Loading…
Loading…
Tender Value
₹78.8 L
EMD Value
₹1.6 L
Closing Date
22 Sept 2026, 5:00 pm
Municipal Commissioner
Nagar Nigam Dehradun
Retender For Construction work of community building in Salawala under Honble Chief Minister announcement
2026_NND_99669_1
514/PWD/NND/2026-27
Open Tender
Civil Works
Item Wise
7 days
Nagar Nigam Dehradun
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Senior Finance Officer
₹1.6 L
Nagar Nigam Dehradun
2 Sept 2026
2 Sept 2026
23 Sept 2026
2 Sept 2026
22 Sept 2026
2 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 142.79 | cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size | 28.59 | cum | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement -All work up to plinth level : :1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.38 | cum | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, butments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and
reinforcement | 14.8 | cum | - | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1 :1.5:3 (1 cement: 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 44.79 | cum | - | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all omplete.Reinforcement for R.C.C. Work Using Mild Steel and Medium /Tensile Steel Bars | 111.35 | qtl | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for | 190.4 | sqm | - | - |
| 8 | Columns, Pillars, Piers, Abutments, Posts and Struts | 320.88 | sqm | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 4.23 | cum | - | - |
| 10 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 as per | 73.83 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TD.pdf
Tender Documents • 2.45 MB
BOQ_117528.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .