Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹16,278.58 (2.43%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.3 L+₹59,116.59 (8.83%)Rejected-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.4 L+₹66,916.54 (10.00%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹7.4 L+₹69,509.68 (10.4%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹8.0 L
EMD Value
₹19,971
Closing Date
22 Dec 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE
AEE,PWD SPECIAL BUILDINGS SUB DIVISION,PAINAVU,IDUKKI
DEPOSIT Construction of Drainage in Ekalavy Model Residential School Idukki Painavu Work General Civil Work
2022_PWD_539434_1
E15/AEE/SB/22-23
Open Tender
Civil Works - Buildings
Item Rate
60 days
PAINAVU
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,765
₹19,971
15 Feb 2023
14 Dec 2022
24 Dec 2022
14 Dec 2022
22 Dec 2022
14 Dec 2022
Amount
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD82824/2021-2022:manlabour
NISHAD P A
GEORGE JOSEPH
NEW KERALA BUILDERS
ANANDAKUMAR
Tellus
Bidder Name
Tellus
GEORGE JOSEPH
Johny K P
NISHAD P A
NEW KERALA BUILDERS
ANANDAKUMAR
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_785307.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .