Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹80,441
Closing Date
2 Sept 2026, 12:00 pm5d left
SE,SWEC,PWD, MIDNAPORE
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.Dte), South-Western Electrical Circle , PWD Compound,Midnapore,Paschim Medinipur
Annual operation of bed cum passenger lifts at Main building and Passenger lift at Natun Bhawan of Bankura Sammilani Medical College and Hospital, Bankura.
2026_WBPWD_5018905_1
WBPWD/SE/SWEC/NIQ25/2026-27
Open Tender
Support/Maintenance Service
Item Rate
730 days
BANKURA
Please refer Tender documents.
3 documents required · 3 mandatory
₹80,441
OFFICE OF THE SE,SWEC,PWD,MIDNAPORE
17 Aug 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
2 Sept 2026
20 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.02 | The rate quoted shall be inclusive of:
i) Operation on all working days, including holidays, and provision of off-day relievers.
ii) Minimum labour wages as per prevailing Government norms, bonus, ESI, EPF, and all applicable taxes and duties, and shall be in accordance with the terms and conditions mentioned below. | - | - | - | - |
| 1.03 | Charges for the deputing the following manpower:- | - | - | - | - |
| 2.02 | The rate quoted shall be inclusive of:
i) Operation on all working days, including holidays, and provision of off-day relievers.
ii) Minimum labour wages as per prevailing Government norms, bonus, ESI, EPF, and all applicable taxes and duties, and shall be in accordance with the terms and conditions mentioned below. | - | - | - | - |
| 2.03 | Charges for the deputing the following manpower:- | - | - | - | - |
| 3.02 | The rate quoted shall be inclusive of:
i) Operation on all working days, including holidays, and provision of off-day relievers.
ii) Minimum labour wages as per prevailing Government norms, bonus, ESI, EPF, and all applicable taxes and duties, and shall be in accordance with the terms and conditions mentioned below. | - | - | - | - |
| 3.03 | Charges for the deputing the following manpower:- | - | - | - | - |
| 4Terms and conditions and to comply scope of Work, without showing further reason. I. General Conditions :- " Agency shall indemnify the department against legal liabilities " Himself/ his Supervisor visit the site / office once in a week and also as and when required. " No residential accommodation shall be provided by the Department. However, The space for sitting accommodation for the staffs of the agency inside worksite premises shall be provided. " The contract may be terminated with One month prior notice. µ¶ÎAThe manpower requirement shall comprise a total of two (02) shifts per day, as detailed below: i) One (01) Lift Operator for the 1st Shift (Shift No. 01). ii) One (01) Lift Operator for the 2nd Shift (Shift No. 02). iii) The timing of the 1st and 2nd shifts shall be as per the direction of the Engineer-in-Charge (EIC)3&J%)Contract No: WBPWD/SE/SWEC/NIQ25/2026-27ªName of Work: Annual operation of bed cum passenger lifts at Main building and Passenger lift at Natun Bhawan of Bankura Sammilani Medical College and Hospital, Bankura.Charges for Operation of 01 No. 15 Passenger, Bed-cum-Passenger Lift [Make: ESCON] installed at Main Building of Bankura Sammilani Medical College & Hospital.& Charges for Operation of 01 No. Bed-cum-Passenger Lift [Make: ADAMS] installed at Main Building of Bankura Sammilani Medical College & Hospital.& ¡Charges for operation of the 01 No. Bed-cum-Passenger Lift (Make: Bharat Elevator) installed at the Natun Bhawan of Bankura Sammilani Medical College & Hospital.The manpower requirement shall comprise a total of three (03) shifts per day, as detailed below: i) One (01) No. Lift Operator for the 1st Shift (Shift No. 01). ii) One (01) No. Lift Operator for the 2nd Shift (Shift No. 02). iii) One (01) No. Lift Operator for the 3rd Shift (Shift No. 03). iv) The timing of the 1st, 2nd and 3rd shifts shall be as per the direction of the Engineer-in-Charge (EIC).`!RThree (03) No. Lift Operator. (Quantity: 03 (Three) Person x 24 Month = 72 Unit)OTwo (02) No. Lift Operator. (Quantity: 02 (Two) Person x 24 Month = 48 Unit)IThe manpower requirement shall comprise a total of two (02) shifts per day, as detailed below: i) One (01) No. Lift Operator for the 1st Shift (Shift No. 01). ii) One (01) No. Lift Operator for the 2nd Shift (Shift No. 02). iii) The timing of the 1st and 2nd shifts shall be as per the direction of the Engineer-in-Charge (EIC)Manpower / Per MonthManpower / Per Month | |||||
| 4.01 | Scope of Work:-
A.1 De | - | - | - | - |
| 4.02 | A.1.2. Dedicated Lift Operator (Inside Lift Car):
• One attendant shall be positioned inside the lift car.
Responsible for:
o Operating the lift manually where required.
o Assisting passengers (especially elderly, disabled, or during peak hours).
o Ensuring safe entry and exit of passengers.
o Monitoring unusual sounds, jerks, or malfunctions.
o Rescue passengers when required.
o Coordinating with Lift Maintenance Team, J.E./A.E. and Occupying authorities
A.1.3. Reliever Lift Operator (Inside Lift Car): Perform all activities as mentioned in A.1.2 as reliever of Dedicated Lift Operator
Note:
The role of the Lift Attendant—whether as a monitoring attendant or lift operator(Liftman) —shall be decided by the Occupying Authority based on operational requirements. | - | - | - | - |
| 4.03 | A.2 General Responsibilities
• Ensure smooth and safe lift operations at all times.
• Prevent overloading of lifts.
• Maintain cleanliness and basic hygiene inside lift cars.
• Report any technical fault immediately to Company’s Supervisor and concerned JE.
• Mandatorily Participate in Refreshment Training organized by Department
• Maintain a logbook of incidents, faults, and inspections as per proforma provided by the Department.
• Check Functioning of ARD at the time of Maintenance by maintenance personnel and report to concerned JE in case ARD is found to be out of order/ malfunctioning.
• Ensure free passage through all landing doors of the Lift and if any sorts of obstacles are noticed in front of any landing door, that should be brought into notice of the Co’s Supervisor and JE/AE. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.60 MB
BOQ_5090434.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].