Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.6 CrAccepted-AOC | ₹8.6 Cr | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹10.3 Cr+₹1.6 Cr (18.6%)Rejected-AOC | ₹10.3 Cr+₹1.6 Cr (18.6%) | 2 | Rejected-AOC rejected as L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
Tender Value
₹9.9 Cr
EMD Value
₹2 L
Closing Date
28 May 2022, 2:00 pmClosed
Director of Agriculture
Directorate of Agriculture, Vikas Bhavan, Thiruvananthapuram
NABARD RIDF XXVI - INFRASTRUCTURE DEVELOPMENT WORKS AT 1500 ATTUMUKHAM RAJARAMAPURAM KAYAL PADASEKHARAM KAVALAM PANCHAYATH,KUTTANAD, ALAPPUZHA DISTRICT
2022_AGRI_487819_1
ADFW/3694/2022-TG-II(2)
Open Tender
Civil Works - Others
Item Rate
540 days
Kavalam Alappuzha
Please refer tender documents
14 documents required · 14 mandatory
₹10,000
Yes
₹2 L
Yes
Directorate of Agriculture
9 Nov 2022
28 Apr 2022
30 May 2022
28 Apr 2022
28 May 2022
28 Apr 2022
28 Apr 2022 - 28 May 2022
18 May 2022
Amount
INNER PROTECTION WALL FOR BUND
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
od8/2022_2023 : Laying precast slab in position in or under under water for retaining wall foundation bed (1m length *1.25 m breadth*0.10 m thickness slab) labor charges of placing in position into lines and levels , conveyance , loading and unloading etc.rate of precast slab paid separately.
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od5343/2021_2022 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:<br>Cement mortar 1:6 (1 cement : 6 coarse sand) (without bond stone) (7.1.1)
BUND RAISING USING CLAY
od5236/2021_2022 : Modified 2.6.1Formation of earthern bund using hard stiff clay by earth work in excavation by mechanicalmeans (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to belevelled and neatly dressed All kinds of soil
od5257/2021_2022 : supplying and laying coir geo textiles of approved specification with the help of bamboo nailon the slopes of bund to prevent erosion as per the direction of engineer in charge
TBAS CONSTRUCTIONS
Bidder Name
TBAS CONSTRUCTIONS
C P Balakrishna Pillai
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .