| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-Finance | ₹28.1 L | L1 | Accepted-Finance Qualified |
| 2 | L2₹28.4 LRejected-Finance NO 51 5 AMMAN NAGAR SUNDAR NAGAR TIRUCHIRAPPALLI 620021 | TIRUCHIRAPPALLI | TAMIL NADU | 620021 | ₹28.4 L | L2 | Rejected-Finance Unqualified |
| 3 | L3₹29.8 LRejected-Finance | ₹29.8 L | L3 | Rejected-Finance Unqualified |
| Sl No | Description | Qty | Unit | R MURUGAN L1 | R RENGASAMY L2 | MANOHARAN AND CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 4,728 | sqm | 6.36 ₹30,070.08 | 6.42 ₹30,353.76 | 6.5 ₹30,732 |
| 2.00 | 2.collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | 1,815 | cum | 147.2 ₹2.7 L | 148.68 ₹2.7 L | 220 ₹4.0 L |
| 3.00 | Providing and Laying Gravel to 150mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 1,959.6 | cum | 368.43 ₹7.2 L | 372.11 ₹7.3 L | 405 ₹7.9 L |
| 4.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete | 59.1 | cum | 263.78 ₹15,589.40 | 266.42 ₹15,745.42 | 300 ₹17,730 |
| 5.00 | Supplying and filling in basement with filling M sand in layer of not more than 15 cm thick well rammed etc., complete. | 3.82 | cum | 1,967.8 ₹7,517 | 1,987.5 ₹7,592.25 | 2,000 ₹7,640 |
| 6.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 3.82 | cum | 5,733.43 ₹21,901.70 | 5,790.8 ₹22,120.86 | 5,500 ₹21,010 |
| 7.00 | Cement concrete 1:3:6 mix ( one cement three sand and six aggregate ) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 66.78 | cum | 6,008.77 ₹4.0 L | 6,069 ₹4.1 L | 5,600 ₹3.7 L |
| 8.00 | Cement concrete 1:2:4 mix ( one cement two sand and four aggregate ) using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 2.53 | cum | 7,040.49 ₹17,812.44 | 7,110.9 ₹17,990.58 | 7,000 ₹17,710 |
| 9.00 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 4.57 | cum | 9,370.82 ₹42,824.65 | 9,464.55 ₹43,252.99 | 8,000 ₹36,560 |
| 10.00 | Supplying and Fabricating and placing in position MS steel or Ribbed or Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification | 0.35 | mt | 91,957.3 ₹32,185.06 | 92,877 ₹32,506.95 | 88,000 ₹30,800 |
Updated dates
Tender Value
₹28.4 L
EMD Value
₹29,000
Closing Date
5 Jan 2026, 4:00 pmClosed
BDO (BP)
Mannachanallur Panchayat Union
Construction of 1.50m Span RCC Culvert,Retaining Wall Arrangements and Formation of the Approach Road at No.2 Kariyamanickam to Sirugambur road - Karatampatti -Vathalai Sithampur road in No.2 kariyamanickam panchayat.in Mannachanallur Block,Tiruchir
2025_RDTN_635343_1
A2/4516/2025
Open Tender
Civil Works - Roads
Mannachanallur Panchayat Union
Construction of 1.50m Span RCC Culvert,Retaining Wall Arrangements and Formation of the Approach Road at No.2 Kariyamanickam to Sirugambur road - Karatampatti -Vathalai Sithampur road in No.2 kariyamanickam panchayat.in Mannachanallur Block,Tiruchir
5 documents required · 5 mandatory
₹0
₹29,000
Yes
Mannachanallur Panchayat Union
5 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
24 Dec 2025
Amount
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
2.collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and Laying Gravel to 150mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete
Supplying and filling in basement with filling M sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cement concrete 1:3:6 mix ( one cement three sand and six aggregate ) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cement concrete 1:2:4 mix ( one cement two sand and four aggregate ) using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed or Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and Fixing of PVC Pipe Weep Holes in etc.,
Supplying and Fixing of Bitumen Pad in etc.,
Supplying and Fixing of Tar Paper in etc.,
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete
Supplying and filling in basement with filling M sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cement concrete 1:3:6 mix ( one cement three sand and six aggregate ) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and Fixing of PVC Pipe Weep Holes in etc.,
Provision for Name board Arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R RENGASAMY (BID ID -1549102)
MANOHARAN AND CO (BID ID -1545356)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Pricebid.pdf
Additional Documents • 0.66 MB
Techbid.pdf
Additional Documents • 0.81 MB
BOQ_760311.xls
BOQ • 0.29 MB
NIT.pdf
Tender Documents • 0.13 MB
Download all tender documents and submit your bid