Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 L+₹32,143.13 (9.86%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.6 L+₹37,158.42 (11.4%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹4.1 L+₹81,139.96 (24.9%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹4.1 L
EMD Value
₹10,275
Closing Date
10 Oct 2023, 11:00 amClosed
Pradeesh V
Office of Assistant Executive Engineer Minor Irrigation Sub-division, Palakkad
Annual Maintainance 2023-24- Annual Maintainance works to Thenkara branch canal of Anamooli canal diversion scheme in Thenkara GP-General Civil Work-1
2023_Irrig_607755_1
IRR/IA/TR/2705/2023_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Thenkara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹910
Yes
₹10,275
Yes
13 Nov 2023
30 Sept 2023
12 Oct 2023
30 Sept 2023
10 Oct 2023
30 Sept 2023
Amount
Detailed Estimate
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD23189/2023-2024:Temporary side protection using gunny/polythene bags filled with earth as per the direction of departmental officers at site.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
shihabudheen pp
SHIJU GEORGE
E.K.Abdulsalam
Bidder Name
E.K.Abdulsalam
SAJI THOMAS
SHIJU GEORGE
shihabudheen pp
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .