Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.8 LAccepted-AOC GOA | NORTH GOA | GOA | 403524 | L1 | Accepted-AOC L1 offer | |
| 2 | L2₹74.8 LSame as L1Rejected-Finance 4 243 A2 MAGIC MARVEL BLDG BILWAN WADDO PEDDEM MAPUSA GOA | NORTH GOA | GOA | 403001 | L2 | Rejected-Finance Second Lowest bidder | |
| 3 | L3₹74.8 L+₹0.04 (<0.01%)Rejected-Finance | L3 | Rejected-Finance Third Lowest bidder |
Tender Value
₹93.5 L
EMD Value
₹1.9 L
Closing Date
11 Sept 2023, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of retaining wall from Ulhas Naik House to Jeevan Gadekar house and others at Zorichebhat in ward No. 7 V.P. Carambolim in Tiswadi Taluka.
2023_WRD_10539_1
6-9/WDI/WRD/ASW/2023-24/e-14/1
Open Tender
Miscellaneous Works
Item Rate
120 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.9 L
28 Dec 2023
14 Aug 2023
12 Sept 2023
14 Aug 2023
11 Sept 2023
14 Aug 2023
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : A) All kinds of soil
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a) Upto 2.5 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) a) Upto 2.5 meters long pile
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering & shuttering including Strutting, Propping & removal of forms for : A) Foundations, Footings, Bases for columns
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto Plinth Level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge b) 75 mm dia
NOON CONSTRUCTION
DEEPTEJ CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .