Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 CrAdmitted-Finance A 760 SUSHANT LOK PHASE 1 GURGAON 122002 HARYANA INDIA | L1 | Admitted-Finance | |
| 2 | L2₹13.2 Cr+₹33.4 L (2.59%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical MARTHOMA CHURCH COMPLEX GOAL GHAR PORT BLAIR PIN 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical 40 G SIDDHARTH ENCLAVE MAU ROAD AGRA 282005 | AGRA | AGRA | UTTAR PRADESH | 282005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | UNIVERSAL CONTRACTORS AND ENGINEERS PRIVATE LIMITED L2 | COMT CONSTRUCTIONS PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Development of Heritage Circuit (Patriot Walk) at Port Blair under Smart City mission on EPC Mode. ( This includes all plant, labour, supervision, materials, transport, all temporary works, erection, taxes,Cess,Levies and duties, contractor’s profit and establishment/overheads, together with preparation of design and drawings, proof checking from third party, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contract) | 1 | lumpsum | 13,24,65,943 ₹13,24,65,943 | 12,91,27,801 ₹12,91,27,801 Lowest |
Tender Value
Refer Docs
EMD Value
₹23.2 L
Closing Date
6 Feb 2021, 10:00 amClosed
CHIEF EXECUTIVE OFFICER
Port Blair Smart City Limited, Indira Bhavan, Mohanpura, Port Blair-744101
Development of Heritage circuit (Patriot walk) at Port Blair under Smart city mission on EPC Mode
2020_PMBC_1485_1
03/CEO/PBSPL/2020-21
Open Tender
Civil Works - Others
EPC Contract
270 days
ABEERDEEN MEMORIAL and others as per RFP
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Yes
CEO, PBSPL
₹23.2 L
Yes
3 May 2021
13 Nov 2020
6 Feb 2021
13 Nov 2020
6 Feb 2021
13 Nov 2020
Amount
Development of Heritage Circuit (Patriot Walk) at Port Blair under Smart City mission on EPC Mode. ( This includes all plant, labour, supervision, materials, transport, all temporary works, erection, taxes,Cess,Levies and duties, contractor’s profit and establishment/overheads, together with preparation of design and drawings, proof checking from third party, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contract)
UNIVERSAL CONTRACTORS AND ENGINEERS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .