Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹29.2 L
EMD Value
₹58,480
Closing Date
7 Nov 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RNB Division Awantipora
Executive Engineer RNB Division Awantipora
Construction/upgradation interior roads of Buchoo Buchoo Dankard link and upgradation of Link leading to GHS Jawharpora incl. Sail Nanzbal road
2025_PWDJK_293490_1
101/EEA/RNB of 2025-26/5936-46 Dated 28-10-2025
Open Tender
Civil Works
Percentage
20 days
AWANTIPORA
as per nit
4 documents required · 4 mandatory
₹1,100
Executive Engineer RNB Division Awantipora
₹58,480
28 Oct 2025
28 Oct 2025
8 Nov 2025
28 Oct 2025
7 Nov 2025
29 Oct 2025
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER R AND B DIVISION AWANTIPORA.
Name of Work: Construction/upgradation interior roads of Buchoo Buchoo Dankard link and upgradation of Link leading to GHS Jawharpora incl. Sail Nanzbal road
Contract No:- 101/EEA/R&B of 2025-26/5936-46 Dated:28-10-2025 (Advertised Cost 29.24 Lacs including cost of GST) MH: UT Road Sector Capex Budget 2023-24 AAA: 23-SE/PS of 2023-24 Dated: 10.08.2023.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Supply and filling of RBM/Quarry Material of specified and required size as directed including dressing, ramming watering and compacting with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete. 438 Cum 900 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Supplying and stacking of graded stone aggregate at site of size excluding all carriage involved complete.63-45mm size (quarry Woyen). 252.94 Cum 1245.8 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Supplying and stacking of stone screenings, chippings at site excluding all carriage involved complete. 13.2mm nominal size (Type-A) 37.44 Cum 1245.8 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Supplying and stacking of moorum (stone dust) at site excluding all carriage involved complete. 17.52 Cum 692.09 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. 219 Cum 794.72 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 Carriage of material by Mech. Transport from Source to site of work. 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
7 Stone Agg 63mm-45mm size for an average lead of 30 kms 252.94 cum 585.21 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
8 Screening for an average lead of 30 kms lead. 37.44 cum 538.34 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
9 Moorum/Stone dust for an average lead of 30 kms. 17.52 cum 538.34 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete : 300 mm dia. R.C.C. pipe 10 RM 866.52 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
11 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete : 500 mm dia. R.C.C. pipe 2.5 RM 1454.85 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
12 Construction of CC Drain 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
13 Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soils 47.81 Cum 265.73 Excess(+) 1 Full Conversion INR INR One Lakh Sixty Six Thousand Three Hundred & Twenty Nine and Paise Eighteen Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
14 Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete. 14.06 cum 900 Excess(+) 1 Full Conversion INR INR Seventy Six Thousand Four Hundred & Eighty Six and Paise Fifty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
15 Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). 7.03 cum 5382.87 Excess(+) 1 Full Conversion INR INR Two Lakh Seventy Eight Thousand Four Hundred & Fifty Five and Paise Eighty Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
16 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 27 cum 6819.24 Excess(+) 1 Full Conversion INR INR Two Lakh Seventy Eight Thousand Four Hundred & Fifty Five and Paise Eighty Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
17 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 16.26 cum 8057.8 Excess(+) 1 Full Conversion INR INR Twenty Lakh Sixty Three Thousand Six Hundred & Thirty Eight and Paise Forty One Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
18 Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. 135 Sqm 296.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
19 Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. 37.5 Sqm 743.04 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
20 Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.16 Edges of slabs and breaks in floors and walls Under 20 cm wide 75 RM 271.26 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
21 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. 2113.8 Kgs 127.46 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
22 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 60.75 Kgs 124.98 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
23 Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. 55.12 sqm 527.9 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
24 Engement of excavator (JCB) for removal of tree stemps, unhygenic material including disposal of the same within 1 Kms as directed. 12 Hour 1200 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
25 Carriage of material by Mech. Transport from Source to site of work. 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
26 Stone Agg for an average lead of 15 KM. 20.72 cum 356.41 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
27 Sand for an average lead of 10 KM. 11.62 cum 288.69 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
28 Construction of R-Wall.( Height 2.10 mtrs). 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
29 Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soils 34.15 Cum 265.73 Excess(+) 1 Full Conversion INR INR One Lakh Sixty Six Thousand Three Hundred & Twenty Nine and Paise Eighteen Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
30 Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete. 11.38 cum 900 Excess(+) 1 Full Conversion INR INR Seventy Six Thousand Four Hundred & Eighty Six and Paise Fifty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
31 Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). 7.59 cum 5382.87 Excess(+) 1 Full Conversion INR INR Two Lakh Seventy Eight Thousand Four Hundred & Fifty Five and Paise Eighty Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
32 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 105.05 cum 5931.93 Excess(+) 1 Full Conversion INR INR Twenty Lakh Sixty Three Thousand Six Hundred & Thirty Eight and Paise Forty One Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
33 Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. 289.8 Sqm 296.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
34 Supply and filling of RBM/Quarry Material of specified and required size as directed including dressing, ramming watering and compacting with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete. 112.31 Cum 900 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
35 Providing and fixing in position weep holes in abutments and other approach walls with 75mm dia PVC pipes cut to length and profile as required to be installed in concrete including all carriages and other incidental charges as per clause 2706 of MORTH specifications 140 RM 250 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
36 12mm Cement Plaster of mix: 1:4 (1 cement : 4 fine sand) 125.85 sqm 293.62 Excess(+) 1 Full Conversion INR INR Seventy Six Thousand Four Hundred & Eighty Six and Paise Fifty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
37 Carriage of material by Mech. Transport from Source to site of work. 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
38 Stone Agg for an average lead of 15 KM. 100.24 cum 356.41 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
39 Sand for an average lead of 10 KM. 54.5 cum 288.69 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_948622.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .