| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 CrAccepted-Finance | ₹2.9 Cr | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹3.1 CrRejected-Finance | ₹3.1 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹3.1 CrRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹3.1 Cr | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹3.1 CrRejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 UDYAM JK 22 0002496 01AFRPJ1985K1Z4 R M | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹3.1 Cr | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹3.1 CrRejected-Finance | ₹3.1 Cr | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | M/S K.K. TRADERS L2 | R.B.S. CONSTRUCTION L7 | M/S Singh Construction L3 | M/S OBELION CONSTRUCTIONS L1 | SHIVAM ENTERPRISES L4 | M/S CONSTRUCTION NETWORK INDIA L6 | M/S PRABHAT TRADERS L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work cutting in all type of soil for making Base of Launching apron. Including all cost of labour, material, T&P required for proper completion of work. | 13,235.63 | M³ | 89.99 ₹11.9 L | 100 ₹13.2 L | 39 ₹5.2 L | 83 ₹11.0 L | 90 ₹11.9 L | 80 ₹10.6 L | 50 ₹6.6 L |
| 2.00 | Supplying and laying of 40-60 Kg. Mirzapur stone boulder for Pitching on slope of bund. Including all lead and lift, cost of all material, labour, T&P etc. required for proper completion of work. | 1,526.4 | M³ | 4,349.99 ₹66.4 L | 5,200 ₹79.4 L | 4,450 ₹67.9 L | 4,700 ₹71.7 L | 4,800 ₹73.3 L | 4,300 ₹65.6 L | 4,500 ₹68.7 L |
| 3.00 | Supplying and laying of 40-60 Kg. Mirzapur stone boulder in wire crates for launching apron of bund. Including all lead and lift, cost of all material, labour, T&P etc. required for proper completion of work. | 4,800 | M³ | 4,249.99 ₹2.0 Cr | 4,800 ₹2.3 Cr | 4,450 ₹2.1 Cr | 3,786 ₹1.8 Cr | 4,280 ₹2.1 Cr | 4,450 ₹2.1 Cr | 4,500 ₹2.2 Cr |
| 4.00 | Supplying Non woven gio textile made of 100% polypropylene staple fibre ( Continous filament not allowed) bonded into staple network through needle punching meeting the technical specification and qualifications criteria in the tender geotextile should be tech-Geo PR15 O or equivalent and have minimum 70% resistance against UV exposure and should be enert to biological degradation and resistant to naturally occuring acidds and alkalies including contractors profit 200 GSM. | 4,276.8 | M² | 63.99 ₹2.7 L | 120 ₹5.1 L | 68 ₹2.9 L | 68 ₹2.9 L | 53 ₹2.3 L | 48 ₹2.1 L | 120 ₹5.1 L |
| 5.00 | Supplying and laying in proper position of 8 S.W.G.I. Wire Crates Size 3.00 X1.50X1.00 mtr including cost of all material, labour, Carriage upto work site, T&P etc. required for proper completion of work. | 1,067 | No. | 2,249.99 ₹24.0 L | 3,200 ₹34.1 L | 1,980 ₹21.1 L | 1,700 ₹18.1 L | 1,750 ₹18.7 L | 2,100 ₹22.4 L | 1,500 ₹16.0 L |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
11 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 1
2026_UPIDC_1145685_1
01/SE-XII/2026-27.
Open Tender
Civil Works
180 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,079
₹8.0 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Jun 2026
6 May 2026
11 May 2026
6 May 2026
11 May 2026
6 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work cutting in all type of soil for making Base of Launching apron. Including all cost of labour, material, T&P required for proper completion of work. | 13,235.63 | M³ | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Supplying and laying of 40-60 Kg. Mirzapur stone boulder for Pitching on slope of bund. Including all lead and lift, cost of all material, labour, T&P etc. required for proper completion of work. | 1,526.4 | M³ | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying and laying of 40-60 Kg. Mirzapur stone boulder in wire crates for launching apron of bund. Including all lead and lift, cost of all material, labour, T&P etc. required for proper completion of work. | 4,800 | M³ | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Supplying Non woven gio textile made of 100% polypropylene staple fibre ( Continous filament not allowed) bonded into staple network through needle punching meeting the technical specification and qualifications criteria in the tender geotextile should be tech-Geo PR15 O or equivalent and have minimum 70% resistance against UV exposure and should be enert to biological degradation and resistant to naturally occuring acidds and alkalies including contractors profit 200 GSM. | 4,276.8 | M² | - | - | BI01010001010000000000000515BI0100001114 |
| 5 | Supplying and laying in proper position of 8 S.W.G.I. Wire Crates Size 3.00 X1.50X1.00 mtr including cost of all material, labour, Carriage upto work site, T&P etc. required for proper completion of work. | 1,067 | No. | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TD1.pdf
Tender Documents • 1.83 MB
BOQ_2141877.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid