Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
2 Jan 2021, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer Electric Division Vijaypur
Fixing of Rate Contract for handling of various material in divisional stores under the jurisdiction of Electric Division Vijaypur JPDCL Jammu
2020_PDD_111949_1
EDV/ 21 of 2020-21 Dated 19-12-2020
Open Tender
Electrical Works
Item Rate
1 days
Divisional Store Vijaypur
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Executive Engineer Electric Div Vijaypur JPDCL
₹25,000
Office of the Executive Engineer at Vijaypur
12 Jan 2021
22 Dec 2020
4 Jan 2021
22 Dec 2020
2 Jan 2021
22 Dec 2020
22 Dec 2020 - 2 Jan 2021
26 Dec 2020
Unloading of PCC Poles 11 Mtr Long
Unloading of PCC Poles 9 Mtr Long
Unloading of PCC Poles 8 Mtr Long
Unloading of ST Poles 13 Mtr Long
Unloading of ST Poles 11Mtr Long
Unloading of ST Poles 9 Mtr Long
Unloading of ST Poles 8 Mtr Long
Loading of PCC Poles 11 Mtr Long
Loading of PCC Poles 9 Mtr Long
Loading of PCC Poles 8 Mtr Long
Loading of ST Poles 13 Mtr Long
Loading of ST Poles 11Mtr Long
Loading of ST Poles 9 Mtr Long
Loading of ST Poles 8 Mtr Long
Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking
Unloading of /New ACSR Conductor
Loading of Old/New ACSR Conductor
Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking
Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking
Unloading of 25 KVA Transformer(New/Write BackTransformer)
Unloading of 63 KVA Transformer(New/Write BackTransformer)
Unloading of 100 KVA Transformer(New/Write BackTransformer)
Unloading of 250 KVA Transformer(New/Write BackTransformer)
Unloading of 400 KVA Transformer(New/Write BackTransformer)
Unloading of 630 KVA Transformer(New/Write BackTransformer)
Loading of 25 KVA Transformer
Loading of 63 KVA Transformer
Loading of 100 KVA Transformer
Loading of 250 KVA Transformer
Loading of 400 KVA Transformer
Loading of 630 KVA Transformer
Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking
Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking
Unloading of Channel/Angle/Flat Iron
Loading of Channel/Angle/Flat Iron
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
Unloading of Link/Knife/HG/DO/LA Set
Loading of Link/Knife/HG/DO/LA/GO Set
Unloading of CT/PT Unit
Loading of CT/PT Unit
Unloading of DPC CU/AL Wire
Unloading of Bush Rods and other allied workshop material
Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)
Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc)
Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material
Unloading/Loading of Bammboo Ladder
Unloading/Loading of Single/Three Phase Meters
Unloading of PVC Cable single core 95/120/185mmsq
Unloading of PVC Cable single core 300/400/630mmsq
Loading of PVC Cable single core 95/120/185mmsq
Loading of PVC Cable single core 300/400/630mmsq
Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
Loading of Aluminium and Copper wire
loading of Bush Rods and other allied Workshop material
Unloading/Loading of Single phase/three phase meters
Stacking of Single/Three phase meters
Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
Fabrication of fi ties ,fi clamps from MS flat (suitable for 9mtr,11 mtr and 13 mtr poles)
Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards
Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards
Fabrication of ST poles by way of drilling of extra holes
Fabrication of foundation bolts from MS tor steel including threading as per REC Standards
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc
Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc
Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc
Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.
Unloading of Cement Bags
Carrigae of Cement Bags from unloading site to stacking site (Upto 50 Mtr)
Stacking of Cement bags
Loading of Cement Bags
Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents
Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store
Straightening of tilted fencing posts in the store premises for repair of fecning
Insertion of new fencing Posts in the store for repair of fencing
Dismantling of existing mesh fencing
Fixing of mesh Fencing
Fixiing of CGI Sheets
Dismantling of CGI sheets
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA
Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
Painting(Red oxide/Aluminium Paint) of Fabricated Material.
Unloading of old loose conductor and making bundles
Checking & maggering of 11Kv LA set HG set GO set CT/PT unit
M/S JK INFRA
DEEP AND SONS
JASMEET SINGH
M/S R. V ENTERPRISES
Raina Builders and Suppliers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .