Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹13.4 L
EMD Value
₹33,472
Closing Date
23 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer PWD Roads Division Kollam
GENERAL-General RM 2022-23 /Cluster 2/ One Year RC/Punalur/KLM-RM 2022-23 Zone 3 - One Year Running Contract for Various PWD Roads Under Roads Section Punalur in Kollam District - 3 road stretches for a length of 10.046 Km-Civil Work-General Civil Wo
2023_PWD_562403_6
129/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
360 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹33,472
Yes
1 Aug 2023
16 May 2023
25 May 2023
16 May 2023
23 May 2023
16 May 2023
Amount
Appendix-A Reactive Maintenance(Initial Rectification work)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD160208/2022-2023:Providing laying and rolling of close graded premix carpet of 20 mm thickness composed of 11.20 mm to 0.09 mm (MORTH-M-041) aggregates premixed using viscosity grade Bitumen using VG30 to the required line, grade and level to serve as wearing course on a previously prepared base including mixing a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonnes capacity and finishing to required level
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
Appendix-B Pre-monsoon works
OD122740/2022-2023:Engaging mazdoor for lowering side berms, clearing side berms, clearing side drains, removing silt from culverts, cutting earthen drains, diverting blocked water, ,removing the branches of trees leaned towards the road threatening pedestrians and traffic and removal of fallen trees or branches on the road clearing traffic blockage , stack the wood at suitable place and various works as directed by engineer in charge etc.
OD122741/2022-2023:Engaging Hydraulic Excavator of 1 cum bucket for various works as directed by the Officer in charge.
OD122742/2022-2023:Engaging tipper for conveying materials, debris to places as directed by departmental officers in charge.
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
OD160216/2022-2023:Engaging woodcutter for cutting down dangerously standing trees and its branches
Appendix-C Proactive/Preventive maintenance
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD122744/2022-2023:Providing laying and rolling of MSS/close graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type A) aggregates using viscosity grade bitumen (VG 30) to the required line, grade and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80- 100 KN capacity and finishing to required level and grade By manual means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD122747/2022-2023: Engaging JCB for emergency works if any
OD122748/2022-2023:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site. Additional Routine Inspection may be required in response to reports or complaints from the police , other authorities and the public as a result of major incidents, typhoon or flooding damages etc. and not measurable/payable. A promotion on the RI should be carried out either during or immediately following a period of wet weather.
Appendix-D Emergency works
OD122749/2022-2023:Engaging mazdoor for various emergency works as directed by the departmental Officer in charge.
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
Bidder Name
Thankappan.G
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_851413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .