| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | L1 | Accepted-Finance L1 in Financial Bid | |
| 2 | L2₹11.6 L+₹4,767.08 (0.41%)Rejected-Finance | L2 | Rejected-Finance L2 in Financial Bid | |
| 3 | L3₹11.6 L+₹5,878.90 (0.51%)Rejected-Finance | L3 | Rejected-Finance L3 in Financial Bid |
| Sl No | Description | Qty | Unit | SS BUILDERS AND CONSULTANT L2 | BASERA DEVELOPERS L1 | M/S RAJAN BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Foundation in dry soil (Loam clay or sand)including lift upto 1.50 m and lead up to 30 M and including back filling ,watering and ramming of excavated earth into the Plinth with removal and disposal of surplus earth as directed by the Engineer -in- Charge up to distance of 30M from the Foundation trenches. | 223.05 | Cum. | 63 ₹14,052.15 Lowest | 63 ₹14,052.15 Lowest | 64 ₹14,275.2 |
| 2.00 | Providing and laying C.C 1:3:6 in foundation including all cost of material,labour and T&P etc. complete. | 55.41 | Cum. | 5,939 ₹3,29,079.99 | 5,935 ₹3,28,858.35 Lowest | 5,940 ₹3,29,135.4 |
| 3.00 | shuttering for P.C.C including all cost of labour and T&P etc for complete. | 54.58 | Sqm. | 243 ₹13,262.94 | 242 ₹13,208.36 Lowest | 244 ₹13,317.52 |
| 4.00 | First class B/W in 1:4, cement coarse sand mortar I/c cost of material labour and T&P etc complete. | 76.44 | Cum. | 5,468 ₹4,17,990.32 | 5,460 ₹4,17,378.78 Lowest | 5,469 ₹4,18,066.77 |
| 5.00 | Struck deep pointing in 1:2 cement mortar including cost of all materail, labour, T&P etc complete. | 123.85 | Sqm. | 104 ₹12,880.4 | 102 ₹12,632.7 Lowest | 105 ₹13,004.25 |
| 6.00 | shuttering for R.C.C including all cost of labour and T&P etc for complete. | 21.54 | Sqm. | 683 ₹14,711.82 | 680 ₹14,647.2 Lowest | 684 ₹14,733.36 |
| 7.00 | Supplying and placing steel reinforcement for R.C.C work including all cost of material, labour a nd T&P etc.Complete. | 0.79 | M.T | 97,210 ₹76,795.9 | 97,200 ₹76,788 Lowest | 97,230 ₹76,811.7 |
| 8.00 | Providing and laying C.CM-20 (1:1.5:3) in slope including all cost of material,labour and T&P etc. complete. | 9.78 | Cum. | 7,041 ₹68,860.98 | 7,040 ₹68,851.2 Lowest | 7,044 ₹68,890.32 |
| 9.00 | Laying R.C.C in M-20 (1:1.5:3) in slab including all cost of material labour and T&P complete. | 8.39 | Cum. | 7,386 ₹61,968.54 | 7,380 ₹61,918.2 Lowest | 7,390 ₹62,002.1 |
| 10.00 | S/L Course sand in filter i/c all cost of material labour and T&P complete. | 0.94 | Cum. | 2,817 ₹2,647.98 | 2,810 ₹2,641.4 Lowest | 2,818 ₹2,648.92 |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
30 May 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 03 CONSTRUCTION OF HEAD REGULATOR FOR THIRAULI MINOR OFF TAKING FROM LEFT BANK OF KUNDARKI DY. AT KM 6.100 MGC-II
2026_UPIDC_1151892_3
01/EE2026-27
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹23,000
10 Jun 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Foundation in dry soil (Loam clay or sand)including lift upto 1.50 m and lead up to 30 M and including back filling ,watering and ramming of excavated earth into the Plinth with removal and disposal of surplus earth as directed by the Engineer -in- Charge up to distance of 30M from the Foundation trenches. | 223.05 | Cum. | - | - |
| 2 | Providing and laying C.C 1:3:6 in foundation including all cost of material,labour and T&P etc. complete. | 55.41 | Cum. | - | - |
| 3 | shuttering for P.C.C including all cost of labour and T&P etc for complete. | 54.58 | Sqm. | - | - |
| 4 | First class B/W in 1:4, cement coarse sand mortar I/c cost of material labour and T&P etc complete. | 0.2 | Cum. | - | - |
| 5 | Struck deep pointing in 1:2 cement mortar including cost of all materail, labour, T&P etc complete. | 123.85 | Sqm. | - | - |
| 6 | shuttering for R.C.C including all cost of labour and T&P etc for complete. | 21.54 | Sqm. | - | - |
| 7 | Supplying and placing steel reinforcement for R.C.C work including all cost of material, labour a nd T&P etc.Complete. | - | M.T | - | - |
| 8 | Providing and laying C.CM-20 (1:1.5:3) in slope including all cost of material,labour and T&P etc. complete. | 9.78 | Cum. | - | - |
| 9 | Laying R.C.C in M-20 (1:1.5:3) in slab including all cost of material labour and T&P complete. | 8.39 | Cum. | - | - |
| 10 | S/L Course sand in filter i/c all cost of material labour and T&P complete. | 0.94 | Cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
BOQ_2157787.xls
BOQ • 0.28 MB
lot03.pdf
Tender Documents • 2.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .