpur (SH:-Consultancy service for preparation of detailed prject report for Providing Lift Irrigation Project to Gram Panchayats Chabutra, Ree, Banal & Darla in Tehsil Sujanpur Distt. Hamirpur under PMKSY). based on detailed survey, Preparation Shajra Plan, revenue record, Contour Plan, marking of proposal on plan, preparation of L-section of Rising Main and distribution system, detailed hydraulic design, design calculations, structural design, cost estimations complete for an Area of about 626.32 Hect. and approval of Detail project reports from different agencies etc. including prepration of working estimate, tender document, agreement, NIT, Schedule of quantity etc. required for tenders and approval thereof from the competent authority & investigation including the detailed study of all related parameters given in the following check list.
Check List:-The Report shall be presented covering the following parameters.
i) Check list as per CWC (MOWR) PMKSY latest guideline minor irrigation requirement.
ii) Introduction
iii)Salient features
iv)Physical features
v) General Investigations (Social, Climate, Geological, Population & other details.
vi) Hydrological studies & water resources. This should include measurement of Discharge of source for a period of site. One year by installing a gauge of suitable site consideration of various roads/proposal and finalisation most economical route.
vii) Design features.
viii) Crop water requirement & meteorological (Irrigation planning).
ix)Design of all components of the project i.e R/Main, Pumping machinery and distribution system etc.
x) Construction Material & Construction Programme.
xi) Envioronmental & ecological studies:- The rates are exluding of Engironment Impact Assessment (EIA) or Environment and ecological studies and clearance from concerned departments.
xii) Pre & post irrigation crop budget.
xiii) Financial resources
xiv) Estimates.
xv) Revenues
xvi) Benefit cost ratio and financial return, EIRR.
Following data needs to be collected from various department.
a)Meteorological data in catchment area of source and command area of project from meteorological department
b) Soil surveys pre and post project cropping pattern/budget from state agriculture department
c) Ground water potential in command and area from ground water organization of GWO/CGWB.
d) Soil investigation survey has to be got conducted for assertaining Bearing Capacity of soil for construction of various civil structures.
e) Geological investigation from state geologist/any other agency in respect of DAM, and water conductor system as per prevailing norms.
Detailed Project Report (DPR) should contains the followings
Volume-I Separate DPR shall be prepared for each source/Sub Division.
i)History
ii) Salient features
iii) Physical features
iv) General Investigations (Social, Climate, Geological, Population & other details.
v) Hydrological studies & water resources. The old discharge data of source available with the concerned department shall be used for designing the scheme instead of setting new discharge site .
vi) Pre & post irrigation crop budget.
vii) Crop water requirement & meteorological (Irrigation planning).
viii) Design features.
ix)Design of main components of the project. Keeping in view all the external forces including wind, land slide, earth quake etc.
x) Construction Material & Construction Programme.
xi) Environment & ecological studies and clearance from concerned department
xii) Benefit cost ratio and financial return
xiii) Revenue record
xiv) The proposal should include complete automation of the project with provision of all modern equipment and material is to be used for construction of the project. The Detailed Project Report should include the long term for operation and maintenance of the project.
Drawings. :-
i) Key plan on 100 m grid and contour plan ( C.I =2.0m) on the scale 1:15000 (Detailed Topographical survey & contour plan (C.I = 1.0m) on 30mx30m grid at the scale 1:1000 Surveyed and prepared with the help of total station & shall be presented in auto CAD as Soft copy along with prints.
ii). L-section & X- section of R/main, G/main, distribution lines, Minor and Sub minor lines and Pucca field Channel & Kaccha Field channel etc. complete.
iii). Design & Drawing of all relates works such as pump houses, collection tanks, outlets,protection works etc.
iv). Marking of Alignment of R/mains, Gravity mains and distribution system, pump houses, collection tanks, outlets,protection works etc. on Shajra plan.
v). Any item required in addition to above for preparation of Detailed Project Report (DPR).
Volume-2
i)General Abstract of Cost.
ii)Sub head wise abstract of cost & detail of measurements.
iii) Basic rates of material & labour
iv) carriage of material by mechanical transport & mannual
v) Analysis of rates
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
F6.pdf
Tender Documents • 0.26 MB
F8.pdf
Tender Documents • 1.42 MB
Terms.pdf
Tender Documents • 0.07 MB
BOQ_184553.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid