Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC | ₹4.3 L | 1 | Accepted-AOC within the estimated cost. |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Binoy Mazumder AMC Streetlight and Civil Work L1 |
|---|---|---|---|---|
| 1.00 | Dismantling of Streetlight fitting for repair and refitting after repair | 180 | Nos | 450 ₹81,000 Lowest |
| 2.00 | Installation of New / old repaired Streetlight fitting on existing pole | 200 | Nos | 380 ₹76,000 Lowest |
| 3.00 | Minor repair work to be attended on the spot without dismantling the fitting from the pole | 80 | Nos | 210 ₹16,800 Lowest |
| 4.00 | Dismantling of existing streetlight fitting | 210 | Nos | 190 ₹39,900 Lowest |
| 5.00 | Dismantling of Streetlight timer switches for repair and refitting after repair. | 4 | Nos | 5 ₹20 Lowest |
| 6.00 | Installation of New streetlight timer switches | 4 | Nos | 5 ₹20 Lowest |
| 7.00 | Replacement/New Installation of defective Cutout / MCBs/Circuit Breakers | 6 | Nos | 5 ₹30 Lowest |
| 8.00 | Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse | 6 | Nos | 5 ₹30 Lowest |
| 9.00 | Switching ON/OFF of streetlights circuits through Cutout operation. | 3,285 | Nos | 30 ₹98,550 Lowest |
| 10.00 | Charges for engaging staff per month for attending upto 20 complaints. | 12 | Months | 9,500 ₹1,14,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
2 Oct 2025, 5:00 pmClosed
Pradhan Gram Panchayat Humfrygunj
Gram Panchayat Humfrygunj
Streetlight annual Maintenance contract(AMC) under Gram Panchayat Humfrygunj
2025_RDPRI_20065_1
25/GPHG/AMC/2025-26/185
Open Tender
AMC/ Maintenance Contracts
Works
Gram Panchayat Humfrygunj
Please refer Tender documents.
9 documents required · 9 mandatory
₹100
Payable To
₹5,000
Yes
29 Oct 2025
25 Sept 2025
3 Oct 2025
25 Sept 2025
2 Oct 2025
26 Sept 2025
Amount
Dismantling of Streetlight fitting for repair and refitting after repair
Installation of New / old repaired Streetlight fitting on existing pole
Minor repair work to be attended on the spot without dismantling the fitting from the pole
Dismantling of existing streetlight fitting
Dismantling of Streetlight timer switches for repair and refitting after repair.
Installation of New streetlight timer switches
Replacement/New Installation of defective Cutout / MCBs/Circuit Breakers
Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse
Switching ON/OFF of streetlights circuits through Cutout operation.
Charges for engaging staff per month for attending upto 20 complaints.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .