Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAdmitted-Finance | ₹11.5 L | L1 | Admitted-Finance |
| 2 | L2₹11.6 LAdmitted-Finance | ₹11.6 L | L2 | Admitted-Finance |
| 3 | L3₹11.6 LAdmitted-Finance | ₹11.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SS BUILDERS AND CONSULTANT L2 | BASERA DEVELOPERS L1 | M/S RAJAN BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Foundation in dry soil (Loam clay or sand)including lift upto 1.50 m and lead up to 30 M and including back filling ,watering and ramming of excavated earth into the Plinth with removal and disposal of surplus earth as directed by the Engineer -in- Charge up to distance of 30M from the Foundation trenches. | 223.05 | Cum. | 63 ₹14,052.15 | 63 ₹14,052.15 | 64 ₹14,275.20 |
| 2.00 | Providing and laying C.C 1:3:6 in foundation including all cost of material,labour and T&P etc. complete. | 55.41 | Cum. | 5,939 ₹3.3 L | 5,935 ₹3.3 L | 5,940 ₹3.3 L |
| 3.00 | shuttering for P.C.C including all cost of labour and T&P etc for complete. | 54.58 | Sqm. | 243 ₹13,262.94 | 242 ₹13,208.36 | 244 ₹13,317.52 |
| 4.00 | First class B/W in 1:4, cement coarse sand mortar I/c cost of material labour and T&P etc complete. | 76.44 | Cum. | 5,468 ₹4.2 L | 5,460 ₹4.2 L | 5,469 ₹4.2 L |
| 5.00 | Struck deep pointing in 1:2 cement mortar including cost of all materail, labour, T&P etc complete. | 123.85 | Sqm. | 104 ₹12,880.40 | 102 ₹12,632.70 | 105 ₹13,004.25 |
| 6.00 | shuttering for R.C.C including all cost of labour and T&P etc for complete. | 21.54 | Sqm. | 683 ₹14,711.82 | 680 ₹14,647.20 | 684 ₹14,733.36 |
| 7.00 | Supplying and placing steel reinforcement for R.C.C work including all cost of material, labour a nd T&P etc.Complete. | 0.79 | M.T | 97,210 ₹76,795.90 | 97,200 ₹76,788 | 97,230 ₹76,811.70 |
| 8.00 | Providing and laying C.CM-20 (1:1.5:3) in slope including all cost of material,labour and T&P etc. complete. | 9.78 | Cum. | 7,041 ₹68,860.98 | 7,040 ₹68,851.20 | 7,044 ₹68,890.32 |
| 9.00 | Laying R.C.C in M-20 (1:1.5:3) in slab including all cost of material labour and T&P complete. | 8.39 | Cum. | 7,386 ₹61,968.54 | 7,380 ₹61,918.20 | 7,390 ₹62,002.10 |
| 10.00 | S/L Course sand in filter i/c all cost of material labour and T&P complete. | 0.94 | Cum. | 2,817 ₹2,647.98 | 2,810 ₹2,641.40 | 2,818 ₹2,648.92 |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
30 May 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 03 CONSTRUCTION OF HEAD REGULATOR FOR THIRAULI MINOR OFF TAKING FROM LEFT BANK OF KUNDARKI DY. AT KM 6.100 MGC-II
2026_UPIDC_1151892_3
01/EE2026-27
Open Tender
Civil Works - Canal
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹23,000
3 Jun 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Foundation in dry soil (Loam clay or sand)including lift upto 1.50 m and lead up to 30 M and including back filling ,watering and ramming of excavated earth into the Plinth with removal and disposal of surplus earth as directed by the Engineer -in- Charge up to distance of 30M from the Foundation trenches. | 223.05 | Cum. | - | - |
| 2 | Providing and laying C.C 1:3:6 in foundation including all cost of material,labour and T&P etc. complete. | 55.41 | Cum. | - | - |
| 3 | shuttering for P.C.C including all cost of labour and T&P etc for complete. | 54.58 | Sqm. | - | - |
| 4 | First class B/W in 1:4, cement coarse sand mortar I/c cost of material labour and T&P etc complete. | 0.2 | Cum. | - | - |
| 5 | Struck deep pointing in 1:2 cement mortar including cost of all materail, labour, T&P etc complete. | 123.85 | Sqm. | - | - |
| 6 | shuttering for R.C.C including all cost of labour and T&P etc for complete. | 21.54 | Sqm. | - | - |
| 7 | Supplying and placing steel reinforcement for R.C.C work including all cost of material, labour a nd T&P etc.Complete. | - | M.T | - | - |
| 8 | Providing and laying C.CM-20 (1:1.5:3) in slope including all cost of material,labour and T&P etc. complete. | 9.78 | Cum. | - | - |
| 9 | Laying R.C.C in M-20 (1:1.5:3) in slab including all cost of material labour and T&P complete. | 8.39 | Cum. | - | - |
| 10 | S/L Course sand in filter i/c all cost of material labour and T&P complete. | 0.94 | Cum. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
BOQ_2157787.xls
BOQ • 0.28 MB
lot03.pdf
Tender Documents • 2.98 MB
Download all tender documents and submit your bid