Loading…
Loading…
Tender Value
₹76.7 Cr
EMD Value
₹1.5 Cr
Closing Date
6 Aug 2026, 6:00 pm
Chief Engineer (Tech), PGVCL, Corporate Office, Rajkot
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All Items/Material required to complete works for Turnkey Based Contract For Conversion of Existing overhead LT Line Network Including Consumer Service Lines Into Under Ground Cable Network using FSP/MSP & Ring Main System at Prahlad Plot Sub Division of Rajkot City-1 Division of Rajkot City Circle Under PGVCL with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging under Gujarat Wire Free City Mission. (Package-1)
322470
PGVCL/Tech/UG LT/RCC P1/2026-27/12
Open
Electrical Works
Turn-key
Rajkot
21 documents required · 20 mandatory · 1 optional
₹17,700
PASCHIM GUJARAT VIJ COMPANY LIMITED, Rajkot
₹1.5 Cr
11 Jul 2026
11 Jul 2026
11 Jul 2026
6 Aug 2026
11 Jul 2026
Conversion of LT Over Head to Underground Network
Prahladplot Sdn of Rajkot City Circle
Particulars of Item Grand Total in Rs.
Particulars of Item Grand Total in Rs.
SCHEDULE-B: CONVERSION OF EXISTING OVERHEAD ELECTRICAL LT NETWORK
IN TO UNDERGROUND CABLE NETWORK
a FOR SUPPLY PART
b FOR ERECTION PART
A TOTAL AMOUNT (WITHOUT GST)
A TOTAL AMOUNT (WITHOUT GST)
2 BIDDER'S OFFER ( + / - ) IN %
3 BIDDER'S OFFER ( + / - ) IN RUPEES
B OFFERED TOTAL AMOUNT FOR SUPPLY AND ERECTION (WITHOUT GST)
B OFFERED TOTAL AMOUNT FOR SUPPLY AND ERECTION (WITHOUT GST)
4 GST @ 18% ON "C"
D GRAND TOTAL (WITH GST )
D GRAND TOTAL (WITH GST )
Date Signature of Bidder
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND LT ELECTRICAL NETWORK
Providing & erecting XLPE(IS:7098) (I)-88 ISI marked multistrand
Aluminium conductor armoured cable ,sand for 1.1 kV to be laid on
pole or in existing cable trence/pipe at road crossing of following
size of cables. Work carried out up to consumer premises with
meter shifting, and provide load side cable as per site conditions
and as per EIC. For consumer premises DWC pipe should be
provieded(With Excavation, back filling and sand as per technical
LT CABLE TERMINATION:Cable termination on FSP,LT
Distribution Transformer Box,MSP/SFU /Busbar etc of pole mounted
transformer of LT cable grade as specified below including
cutting,stripping of cable,insulations,providing compression type
terminals,suitable cable glands,crimping lugs with necessary
connections.Work carried out up to consumer premises with meter
shifting, and provide load side cable as per site conditions and as
per EIC. For consumer premises DWC pipe should be provieded.
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
3 Lying of all types of cable in trench(without Excavation) Mtrs. 6921.80 172.50 1194010.50
4 Lying of cable on pole Mtrs. 692.18 43.70 30248.27
5 Lying of the cable in the Pipe(Without Excavation) Mtrs. 69.22 57.50 3980.15
6 Drilling work in Road Crossing through push through Mtrs. 3460.90 569.25 1970117.33
Drilling work in Road/ASPH/RCC /Hard Rock Etc(Excavation
with back filling as per the specification of cable lying)
8 Supply, intstallation of the DWC pipe(Without Excavation)
Lt cable saddling works: Direct cable saddleing with wall and etc for
this work GI type saddle and nail shall be used.
Supply, Installation, Testing, Commissioning of Half Round
pipe(1000mm Length, 4 inch dia, 1 inch thick)
PRE BONDING TAP: For laying on trench after laying cable on
11 trech to provide indication cable route below land surface in Mtrs. 67524.00 17.25 1164789.00 67524.00 5.75 388263.00
underground trench to protect cable for mechnical injuries.
CABLE TERMINAL FERRULS: The PVC Cable terminal ferruls for
identification of phase sequence and feeder/PSS/FSP name of
12 HT/LT cables shall be provided at every termination of all cables Nos 54128.00 27.60 1493932.80 54128.00 9.20 497977.60
stating detail as under. HT Cable :Feeder name/Phase(R/Y/B) LT
Cable : TC/FSP name/Phase(R/Y/B/N)
CABLE TAG: The PVC tag for identification of
feeder/PSS/FSP/RMU name of HT/LT cables shall be provided
at every 30 MTR HT
Feeder: Substation/Feeder LT Feeder : PSS/Transformer/FSP
EARTHING PIT : Supplying & erecting earth pit of minimum bore
dia. 150 mm size approved make safe Earthing Electrode consisting
Pipe in pipe Technology as per IS 3043-1987 made of corrosion
free G.I. Pipes having Outer pipe dia of 50 mm having 80-200
Micron galvanising connections, terminal dia of 12 mm with constant
ohmic value surrounded by highly conductive compound with high
charge dissipation with civil works of earthing chamber. For
Electrical installation covering Transformer neutrals,HT & LT
switchgears for independent earthing in normal soil, Length of Pipe
3 mtrs.Backfilling compound 2 bags of 25 Kg each.
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Supply installation & commissioning of earthing conductor 38 x
G.I. strip for pole mounted transformer and upto
15 FSP,RMU,MSP,SFU, Busbar Etc as well as connection to be made Mtrs. 14224.00 158.70 2257348.80 14224.00 59.80 850595.20
to the earth pit and insulation with appropriate size of HDPE pipe.
Rates inclusive of hot dipped hardwares.
Obtaining statutory approval from Electrical Inspector for
installation of the system.
17 DISMENTALLING:
Dismentallling RCC/Rail pole with cross
arm,insulators,hardwares,stay, etc.and return it to discom
store.While dismentalling utmost care shall be taken so that the
material so that the same can be reused by discom.
Dismentalling of AAAC/ACSR/ABC/ Earth wire any size of conductor
b & line material & after making coil and stacking the same at discom Km. 61.16 2300.00 140668.00
store.Routte length
Dismentalling of any type of service connection from the site and
material return to DISCOM store as per directive of EIC
FSP (FUSE SECTION PILLER): 4 Way
Supplying and erecting 120x100x40 cms. Fuse section pillar
fabricated from 4 mm Thermosetting Plastic ( moulded in a single
piece ) i.e Glass Reinforced Polyester sheet Moulding Compound
(SMC ) or metal body(As per Specification and drawings) with cable
clamps to be burried in ground to have appropriate erection on look
unifrom unit erected with cement concrete foundation and 45 cms
high brick masonry internal supported on both side with intrnal and
i outer side locking arrangement with lock and keys in duplicate
.Incoming switchgear SFU of TPN and outgoing HRC SMC fuse
base and knife type links 32 Amp to 630 Amp capacity fuse base
fitted on 630 Amp current capacity copper Busbar with RYB colour
coding and insulated strip with all internal connections and entry for
incomming up to 1 core 300/400 sq mm 4 nos and outgoing 3 nos.
31/2 core cables of suitable sizes. (As per Technical specification of
FSP ) (Erection shall be carried out as per approved drawing and
site condition) (SFU Amp Capcity is as under)
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
FSP (FUSE SECTION PILLER): 6 Way
Supplying and erecting 120x100x40 cms.Fuse section pillar
fabricated from 4 mm Thermosetting Plastic ( moulded in a single
piece ) i.e Glass Reinforced Polyester sheet Moulding Compound
(SMC ) or metal body(As per Specification and drawings) with cable
clamps to be burried in ground to have appropriate erection on look
unifrom unit erected with cement concrete foundation and 45 cms
high brick masonry internal supported on both side with intrnal and
ii outer side locking arrangement with lock and keys in duplicate
.Incoming switchgear SFU of TPN and outgoing HRC SMC fuse
base and knife type links 32 Amp to 630 Amp capacity fuse base
fitted on 630 Amp current capacity copper Busbar with RYB colour
coding and insulated strip with all internal connections and entry for
incomming 1 core 300/400 sq mm 4 nos and outgoing 5 nos. 31/2
core cables of suitable sizes. (As per Technical specification of FSP
) (Erection shall be carried out as per approved drawing and site
condition)(SFU Amp Capcity is as under)
MSP(Mini Section Piller) : 4 Way Supplying and erecting
120x100x40 cms. Mini section pillar fabricated from 4 mm thick
Thermosetting Plastic(moulded in a single piece) i.e. Glass
Reinforced Polyester Sheet Moulding Compound (SMC) or Metal
Body Type Enclouser(As per Specification) with cable clamps to be
burried in ground to have appropriate erection on look uniform unit
erected with cement concrete foundation and 45 cms high brick
masonary internal supported on both side with internal and outer
side locking arrangement with lock and keys in duplicate. Incoming
HRC SMC fuse base and kinfe type links 32 Amp to 250 Amp.
capacity, fuse base fitted on 250 Amp. current capacity copper
Busbar with RYB colour coding and insulated strip with all internal
connections and entry for incoming up to 3.5 Core 300 Sq.mm
Nos. and outgoing 3 nos. 3.5 core cables of suitable sizes.( As per
Technical specification of MSP)
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
MSP(Mini Section Piller) : 6 Way Supplying and erecting
120x100x40 cms. Mini section pillar fabricated from 4 mm thick
Thermosetting Plastic(moulded in a single piece) i.e. Glass
Reinforced Polyester Sheet Moulding Compound (SMC) or Metal
Body Type Enclouser(As per Specification) with cable clamps to be
burried in ground to have appropriate erection on look uniform unit
erected with cement concrete foundation and 45 cms high brick
ii masonary internal supported on both side with internal and outer
side locking arrangement with lock and keys in duplicate. Incoming
HRC SMC fuse base and kinfe type links 32 Amp to 250 Amp.
capacity, fuse base fitted on 250 Amp. current capacity copper
Busbar with RYB colour coding and insulated strip with all internal
connections and entry for incoming up to 3.5 Core 300 Sq.mm
Nos. and outgoing 5 nos. 3.5 core cables of suitable sizes.( As per
Technical specification of MSP)
MSP(Mini Section Piller) : 8 Way
Supplying and erecting 120x100x40 cms. Mini section pillar
fabricated from 4 mm thick Thermosetting Plastic(moulded in a
single piece) i.e. Glass Reinforced Polyester Sheet Moulding
Compound (SMC) with cable clamps to be burried in ground to have
appropriate erection on look uniform unit erected with cement
concrete foundation and 45 cms high brick masonary internal
supported on both side with internal and outer side locking
iii arrangement with lock and keys in duplicate. Incoming HRC SMC
fuse base and kinfe type links 32 Amp to 250 Amp. capacity, fuse
base fitted on 250 Amp. current capacity copper Busbar with RYB
colour coding and insulated strip with all internal connections and
entry for incoming up to 3.5 Core 300 Sq.mm 1 Nos. and outgoing
nos. 3.5 core cables of suitable sizes.( As per Technical
specification of MSP)
Supply, Instalation, Testing, Commissioning switch fuse unit made
by metal box and capacity of 125 A, Mostaly used in flat/Socity area.
Installation worked caried out with instruction of EIC. And as per the
drawing approved by CA- Minimum 16 Nos. of CKT
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
CABLE ROUTE MARKER: Providing and erecting RCC cable route
marker as per drawing No. discom/R&D/RM-001 duly marked with
"DANGER" mark, "discom POWER CABLE" and arrow of route of
DRAWING: Preparing complete drawing of entire network as well as
individual feeder map showing joints also in AutoCad and providing
22 the same to PGVCL in AutoCad copy as ell as pdf copy and hard Job 0.00 11.00 57500.00 632500.00
copy in six sets. The drawing should be geographical indicating all
directions ( Per Job per Feeder )
FENCING: FRP Fencing for FSP/MSP/SFU/BUSBAR, post shall
be made out of FRP Pultruded hollow section of size
50x50x5mm.. and shall be grouted in the ground with c. c. of
ratio 1:3:6., Sub frame provided using hollow FRP section
50x25x5mm or FRP angles 50x50x5 at top and bottom and
other accessories for fixing of gates etc. Rails shall be made
out of FRP notch bars of 12mm dia, Pickets shall be made of
flats of size 35x5mm SMC or FRP as per specifications
Paint Pointed Letter 2 inch size(Marking on FSP, MSP, SFU Etc In
24 any palce.(As per directive of Engineer Incharge) with supply of Ea 13532.00 5.18 70028.10
25 HRC Fuse and its Fuse base(Spare)
26 Jointing Kit for LT Cale
Backfilling and Restoration work including
removing/demolition of existing
SCHEDULE-B: CONVERSION OF OVERHEAD TO UNDERGROUND ELECTRICAL NETWORK
Sr. Unit Rate in Total Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Particulars of Item Unit Supply Qty. Erection Qty. Unit Rate in Rs Grand Total
Demolition & Providing and lauying cement concrete 1:2:4(1-
Cement:2-coarse sand:4-hand broken stone agreegates 40 mm
nominal size) and suirng complete excluding cost of romwork (For
0.15m thick concrete)
Removing & Re-fixing Paver block/re-xast Rubber Dye / steel Dye
Inter locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed/vibrated mechanically and as per
approved design confirming to IS 15658:2006 including 35mm Sand
layer of levelling and filling the joint with sand in proper line and level
as directed by EIC.
18% GST on Total Amount in Rs.
18% GST on Total Amount in Rs.
Grand Total With GST@ 18% in Rs.
Grand Total With GST@ 18% in Rs.
Grand Total With GST@ 18% in Cr.
Grand Total With GST@ 18% in Cr.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
5. Declaration of Authorised person and Confict of Interest.pdf
1.UGC-Turnkey-PGVCL-Part-I Package 1.pdf
2.Employers requirement WFC.pdf
3.UGC-Turnkey-PGVCL-CoC.pdf
4. Technical Specifications.pdf
6. Reference Tender Drawing Robust Network.pdf
7. Acceptance of Bank Guarantee as SD and EMD.pdf
8. BOQ LT UG RCC P1 Prahlad Plot Sdn.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].