Loading…
Loading…
Tender Value
₹1.1 L
EMD Value
₹1 L
Closing Date
9 Jun 2026, 7:00 pm4d left
Exeuctive Engineer, Panchayat, R. & B. Division, Patan
MAINTENANCE AND REPAIRS TO ROADS (ASPHALT PATCH WORK) UNDER THE JURIDICTION OF R & B SUB DIVISION SAMI.
310549
04/26-27
Open
Civil Works - Roads
Patan
7 documents required · 7 mandatory
₹1,500
Executive Engineer, Road &Building (Panchayat) Division, Patan
₹1 L
2 Jun 2026
2 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
Name of work : Maintenance and repairs (Building and road work) under jurisdiction of R & B Sub Division Sami
Memorandum showing items works to be carried out :
CFY WZJFGF SFDGL AFATM NXF¶JTL IFNL
Items Quantities item of work Tendered Rates Unit Total amount
Items Quantities item of work Tendered Rates Unit Total amount
No. estimated Qty SFDGL AFAT In Figure In words V[SD according to
AFAT may be more estimated
or less quantities
G\AZ V\NFHL HyYF VG];FZ
1 1.00 Providing and laying 37.50 mm thick open graded Bituminous 3982.48 Rupees Three Thousand MT
grouting with B.T. aggregate 0.66 Cum/10 Smt and using asphalt Nine Hundred Eighty Two
grade VG-30 for mixing at the rate of 1.99 % . ie 19.90 Kg / M.T. of And Paise Forty Eight Only
total mix & bitumen for tack coat @ 4.00 Kg / 10 Smt. on B.T.
surface including heating the asphalt and aggregate by continuous
batching drum mix plant, transporting and spreading Manually and
consolidation with Kuba . including providing all materials,
equipments, tools and plant, oil, kerosene fire wood labour charge
etc comp. using contractors own machinaries , drum mix plant &
equipment etc .comp.
2 1.00 Providing and laying 37.50 mm thick open gradedBituminous 4179.43 Rupees Four Thousand MT
grouting withB.T. aggregate 0.66 Cum/10 Smt (0.50 Cum /10 Smt One Hundred Seventy
coarse aggregate & 13 Cum / 10 smt key aggregate )and using Nine And Paise Forty
asphalt grade 60/70 for mixing at the rate of 1.99 % . ie 19.90 Kg / Three Only
M.T. of total mix & bitumen for tack coat @ 4.00 Kg / 10 Smt. on
B.T. surface including heating the asphalt and aggregate by
continuous batching drum mix plant, transporting and spreading the
same by paver finisher and consolidation with vibratory roller .
including providing all materials, equipments, tools and plant, oil,
kerosene fire wood labour charge etc comp. using contractors own
machinaries , drum mix plant & equipment and paver finisher etc
3 1.00 Providing and laying 37.50 mm thick open gradedBituminous 3706.75 Rupees Three Thousand MT
grouting withB.T. aggregate 0.66Cum/10 Smt (0.50 Cum /10 Smt Seven Hundred Six And
coarse aggregate & 13 Cum / 10 smt key aggregate )and using Paise Seventy Five Only
asphalt grade 60/70 for mixing at the rate of 1.99 % . ie 19.90 Kg /
M.T. of total mix & bitumen for tack coat @ 4.00 Kg / 10 Smt. on
B.T. surface including heating the asphalt and aggregate by
continuous batching drum mix plant, . including providing all
materials, equipments, tools and plant, oil, kerosene fire wood
labour charge etc comp. using contractors own machinaries , drum
mix plant & equipment etc .comp. (At Plant site, transporting to
work site & spreading will pay seperetely.)
4 1.00 Providing and laying 37.50 mm thick compacted Bituminous 5065.64 Rupees Five Thousand MT
Macadam using stone chips 0.66 Cum/ 1 M.T. mix as per gradation Sixty Five And Paise Sixty
& using asphalt grade 60/70 for tack coat 2.50 Kg /10 smt on B.T. Four Only
surface & for mixing 34 Kg / M.T.(i.e. 3.40 % of mix) including
heating the asphalt and aggregate by continuous batching drum mix
plant, transporting th mix material and spreading the same
Manually and consolidation with Kuba . including cost of fuel ,hire
charges, fire wood , kerosens, labour charge etc & with contractors
own machinaries , drum mix plant & equipment etc .comp.
5 1.00 Providing and laying 37.50 mm thick compacted Bituminous 4789.90 Rupees Four Thousand MT
Macadam using stone chips 0.66 Cum/ 1 M.T. mix as per gradation Seven Hundred Eighty
& using asphalt grade 60/70 for tack coat 2.50 Kg /10 smt on B.T. Nine And Paise Ninety
surface & for mixing 34 Kg / M.T.(i.e. 3.40 % of mix) including Only
heating the asphalt and aggregate by continuous batching drum mix
plant, . including cost of fuel ,hire charges, fire wood , kerosens,
labour charge etc & with contractors own machinaries , drum mix
plant & equipment and etc .comp.(At Plant site, transporting to work
site & spreading will pay seperetely.)
6 1.00 Providing and laying Asphalt painting on BT Surface with bitumen 66.84 Rupees Sixty Six And Sq.mt
grade VG-30 at the rate of 5 kg per 10 Sq.M by mechanical sprayer Paise Eighty Four Only
and spreading the stone dust on prepared surface at the rate of
Cu.M. per 10 Sq.M etc complete and rolling with PTR roler and
brushing etc complete
7 1.00 Providing and laying 37.50 mm thick compacted Bituminous 5262.59 Rupees Five Thousand MT
Macadam using stone chips 0.66 Cum/ 1 M.T. mix as per gradation Two Hundred Sixty Two
& using asphalt grade 60/70 for tack coat 2.50 Kg /10 smt on B.T. And Paise Fifty Nine Only
surface & for mixing 34 Kg / M.T.(i.e. 3.40 % of mix) including
heating the asphalt and aggregate by continuous batching drum mix
plant, transporting th mix material and spreading the same by
paver finisher and consolidation with vibratory roller of 80 KN to
KN static weight . including cost of fuel ,hire charges, fire wood
kerosens, labour charge etc & with contractors own machinaries
drum mix plant & equipment and paver finisher etc .comp.
8 1.00 Providing and laying Bituminous Seal Coat using stone chips 0.24 5816.33 Rupees Five Thousand MT
Cmt / 10 Amt i.e. 0.66 Cmt aggregate and asphalt grade 60/70 for Eight Hundred Sixteen And
mixing at the rate of 4.50 % weight of total mix including heating the Paise Thirty Three Only
asphalt and aggregate by continuous batching drum mix plant and
transporting the mix material & spreading Manually and
consolidation with Kuba and flushing sand @ 0.30 Cum / 100 Smt .
including cost of fuel ,hire charges, fire wood , kerosens, labour
charge etc & with contractors own machinaries & drum mix plant
9 1.00 Providing and laying Bituminous Seal Coat using stone chips 0.24 5964.67 Rupees Five Thousand MT
Cmt / 10 Amt i.e. 0.66 Cmt aggregate and asphalt grade 60/70 for Nine Hundred Sixty Four
mixing at the rate of 4.50 % weight of total mix including heating the And Paise Sixty Seven
asphalt and aggregate by continuous batching drum mix plant and Only
transporting the mix material & spreading the same by paver finisher
and consolidation with vibratory roller of 80 KN to 100 KN static
weight and flushing sand @ 0.30 Cum / 100 Smt . including cost of
fuel ,hire charges, fire wood , kerosens, labour charge etc & with
contractors own machinaries & drum mix plant etc .comp.
10 1.00 Providing and laying mix seal surface 20mm thick on pre prepared 6487.32 Rupees Six Thousand MT
as wearing course with specified graded machine crushed Four Hundred Eighty
aggregate pre mixed with bitumen binder of 51 kg/mt of Ashphalt in Seven And Paise Thirty
drum mix plant transporting the mix material on tipper and laying Two Only
with paver finisher to the road level and rolling with vibratory roller of
80 to 100 KN static weight including providing equipment tools and
plants, fire wood, lubricant, kerosine,oil, labour charges using
contractors own Machinaries drum mix plant and paver finisher (
11 1.00 Providing and laying mix seal surface 20mm thick on pre prepared 6290.37 Rupees Six Thousand Two CMT
as wearing course with specified graded machine crushed Hundred Ninety And Paise
aggregate pre mixed with bitumen binder of 51 kg/mt of Ashphalt in Thirty Seven Only
drum mix plant transporting the mix material on tipper and laying
with Manually and consolidation with Kuba and flushing sand @
0.30 Cum / 100 Smt . including cost of fuel ,hire charges, fire wood
kerosens, labour charge etc & with contractors own machinaries &
drum mix plant etc .comp. ( R.A.)
12 1.00 Provdining and laying W.B.M of B.T.M.C metal of size 45 mm to 63 2651.53 Rupees Two Thousand Six CMT
mm size including 0.12 Cu.M. Stone Screeing & 0.08 Cu.M. stone Hundred Fifty One And
dust as filler including spreading, watering & consolidation by Paise Fifty Three Only
vibratory roller 80KN to 100KN static weight. 75 mm thick
13 1.00 Providing laying spreading and compacting 150mm thick granular 2015.59 Rupees Two Thousand CMT
sub base (G.S.B.) with specified material MC BT Metal of size 75 to Fifteen And Paise Fifty
26.5mm 35%, 26.5mm to 4.75mm 45% and below 2.36mm stone Nine Only
dust 20% mix (Grade-I) having C.B.R. not less than 30 incl. mixing
the material at OMC at site and spreading in uniform layer base and
compacting with power roller to achieve the desired density incl. all
materials, labour and machinery, lighting guarding, bracketing and
maintenance of diversion etc. complete as per MORT&H clause
14 1.00 Providing hard side shoulder of 100 mm thick for embankment using 1480.01 Rupees One Thousand Cum
quarry spall with all lead and lift and including watering and rolling Four Hundred Eighty And
and consolidation of sub grade in layers at OMC to required dry Paise One Only
density including filling depression which occur during the process
using vibratory roller of 80 KN to 100 KN (selected quarry spall
having CBR value not less than
15 1.00 Providing and laying 100 mm avg. thick wet mix macadum 2526.44 Rupees Two Thousand Cum
(W.M.M.) GR-II using machine crushed black trap aggregate of 40 Five Hundred Twenty Six
to 50 mm size in the material with water OMC in mechanically mix And Paise Forty Four Only
(pug mill) carriage of mix material by contractors own tipper to site of
work including laying, spreading and compacting in sub base, base
course on well prepared under base of compacting as per MOST
Specification to achieve the desired density (RA)
16 1.00 Supplying and stacking of hard morrum/sand/yellow earth/ binding 369.56 Rupees Three Hundred Cu.M.
materialapproved quality on road site including royalties & filling Sixty Nine And Paise Fifty
measure boxes with all lead and lift etc. road work (R.A) Six Only
17 1.00 Spreading the binding material on road crust filling the gaps in metal 162.22 Rupees One Hundred Cu.M.
and leveling to camber and gradient as directed.(S.O.R. P.No sr.no Sixty Two And Paise
26.23 IT-26020A) Twenty Two Only
18 1.00 Supplying and stacking of machine crushed stone coarse aggregate 1384.47 Rupees One Thousand Cu.M.
chippings etc of hard stone of size 45mm to 63mm size free of Three Hundred Eighty
disintegrated pieces,deleterious and orgenic matter including Four And Paise Forty
royalties & filling measure boxes with all lead and lift etc. completed Seven Only
19 1.00 Spreading the stone aggregate for rolling and W.B.M. including 274.73 Rupees Two Hundred Cu.M.
filling the interstices to required camber and gradient (excluding Seventy Four And Paise
spreading of Blindage)(ii) 40mm to 63mm size aggreagates Seventy Three Only
20 1.00 Provdining and laying W.B.M of B.T.M.C metal of size 45 mm to 90 2909.85 Rupees Two Thousand Cu.M.
mm size including 0.27 Cu.m. stone screening & 0.08 Cu.M. stone Nine Hundred Nine And
dust as filler including spreading, watering & consolidation by Paise Eighty Five Only
vibratory roller 80KN to 100KN static weight.100 mm thick
21 1.00 {As per
cutting the road surface to proper slope and camber for making 114.44 Rupees One Hundred Cu.M.
a base for road work including removing the excavated stuff and Fourteen And Paise Forty
depositing on the road side slope as directed upto 50Mt.lead. (SOR Four Only
22 1.00 Cautionary Warning Sign :-Providing and fixing sing boards made 3808.66 Rupees Three Thousand NO
out of 2mm aluminium sheet; size 90 x 90 x 90 cms. equilateral Eight Hundred Eight And
triangle as per design of IRC-67-1977. Pre treated with phospheting Paise Sixty Six Only
process & acid etching; coated with one coat of epoxy primer and
two coats of best quality epoxy paint ;reflectorised with retro
refiectivesheeting as per latest M.O.S.T.Specifications; 3.1m long
stand postand frame fabricated from suitable sizeiron angle of 35 x
35 x 3mm, 75 x 75 x 6mm as required; painted with bestquality
epoxy coatings in black andwhite bends. The details of symbol
foreach board shall be as per theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation, curing etc.complete under the
supervision of engineer in charge.(A) Engineer Grade(VR)
23 1.00 Regulatory/Mandatory signs :Providing and fixing sing boards made 3439.81 Rupees Three Thousand NO
out of 2mm aluminium sheet; size 60cms. diameter circle as per the Four Hundred Thirty Nine
design of IRC-67-1977 pre treated with phospheting process & acid And Paise Eighty One Only
eteching; coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro refiective sheeting
24 1.00 Direction sign (Junction board):-Providing and fixing sing boards 14831.71 Rupees Fourteen NO
made out of 2mm aluminium sheet; size 244 x 122cms. rectangle as Thousand Eight Hundred
as per the design of IRC-67-1977 Thirty One And Paise
pre treated with phospheting process & acid etching; coated with Seventy One Only
25 1.00 one coat of epoxy primer and two coats of best quality epoxy paint;
Place ideatification sign :-Providing and fixing sing boards made out 9390.66 Rupees Nine Thousand NO
of 2mm aluminium sheet; size 150 x 90cms. rectangle as as per the Three Hundred Ninety And
design of IRC-67-1977 Paise Sixty Six Only
pre treated with phospheting process & acid etching; coated with
26 1.00 one coat
Village of epoxy
name/ Bump primer
signtwo coats of best
:-Providing qualitysing
and fixing epoxy paint;
boards 5045.36 Rupees Five Thousand NO
made out of 2mm aluminium sheet; size 90 x 60cms. rectangle as Forty Five And Paise Thirty
as per the design of IRC-67-1977 Six Only
pre treated with phospheting process & acid etching; coated with
27 1.00 one Eye
Cat coat/of epoxy
Stud andSupplying
/ RPM: two coatsofofMolded
Twinepoxy paint;
Shanks 326.23 Rupees Three Hundred NO
Raised Pavement Markers made of polycarbonate and ABS Twenty Six And Paise
moulded body and reflective panels with micro prismatic lens Twenty Three Only
capable of providing total internal reflection of the light entering the
28 1.00 lens face
marking support
with hot a load
applied of 13635 kgs.
thermoplastic tested
paints within 367.72 Rupees Three Hundred SMT
reflectorising glass beads on bitumin surface providing and laying a Sixty Seven And Paise
hot applied thermoplastic compound 2.5 mm thick including Seventy Two Only
reflectorising glass beads @ 250gms per sqm area, thickness of
29 1.00 2.5mm is excluding
Providing and fixing of surface applied
Hectometer as perglass
typeas per IRC:35-
design including 356.50 Rupees Three Hundred NO
painting, lettering etc. complete.(ii) Fixing in C.C. 1:5:10 Fifty Six And Paise Fifty
It.No.26044B Only
30 1.00 Providing and fixing ordinary Kilometer stone of precast C.C. 1:2:4 1293.39 Rupees One Thousand NO
including necessary reinforcement as per I.R.C. type design in C.C. Two Hundred Ninety Three
1:4:8 including letter and paints etc. complete (For N.H., S.H. and And Paise Thirty Nine Only
31 1.00 Providing and fixing 5th Kilometer stone of precast C.C. 1:2:4 1935.15 Rupees One Thousand NO
including necessary reinforcement as per I.R.C. type design in C.C. Nine Hundred Thirty Five
1:4:8 including painting,lettering etc. complete (For N.H., S.H. and And Paise Fifteen Only
32 1.00 Metal Beam Crash Barrier Type A, "W": Metal Beam Crash Barrier 2815.88 Rupees Two Thousand Rmt
(Providing and erecting a "W" metal beam crash barrier comprising Eight Hundred Fifteen And
of 3 mm thick corrugated sheet metal beam rail, 70 cm above Paise Eighty Eight Only
road/ground level, fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below
ground/road level, all steel parts and fitments to be galvanised by
hot dip process, all fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a spacer of channel
section 150 x 75 x 5 mm, 330 mm long complete as per clause
810)National Highway SOR 2023-24 Ahm Item code 8.23A
33 1.00 Providing and laying Plastic Speed Breaker with yellow and black 2196.75 Rupees Two Thousand Rmt
colour material of approved quality and brand, size (350 mm x 250 One Hundred Ninety Six
mm x 50 mm), including necessary base preparation,Fastening and And Paise Seventy Five
all complete work as per instructions of the engineer.(MR) Only
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
I / We am / are willing to carry out the work at _______________________________________ % above / below percent (should be written
in figure and words) of the estimated mentioned above. Amount of my / our tender works out as under :
Estimated amount put to…................................... Estimated amount put to…...................................
Signature of Deputy Executive Engineer Executive Engineer
the Contractor. Road & Building (P) Sub Division Road & Building (P) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
04 GR (1).pdf
01 SBD Asphalt Patch Work.pdf
Specification Index Asphalt.pdf
SCHEDULE-B Asphalt final Sami.pdf
Valid EMD.pdf
sharto.pdf
Download all tender documents and submit your bid