| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC LALJURI MAKHUMCHERRA NORTH TRIPURA PIN 799270 | NORTH TRIPURA | TRIPURA | 799270 | 1 | Accepted-AOC AOC | |
| 2 | 2₹10.1 L+₹48,789 (5.07%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹10.5 L+₹85,568.40 (8.89%)Rejected-Finance C O LT BHUBESH CH DAS VILL NORTH PADMABIL P S PANISAGAR NORTH TRIPURA | 3 | Rejected-Finance L3 | |
| 4 | 4₹10.7 L+₹1.1 L (11.0%)Rejected-Finance LALJURI KANCHANPUR NORTH DISTRICT TRIPURA | 4 | Rejected-Finance L4 | |
| 5 | 5₹10.9 L+₹1.2 L (12.7%)Rejected-Finance NOORPUR KAILASHAHAR UNAKOTI DISTRICT | UNAKOTI | TRIPURA | 799263 | 5 | Rejected-Finance L5 |
Tender Value
₹12.5 L
EMD Value
₹25,020
Closing Date
18 May 2026, 3:00 pmClosed
The Executive Engineer,Samagra Shiksha
o/o The Executive Engineer,Samagra Shiksha
Construction of 3 nos Kitchen cum store Room at Khakom English Med High School, Yapri Academi High School and Hamsapara High School under Damcherra Block in North Tripura District during the year 2025-26
2026_OSDDS_72727_1
05/EE/ENGG.CELL/SAMAGRA/26-27
Open Tender
Civil Works
Percentage
60 days
North Tripura
Please refer Tender Documents
6 documents required · 6 mandatory
₹1,000
₹25,020
22 Sept 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 1 | Cum | 179.9 | ₹179.72 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. in all kinds of soil | 1 | Cum | 161.3 | ₹161.14 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1,177.3 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 (1:2:4( 1 Cement: 2 fine sand :4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 9,295.7 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:2:4( 1 Cement: 2 fine sand : 4 Well burnt brick aggregate 20 mm nominal size) | 1 | Cum | 11,080.4 | ₹11,069.32 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-1:2:4( 1 Cement: 2 fine sand :4 graded well burnt brick aggregate 20 mm nominal size) | - | Cum | 12,591.1 | - |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | - | Sqm | 390 | - |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for suspended floors,roof,landings,balconies and access platform with timber planks. Chajja | - | Sqm | 417.7 | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars | - | kg | 103.9 | - |
| 10 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | Cum. | 9,845.2 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_74010.xls
BOQ • 0.31 MB
DNIeT.pdf
Tender Documents • 1.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .