| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35,000Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹38,744+₹3,744 (10.7%)Accepted-AOC | L2 | Accepted-AOC L2 |
| Sl No | Description | Qty | Unit | Sumesh M.S L2 | GOGIL KRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00Disconnection of unwanted public taps | |||||
| 1.00 | 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 5 | Disconnection | 1,098 ₹5,490 | 800 ₹4,000 Lowest |
| 1.00 | 100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 10 | Disconnection | 1,125 ₹11,250 | 850 ₹8,500 Lowest |
| 1.00 | 100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 10 | Disconnection | 1,120 ₹11,200 | 1,000 ₹10,000 Lowest |
| 1.00 | OD197616/2024-2025:For additional wok Excavating trenches of required width for pipes, cables, etc including
excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the
excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including
consolidating<br>each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as
directed, within a lead of 50 m :r|n<br>All kinds of soil r|n(Ref. Item No. 2.10.1 of DSR) | 6 | cum | 534 ₹3,204 Lowest | 1,000 ₹6,000 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 7,600 ₹7,600 | 6,500 ₹6,500 Lowest |
Tender Value
₹40,915
EMD Value
₹1,023
Closing Date
3 Apr 2025, 2:00 pmClosed
Assistant Executive Engineer
PH Sub Division Pathanamthitta
DEPOSIT-Disconnection of unused public taps in Mallappuzhassery Grama Panchayath-2025- Pipeline Work
2025_KWA_756206_1
38/2024-25/AEE/PH/PTA
Open Tender
Civil Works - Water Works
Item Rate
Pathanamthitta
Please refer Tender documents.
11 documents required · 11 mandatory
₹335
₹1,023
20 Aug 2025
28 Mar 2025
4 Apr 2025
28 Mar 2025
3 Apr 2025
28 Mar 2025
Amount
Disconnection of unwanted public taps
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
OD197616/2024-2025:For additional wok Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating<br>each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :r|n<br>All kinds of soil r|n(Ref. Item No. 2.10.1 of DSR)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Sumesh M.S (BID ID -2185381)
Bidder Name
GOGIL KRISHNAN
Sumesh M.S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1228162.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .