| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | ₹10.7 L Quoted ₹9.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹9.3 LRejected-Finance WARD NO 14 CHURCHA COLLIERY DISTT KORIYA C G PIN 497339 | KOREA | CHHATTISGARH | 497339 | ₹9.3 L | L2 | Rejected-Finance L2 bidder |
| 3 | Rejected-Technical A25 WARD 04 PAURADHAR NEAR SIV MANDIR DOOMAR KACHHAR RAJNAGAR DIST ANUPPUR MP 484446 | RAJNAGAR | ANUPPUR | MADHYA PRADESH | 484446 | - | - | Rejected-Technical Work experience not uploaded as per NIT |
| Sl No | Description | Qty | Unit | NAIMUDDIN ANSARI L1 | ravindra kumar gupta L2 |
|---|---|---|---|---|---|
| 1.00Description of Work | |||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 58.8 | Cum | 687.4 ₹40,419.12 | 706.3 ₹41,530.44 |
| 2.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 5.7 | Cum | 1,731.2 ₹9,867.84 | 1,779.1 ₹10,140.87 |
| 3.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 ) | 4 | Cum | 6,096.9 ₹24,387.6 | 6,265.3 ₹25,061.2 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 ) | 66.76 | Cum | 6,702.7 ₹4,47,472.25 | 6,887.8 ₹4,59,829.53 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 380.4 | Sqm | 410.6 ₹1,56,192.24 | 421 ₹1,60,148.4 |
| 6.00 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 380.4 | Sqm | 386.9 ₹1,47,176.76 | 397.6 ₹1,51,247.04 |
| 7.00 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 109.79 | Cum | 264.3 ₹29,017.5 | 271 ₹29,753.09 |
| 8.00 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 109.79 | Cum | 192.3 ₹21,112.62 | 197.6 ₹21,694.5 |
| 9.00 | Lead for transportation of materials for every 15 mtr or part by head load for 50 m. (02 Leads) ( Sl No.- 7 of GMSOR 2018) | 109.79 | Cum | 262.1 ₹28,775.96 | 269.3 ₹29,566.45 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹14,700
Closing Date
17 Nov 2025, 5:00 pmClosed
GM (Oprn.), Baikunthpur Area
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 08 Nos. PCC Ventilation Stopping in 85L East proposed depillaring Panel of West Block of Churcha Mine (RO).
2025_SECL_346579_1
SECL/BKP/GMO/25-26/CW/eT/18 Dated 01.11.2025
Open Tender
Civil Works - Others
90 days
West Block of Churcha Mine (RO)
Please refer Tender document
4 documents required · 4 mandatory
₹14,700
30 Dec 2025
1 Nov 2025
18 Nov 2025
2 Nov 2025
17 Nov 2025
2 Nov 2025
2 Nov 2025 - 5 Nov 2025
Amount
Description of Work
Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 )
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018)
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 )
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 )
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 )
12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018)
Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018)
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018)
Lead for transportation of materials for every 15 mtr or part by head load for 50 m. (02 Leads) ( Sl No.- 7 of GMSOR 2018)
Total impact of GST for the purpose of CTC
ravindra kumar gupta (BID ID -1196386)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Document
0.17 MB
Document
1.38 MB
Document
0.73 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid