Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12 LAccepted-AOC | L1 | Accepted-AOC Accepted and contract awarded | |
| 2 | L2₹8 L+₹288.41 (10.8%)Accepted-AOC | L2 | Accepted-AOC Accepted and contract awarded |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
16 Aug 2023, 2:00 pmClosed
The Superintending Engineer TANGEDCO DEDC Dharmapu
Office of the Superintending Engineer Dharmapuri Electricity Distribution Circle TNEB Building Salem Main Road Dharmapuri 636705
TRANSPORTATION OF VARIOUS SIZE OF POLES FROM VARIOUS DESTINATIONS TO DHARMAPURI CIRCLE
2023_EB_351753_1
ET/024/2023-24 Dt.20.07.2023
Open Tender
Shipping/ Transportation/ Vehicle
Works
The Superintending Engineer TANGEDCO DEDC Dharmapu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
12 Oct 2023
28 Jul 2023
17 Aug 2023
28 Jul 2023
16 Aug 2023
28 Jul 2023
Amount
Transportation of 8.0m(200 Kg) PSC poles from Various loaction of Tamil Nadu to Dharmapuri EDC. Including loading, transporting, unloading, stacking, etc.,(For any damage to the poles/ labourers involved during Loading, Transporting, Unloading, Stacking etc., the Transport Contractor is solely responsible.)
0-20 KM / POLE / KM
20 - 50 KM / POLE / KM
50 - 100 KM / POLE / KM
100 - 150 KM / POLE / KM
150 - 210 KM / POLE / KM
Transportation of 9.0m(300Kg) PSC poles from Various loaction of Tamil Nadu to Dharmapuri EDC. Including loading, transporting, unloading, stacking, etc.,(For any damage to the poles/ labourers involved during Loading, Transporting, Unloading, Stacking etc., the Transport Contractor is solely responsible.)
0-20 KM / POLE / KM
20 - 50 KM / POLE / KM
50 - 100 KM / POLE / KM
100 - 150 KM / POLE / KM
150 - 210 KM / POLE / KM
Transportation of 9.0m(400Kg) PSC/ REC square poles from Various loaction of Tamil Nadu to Dharmapuri EDC. Including loading, transporting, unloading, stacking, etc.,(For any damage to the poles/ labourers involved during Loading, Transporting, Unloading, Stacking etc., the Transport Contractor is solely responsible.)
0-20 KM / POLE / KM
20 - 50 KM / POLE / KM
50 - 100 KM / POLE / KM
100 - 150 KM / POLE / KM
150 - 210 KM / POLE / KM
E.P.F. @ 13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
GST @ 18 % should be Entered by the Bidder (on 1 to 4)
SRI ABIRAMI CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .