Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | 1. FO transfer pump | ALLWEILER INDIA PRIVATE LIMITED | 3 | - |
| 2 | 2. LO transfer pump | ALLWEILER INDIA PRIVATE LIMITED | 3 | - |
| 3 | 3. Bilge transfer pump | ALLWEILER INDIA PRIVATE LIMITED | 3 | - |
| 4 | 4. Portable LO transfer pump | ALLWEILER INDIA PRIVATE LIMITED | 3 | - |
| 5 | 5. Fuel oil stripping pump | ALLWEILER INDIA PRIVATE LIMITED | 3 | - |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
10 Feb 2025, 3:00 pmClosed
1. FO transfer pump
2. ONBOARD SPARES
3. DOCUMENTATION
4. Tools
consumables etc
5. CLASS INSPECTION CHARGES BIDDER TO QUOTE LS COST PER SHIPSET
6. SERVICE ENGINEER CHARGES BIDDER TO QUOTE LS COST PER SHIPSET
7. TRAINING CHARGES BIDDER TO QUOTE LS COST PER SHIPSET
8. EXTENDED WARRANTY BIDDER TO QUOTE LS COST FOR ONE YEAR PER SHIPSET
9. De preservation and re preservation charges as per TTS
1. LO transfer pump
1. Bilge transfer pump
1. Portable LO transfer pump
1. Fuel oil stripping pump
1. Sludge transfer Dirty oil transfer pump
7360890
GEM/2025/B/5805904
Two Packet Bid
1. FO transfer pump
1200 days
Andhra Pradesh; Visakhapatanam
Group wise evaluation
BOQ
5 documents required · 5 mandatory
Exempted
27 Mar 2025
10 Jan 2025
10 Feb 2025
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | 1. FO transfer pump | Pump along with its accessories and special cables , Including Packing , Initial preservation for 24 months, Transportation & Insurance (AS PER SOTR). | 10 | Nos | [email protected] | 1200 |
| 2 | 2. ONBOARD SPARES | ONBOARD SPARES (AS PER SOTR) | 5 | ship sets | [email protected] | 1200 |
| 3 | 3. DOCUMENTATION | DOCUMENTATION (AS PER SOTR) | 5 | ship sets | [email protected] | 1200 |
| 4 | 4. Tools, consumables etc | Tools, Spares, Consumables & test kits/equipments required towards installation, Commissioning, HATs & SATs. | 5 | ship sets | [email protected] | 1200 |
| 5 | 5. CLASS INSPECTION CHARGES BIDDER TO QUOTE LS COST PER SHIPSET | CLASS INSPECTION CHARGES PER SHIPSET | 5 | ship sets | [email protected] | 1200 |
| 6 | 6. SERVICE ENGINEER CHARGES BIDDER TO QUOTE LS COST PER SHIPSET | SERVICE ENGINEER CHARGES AS LUMPSUM VALUE (AS PER SOTR) | 5 | ship sets | [email protected] | 1200 |
| 7 | 7. TRAINING CHARGES BIDDER TO QUOTE LS COST PER SHIPSET | TRAINING CHARGES (AS PER SOTR) | 5 | ship sets | [email protected] | 1200 |
| 8 | 8. EXTENDED WARRANTY BIDDER TO QUOTE LS COST FOR ONE YEAR PER SHIPSET | Extended warranty for a period of one year, Extendable upto two years post expiry of contractual warranty period . | 5 | ship sets | [email protected] | 1200 |
| 9 | 9. De preservation and re preservation charges as per TTS | Cost of Preservation / Depreservation inclusive of tools, consumables, & services | 5 | ship sets | [email protected] | 1200 |
| 10 | 1. LO transfer pump | Pump along with its accessories and special cables , Including Packing , Initial preservation for 24 months, Transportation & Insurance (AS PER SOTR). | 10 | Nos | [email protected] | 1200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7360890.pdf
GEM_BID
tender_documents_2025-01-10-14-41-17_a5fcc749197a7549d3bc582550ba87d9.pdf
BOQ
boq_-_gem_2025-01-10-14-41-17_494baf01c4908d526fb8e3c20e2807af.csv
BOQ
1736501319.pdf
OTHER
1736501334.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .