Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC KOTTAKKAL TIRUR MUNICIPALITY KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.1 L+₹17,726 (1.99%)Rejected-AOC PRAVEEN VILLA VEEDU VALAVANNUR P O MALAPPURAM 676555 | 676555 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHANDAS P L1 | ALI C L2 |
|---|---|---|---|---|---|
| 1.00Premonsoon works | |||||
| 1.00 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 552 | sqm | 30 ₹16,560 Lowest | 32 ₹17,664 |
| 1.00 | OD44094/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming
to get a compact surface including of cost of material, laying charges, transportation to site etc
complete Rate is arrived for a bag of 25kg | 100 | each | 806 ₹80,600 Lowest | 826 ₹82,600 |
| 1.00 | OD44092/2026-2027:Engaging woodcutter with tool and accessories required for cutting trees/branches of trees any grith overhanging above any structure including staking of serviceable material and disposal of unserviceable materials with out making any damages to nearby structure etc. | 35 | Day | 1,524 ₹53,340 Lowest | 1,524 ₹53,340 Lowest |
| 1.00 | OD44093/2026-2027:Engaging tipper | 72 | hour | 790 ₹56,880 Lowest | 790 ₹56,880 Lowest |
| 1.00 | OD44090/2026-2027:Engaging JCB/Excavator | 72 | hour | 1,474 ₹1,06,128 Lowest | 1,500 ₹1,08,000 |
| 1.01 | OD44091/2026-2027:Engaging man mazdoor where ever required | 510 | each | 1,086 ₹5,53,860 Lowest | 1,111 ₹5,66,610 |
| 1.01 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.41 | Hectare | 52,622 ₹21,364.53 Lowest | 52,622 ₹21,364.53 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,178
Closing Date
22 Jun 2026, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Roads Subdivision ,Tirur
GENERAL-Premonsoon work - 2026-27- Urgent Premonsoon works on various PWD roads having no RC work under Tirur roads section for a length of 35.3 km- Total 2 Nos of roads in Tirur LAC and Tanur LAC-General Civil Work
2026_PWD_856243_1
PWD/RB/2545/2026-2027 Dated 17-06-2026
Open Tender
Civil Works - Roads
Item Rate
60 days
TIRUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
₹21,178
Yes
23 Jul 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
22 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Premonsoon works | |||||
| 1.001 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | - | sqm | - | - |
| 1.002 | OD44094/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming
to get a compact surface including of cost of material, laying charges, transportation to site etc
complete Rate is arrived for a bag of 25kg | - | each | - | - |
| 1.003 | OD44092/2026-2027:Engaging woodcutter with tool and accessories required for cutting trees/branches of trees any grith overhanging above any structure including staking of serviceable material and disposal of unserviceable materials with out making any damages to nearby structure etc. | - | Day | - | - |
| 1.004 | OD44093/2026-2027:Engaging tipper | - | hour | - | - |
| 1.005 | OD44090/2026-2027:Engaging JCB/Excavator | - | hour | - | - |
| 1.006 | OD44091/2026-2027:Engaging man mazdoor where ever required | - | each | - | - |
| 1.007 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1447287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1447287.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .