| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.3 Cr+₹1.3 L (0.94%)Rejected-AOC NO 89 B KONGU NAGAR KARUMANDI SELLIPALAYAM VILLAGE PERUNDURAI TALUK ERODE DISTRICT 638 052 | ERODE | TAMIL NADU | 638052 | ₹1.3 Cr+₹1.3 L (0.94%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.4 Cr+₹2.5 L (1.89%)Rejected-AOC | ₹1.4 Cr+₹2.5 L (1.89%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAL ENGINEERING L1 | SAMRAT CONSTRUCTIONS L3 | M.R.Thangaraj L2 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing the hoisting arrangement of lift gate in the vents of Pulivalam Sand vent including carefully dismantling the hoisting equipment consist of rope drums, pinion gear wheel spur gear wheel , main drive shaft, motor, plummer blocks and manual operating arrangements and support structural members from the vent without cause any damage to the parts for reuse by using hydraulic cranes and other hoisting equipments and conveying the detached parts to the site section stores and stacking them carefully at the places shown by the departmental officers. The existing position of the lifting rope drum is not in correct position. To rectify the fault, Check the alignment of rope with the gate to the perfect verticality and position and mark the bed position of the rope drum base as per new correct alignment. For the new position of hoist, provide new drive gear and pinion gear wheel of required diameter on both sides made up of cast steel of required thick including cost of pattern making charges, moulding charges and teeth cutting charges and with required gear wheel shaft machined for smooth movement of gear wheels. Drilling new holes in the support structures of mild steel channel for fixing rope drums and fix the new drive gear wheel and pinion wheel in position. Before erection clean all the gear wheels with derusting chemical and with required wire brushes and cotton waste . After cleaning fixing the drums and gear wheels in position with hydraulic cranes and other hoisting equipments by means of required bolts and nuts. With this new position of rope drum and drive wheel, fix the new position and alignment of other spur gear wheels and main drive shaft. After drilling holes in the structural members fix the gear wheels and main drive shaft with new plummer blocks with required bed bolts by using necessary hoisting equipments like turkey posts, chain pulley block etc. After erection of gear wheels fixing the electrical motor and manual operating arrangement in correct alignment and position . The lifting rope of 25mm dia should be replaced on both ends with new 25mm dia steel core rope of required length to be fixed properly with rope drum and other side with shutter lifting eye bolt. The damaged portion of the operating platform should be replaced with new 6mm chequered plate with support structures wherever required . After completion of repair and rectification work the operating platform and hoisting equipments should be painted with two coat of paint of approved colour over one coat of red oxide primer and all the plummer blocks and gears should be apply with high quality grease and the rope applied with cardium compound as per IS standards. The rate includes cost of all materials, process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like , hydraulic cranes , chain pulley, power charges for generator, conveyance of equipments and manual labors to site and clearing them after completion of work including cost of warranty for 5 years, trial operation etc., complete and as directed by the departmental officers | 3 | Nos. | 14,13,804 ₹42,41,412 Lowest | 14,40,479 ₹43,21,437 | 14,27,141 ₹42,81,423 |
| 2.00 | Repairing the shuttering arrangements in Pulivalam sand vent of size 5690x 4050 mm including providing copper dam in front of the vent for required height for doing shutter repair works. After dewatering the water from the vent area cleaning the apron portion for doing repair , The shutter repair work done by dismantling carefully the skin plate for 1m width roller box arrangements at both ends by using gas cutting equipments without cause any damage to the civil structure and convey the cutting portions to the section store by lorries and stacking them at the places shown by the departmental officers. After removal of cutting parts clean the groove portion with required equipments repair work. Then extend the roller track support beam of ISMB 200 for an additional height of 2.50m and provide roller track made up of 100x12mm MS flat for the extended portion of beam. Fabricating new roller box arrangements with skin plate for 1m width by using 12mm thick ms plate as skin plate and roller box end vertical plates two numbers of size 3.05m x 0.30m of 12mm thick ms plate for both ends. Roller box strengthened with 12mm thick diaphragm plates. The new roller two numbers of on both sides made up of 300mm dia and 100 m thick mild steel plate provided with Gunmetal push at centre for fixing roller pins. The roller pins of 50 mm dia made up of non ferrous alloy 3 metal for required length fixed to the roller box with required collar plate. Fix new Seal seat for side seals made up of 55x10mm mild steel angle with skin plate by welding equipment in correct alignment . The seal cover flat made up of 50x10mm provided with holes at 100mm C/C by drilling equipments. And also drill holes in the seal seat align with the seal cover flat by using drilling machine and threaded with required equipments. After completion of all works fix the roller box portion of the skin plate to the cutting portion of the gate on both ends in perfect plumb position by using cranes and required equipments and welding the vertical joints with High quality electrodes without any cracks and defects. The welding is done with required scaffolding arrangements for required height. After completion of welding work, Fix the Z type of seal of size. 74x79x16mm in correct alignment including punching hole in the Z seal align to cover flat by using rubber punch and fixed to the gate with required stainless steel bolt, nuts and washers. Convey the cutting parts to the section by lorries and stacking carefully the materials as directed by the departmental officers. The cost includes cost of all materials, deducting the cost of old scrab materials ,process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like crane, chain pulley block, power charges for generator, scaffolding charges, risk allowance for working at a height of more than 3m, conveyance to site and clearing them after completion of work including cost of trial operation, warranty for 5 years,etc., complete and as directed by the departmental officers. | 3 | Nos. | 17,08,537 ₹51,25,611 Lowest | 17,40,774 ₹52,22,322 | 17,24,655 ₹51,73,965 |
| 3.00 | Providing new stair with handrails to hoisting arrangements of 5m length including dismantling the existing ladder provided in the regulator by using gas cutting equipments and convey the cutting portions to the section store by lorries and stacking them at the places shown by the departmental officers. Providing new stair with hand rails for a length of 5m made up of steps of size 0.60m x 0.25m with 6mm thick chequered plate , frames with 35x35x6m and hand rails with 50x50x6mm mild steel angle posts 0.75m height at an interval of 1.5m and horizontal barricade made up of 25mm dia GI pipe two rows on both sides including fabrication and erection site. The cost includes cost of all materials, deducting the cost of old scrab materials ,process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like crane, chain pulley block, power charges for generator, conveyance to site and clearing them after completion of work including cost of trial operation, warranty for 5 years,etc., complete and as directed by the departmental officers. | 1 | No. | 1,75,193 ₹1,75,193 Lowest | 1,78,499 ₹1,78,499 | 1,76,846 ₹1,76,846 |
| 4.00 | Grit blasting and Painting with two coats of coaltar epoxy paint over two coat good quality zinc rich primer. This includes cleaning the surface to be painted to remove grease, oil and other impurities, grit blasting the surface as per IS standards and specifications and coating the surface with Zinc rich primer (85% ±5% zinc content)as per IS 14177:1994 and then application of two coats of coaltar epoxy paint | 225.63 | sqm | 2,438 ₹5,50,085.94 Lowest | 2,484 ₹5,60,464.92 | 2,461 ₹5,55,275.43 |
| 5.00 | Renewal of upstream side Groove Angle of Lift Gate in the vent of Pulivalam Sand vent regulator, including dismantling the existing damaged groove angle with gas cutting equipment and with manual labors without cause any damage to the civil structure and conveying the cutting parts of the groove angle by using goods vechicle to the section stores and stacking at the places shown by the departmental officers. Rectify the groove portion to the verticality by cutting the extra edges and providing holes at three places for fixing anchorage angle by using concrete breakers and manual labours. Fabricating a new groove angle made up of 130x130x12mm mild steel angle for a height of 6.50m, provided with anchorage angles three numbers at required intervals, made up of 50x50x6mm mild steel angle of length 0.60m by using welding equipments and electrodes. Providing stainless steel flat on one face of the groove angle for a height of 4.20m made up of 75x6mm SS304 Grade including cutting the flats to the required length and one end smothered for 150mm length in shaping machine and the flat welded to the bottom side of the groove angle by using welding equipments and SS electrodes. Fabricated groove angles conveyed to the site by using goods vechicle and fixed to the upstream side Grooves with required hoisting equipments and manual labours in perfect alignment and position. The anchorage angles fixed with cement concrete as directed by the departmental officers. The rate includes cost of all materials, deducting the cost of old scrab materials process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like , hydraulic cranes , chain pulley, power charges for generator, conveyance of equipments and manual labors to site and clearing them after completion of work including cost of warranty for 5 years, trial operation etc., complete and as directed by the departmental officers | 3 | Nos. | 2,17,603 ₹6,52,809 Lowest | 2,21,708 ₹6,65,124 | 2,19,656 ₹6,58,968 |
| 6.00 | Providing roofing arrangements for operating Platform of pulivalam sand vent regulator of size 6.40m x2.20m, made up of vertical posts with 75x75x8mm mild steel angle posts on both sides at an interval of 1.10m of 3.00 height and principal rafters made up of 5x65x6mm mild steel angle at an interval of 1.10m and purlin four numbers made up of 2" x 2" square pipes fixed at required intervals over the rafters using required bolts and nuts with 50x50x6mm mild steel angle cleat pieces, which are welded with the mild steel angle rafters. The fabricated truss is cleaned with wire brushes and a grinding machine for free from dirt and welding slags. After cleaning, the truss is to be painted with two coats of AC black paint over one coat of zinc primer as per IS standard. The top of the shed covered with a 0.47mm thick galvalume roofing sheet with recommended colour fixed to the purlins with self driven aluminium screws drilled at required intervals by using drilling equipment operated with power generators. The erection is done with the required hoisting equipment like turkey post, chain pulley blocks, and required manual labours, etc. complete. The rate including cost of materials, roofing sheets,consumables, labour charges and charges of welding machine, cutting equipments, grinding, drilling and hoisting equipments charges, civil works and conveyance charges of materials to site and conveyance charges of equipments labours to site and clearing them after completion of work, etc complete and as directed by the departmental officers. | 3 | Nos. | 1,63,843 ₹4,91,529 Lowest | 1,66,935 ₹5,00,805 | 1,65,389 ₹4,96,167 |
| 290.00 | GST at 18% | 1 | Nos | 20,22,595.19 ₹20,22,595.19 Lowest | 20,60,757.35 ₹20,60,757.35 | 20,41,676 ₹20,41,676 |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
16 Sept 2025, 11:00 amClosed
Superintending Engineer
Office of the Superintending Engineer, WRD, Middle Cauvery Basin Circle, Subramaniyapuram, Trichy-20
Repair and Renewal of Shutter and hoisting arrangements of Pulivalam Sand vent in Uyyakondan Channel of Srirangam Taluk in Trichy District
2025_WRD_599272_1
2/2025-26/DO1/MCBC/25.08.25(7)
Open Tender
Civil Works
Lump-sum
Srirangam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹73,000
27 Nov 2025
1 Sept 2025
17 Sept 2025
1 Sept 2025
16 Sept 2025
1 Sept 2025
Amount
Repairing the hoisting arrangement of lift gate in the vents of Pulivalam Sand vent including carefully dismantling the hoisting equipment consist of rope drums, pinion gear wheel spur gear wheel , main drive shaft, motor, plummer blocks and manual operating arrangements and support structural members from the vent without cause any damage to the parts for reuse by using hydraulic cranes and other hoisting equipments and conveying the detached parts to the site section stores and stacking them carefully at the places shown by the departmental officers. The existing position of the lifting rope drum is not in correct position. To rectify the fault, Check the alignment of rope with the gate to the perfect verticality and position and mark the bed position of the rope drum base as per new correct alignment. For the new position of hoist, provide new drive gear and pinion gear wheel of required diameter on both sides made up of cast steel of required thick including cost of pattern making charges, moulding charges and teeth cutting charges and with required gear wheel shaft machined for smooth movement of gear wheels. Drilling new holes in the support structures of mild steel channel for fixing rope drums and fix the new drive gear wheel and pinion wheel in position. Before erection clean all the gear wheels with derusting chemical and with required wire brushes and cotton waste . After cleaning fixing the drums and gear wheels in position with hydraulic cranes and other hoisting equipments by means of required bolts and nuts. With this new position of rope drum and drive wheel, fix the new position and alignment of other spur gear wheels and main drive shaft. After drilling holes in the structural members fix the gear wheels and main drive shaft with new plummer blocks with required bed bolts by using necessary hoisting equipments like turkey posts, chain pulley block etc. After erection of gear wheels fixing the electrical motor and manual operating arrangement in correct alignment and position . The lifting rope of 25mm dia should be replaced on both ends with new 25mm dia steel core rope of required length to be fixed properly with rope drum and other side with shutter lifting eye bolt. The damaged portion of the operating platform should be replaced with new 6mm chequered plate with support structures wherever required . After completion of repair and rectification work the operating platform and hoisting equipments should be painted with two coat of paint of approved colour over one coat of red oxide primer and all the plummer blocks and gears should be apply with high quality grease and the rope applied with cardium compound as per IS standards. The rate includes cost of all materials, process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like , hydraulic cranes , chain pulley, power charges for generator, conveyance of equipments and manual labors to site and clearing them after completion of work including cost of warranty for 5 years, trial operation etc., complete and as directed by the departmental officers
Repairing the shuttering arrangements in Pulivalam sand vent of size 5690x 4050 mm including providing copper dam in front of the vent for required height for doing shutter repair works. After dewatering the water from the vent area cleaning the apron portion for doing repair , The shutter repair work done by dismantling carefully the skin plate for 1m width roller box arrangements at both ends by using gas cutting equipments without cause any damage to the civil structure and convey the cutting portions to the section store by lorries and stacking them at the places shown by the departmental officers. After removal of cutting parts clean the groove portion with required equipments repair work. Then extend the roller track support beam of ISMB 200 for an additional height of 2.50m and provide roller track made up of 100x12mm MS flat for the extended portion of beam. Fabricating new roller box arrangements with skin plate for 1m width by using 12mm thick ms plate as skin plate and roller box end vertical plates two numbers of size 3.05m x 0.30m of 12mm thick ms plate for both ends. Roller box strengthened with 12mm thick diaphragm plates. The new roller two numbers of on both sides made up of 300mm dia and 100 m thick mild steel plate provided with Gunmetal push at centre for fixing roller pins. The roller pins of 50 mm dia made up of non ferrous alloy 3 metal for required length fixed to the roller box with required collar plate. Fix new Seal seat for side seals made up of 55x10mm mild steel angle with skin plate by welding equipment in correct alignment . The seal cover flat made up of 50x10mm provided with holes at 100mm C/C by drilling equipments. And also drill holes in the seal seat align with the seal cover flat by using drilling machine and threaded with required equipments. After completion of all works fix the roller box portion of the skin plate to the cutting portion of the gate on both ends in perfect plumb position by using cranes and required equipments and welding the vertical joints with High quality electrodes without any cracks and defects. The welding is done with required scaffolding arrangements for required height. After completion of welding work, Fix the Z type of seal of size. 74x79x16mm in correct alignment including punching hole in the Z seal align to cover flat by using rubber punch and fixed to the gate with required stainless steel bolt, nuts and washers. Convey the cutting parts to the section by lorries and stacking carefully the materials as directed by the departmental officers. The cost includes cost of all materials, deducting the cost of old scrab materials ,process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like crane, chain pulley block, power charges for generator, scaffolding charges, risk allowance for working at a height of more than 3m, conveyance to site and clearing them after completion of work including cost of trial operation, warranty for 5 years,etc., complete and as directed by the departmental officers.
Providing new stair with handrails to hoisting arrangements of 5m length including dismantling the existing ladder provided in the regulator by using gas cutting equipments and convey the cutting portions to the section store by lorries and stacking them at the places shown by the departmental officers. Providing new stair with hand rails for a length of 5m made up of steps of size 0.60m x 0.25m with 6mm thick chequered plate , frames with 35x35x6m and hand rails with 50x50x6mm mild steel angle posts 0.75m height at an interval of 1.5m and horizontal barricade made up of 25mm dia GI pipe two rows on both sides including fabrication and erection site. The cost includes cost of all materials, deducting the cost of old scrab materials ,process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like crane, chain pulley block, power charges for generator, conveyance to site and clearing them after completion of work including cost of trial operation, warranty for 5 years,etc., complete and as directed by the departmental officers.
Grit blasting and Painting with two coats of coaltar epoxy paint over two coat good quality zinc rich primer. This includes cleaning the surface to be painted to remove grease, oil and other impurities, grit blasting the surface as per IS standards and specifications and coating the surface with Zinc rich primer (85% ±5% zinc content)as per IS 14177:1994 and then application of two coats of coaltar epoxy paint
Renewal of upstream side Groove Angle of Lift Gate in the vent of Pulivalam Sand vent regulator, including dismantling the existing damaged groove angle with gas cutting equipment and with manual labors without cause any damage to the civil structure and conveying the cutting parts of the groove angle by using goods vechicle to the section stores and stacking at the places shown by the departmental officers. Rectify the groove portion to the verticality by cutting the extra edges and providing holes at three places for fixing anchorage angle by using concrete breakers and manual labours. Fabricating a new groove angle made up of 130x130x12mm mild steel angle for a height of 6.50m, provided with anchorage angles three numbers at required intervals, made up of 50x50x6mm mild steel angle of length 0.60m by using welding equipments and electrodes. Providing stainless steel flat on one face of the groove angle for a height of 4.20m made up of 75x6mm SS304 Grade including cutting the flats to the required length and one end smothered for 150mm length in shaping machine and the flat welded to the bottom side of the groove angle by using welding equipments and SS electrodes. Fabricated groove angles conveyed to the site by using goods vechicle and fixed to the upstream side Grooves with required hoisting equipments and manual labours in perfect alignment and position. The anchorage angles fixed with cement concrete as directed by the departmental officers. The rate includes cost of all materials, deducting the cost of old scrab materials process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like , hydraulic cranes , chain pulley, power charges for generator, conveyance of equipments and manual labors to site and clearing them after completion of work including cost of warranty for 5 years, trial operation etc., complete and as directed by the departmental officers
Providing roofing arrangements for operating Platform of pulivalam sand vent regulator of size 6.40m x2.20m, made up of vertical posts with 75x75x8mm mild steel angle posts on both sides at an interval of 1.10m of 3.00 height and principal rafters made up of 5x65x6mm mild steel angle at an interval of 1.10m and purlin four numbers made up of 2" x 2" square pipes fixed at required intervals over the rafters using required bolts and nuts with 50x50x6mm mild steel angle cleat pieces, which are welded with the mild steel angle rafters. The fabricated truss is cleaned with wire brushes and a grinding machine for free from dirt and welding slags. After cleaning, the truss is to be painted with two coats of AC black paint over one coat of zinc primer as per IS standard. The top of the shed covered with a 0.47mm thick galvalume roofing sheet with recommended colour fixed to the purlins with self driven aluminium screws drilled at required intervals by using drilling equipment operated with power generators. The erection is done with the required hoisting equipment like turkey post, chain pulley blocks, and required manual labours, etc. complete. The rate including cost of materials, roofing sheets,consumables, labour charges and charges of welding machine, cutting equipments, grinding, drilling and hoisting equipments charges, civil works and conveyance charges of materials to site and conveyance charges of equipments labours to site and clearing them after completion of work, etc complete and as directed by the departmental officers.
GST at 18%
M.R.Thangaraj (BID ID -1459319)
SAMRAT CONSTRUCTIONS (BID ID -1458752)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_716358.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .