Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
27 Jul 2026, 6:00 pm2d left
Executive Engineer REW Samba
Office of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_315885_21
19 REW Samba of 2026-27, Dated 13.07.2026
Open Tender
Civil Works
Percentage
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹3,920
14 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 10.2 | cum | 187 | ₹1,907.4 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.55 | cum | 4,826.5 | ₹7,481.08 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 10.21 | cum | 5,733.6 | ₹58,540.06 |
| 4 | Supply and dumping of stones. | 4.38 | sqm | 700 | ₹3,066 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for:-
a) Foundation, footings, bases of columns. | 25 | sqm | 286.35 | ₹7,158.75 |
| 6 | walls( any thickness) | 57.9 | sqm | 628.95 | ₹36,416.21 |
| 7 | Suspended floors. | 4.15 | sqm | 718.2 | ₹2,980.53 |
| 8 | Lintel and beams. | 2.2 | sqm | 577.58 | ₹1,270.68 |
| 9 | edges of slab. | 4.8 | sqm | 262.2 | ₹1,258.56 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 7.2 | sqm | 218.4 | ₹1,572.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1028067.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].