Loading…
Loading…
Tender Value
₹26.9 L
EMD Value
₹26,900
Closing Date
12 Oct 2026, 4:00 pm4d left
EE OFFICE KURNOOL
KNL
Construction of New Library Building at Tuggali (V&M) in Kurnool District
1000211
46/EE/EWIDC/KRNL/AE/2026-27,Dt:02.10.2026
OPEN - NCB
Civil Works
KURNOOL, ANDHRA PRADESH
9 documents required · 9 mandatory
₹952
₹26,900
6 Oct 2026
6 Oct 2026
6 Oct 2026
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) Ground Floor
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) Ground Floor
Painting to New walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer Grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for Ceiling & INTERNAL WALLS. (APSS No. 911) in All Floors Ground Floor
Painting to New walls with two coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter..of superior quality of approved brand and shade over base coat of cement primer grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for EXTERNAL WALLS. (APSS No. 911) in All Floors Ground Floor
Flooring with Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all shades and Designs set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at 3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701) Ground Floor
Providing Skirting with Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) Ground Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. Ground Floor
Dadooing to walls with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and Designs and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707 Ground Floor
Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for internal walls alround inside Ground Floor
Supply and fixing of 25mm outer dia 2.00 to 2.20 mm thick Heavy grade with IS:9537 part 3 FRLS regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required MS deep boxes and all accessories including and labour charges etc., complete. Makes:- Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC Ground Floor
Supply and Fixing of 25mm outer dia Medium grade (1.60 to 1.8 mm Thick ) with IS:9537 part 3 FRLS regid P.V.C. pipe (ISI MARK) concealed in wall with all required MS Deep Boxes and all accessories including masonary work for light, fan with separate plug point including all labour charges etc., complete. for EPABX, LAN, and CCTV, Run of mains, light, fan points. Makes:- Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC Ground Floor
Supply and erecting MS Galvanished fan hook box with hook in RCC slab including all Labour charges etc., complete. Makes : Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC Ground Floor
Supply and run of 1 of 22 /0.3mm (1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes: Finolex / RR kabel Havells/Finecab/KEI/ Polycab/Gloster/ Goldmedal/GM/FortuneArrt/Anchor/Million/APAR(Anushakthi) Ground Floor
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS : 694 / 1990 specification for Copper cable.and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/ MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement Makes: Finolex / RR kabel /Havells /Polycab /Gloster /Goldmedal/GM Ground Floor
Supply and run of 2 of 84/0.3mm (6.0 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes: Finolex / RR kabel /Havells /Polycab /Gloster/ Goldmedal/GM Ground Floor
Supply and run of 3 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes: Finolex / RR kabel /Havells/Polycab/Gloster/ Goldmedal/GM Ground Floor
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose/BH /SBH and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B. Copper cable Finolex / RR kabel / Havells/Finecab/KEI/Polycab/Gloster/Goldmedal/GM/FortuneArrt/Anchor/Million/APAR(Anushakthi)Makes:Legrand(Myrius/Lyncus)/Schneider(ClipsalX/LiviaAB)/Crabtree(Murano/Athena)/LauritzKnudsen-englaze(FormerlyL&T)/GM-(Four-Five)/Goldmedal(GIFA)/Million(M-VEE)/Anchor (Roma PLUS)/Precision(Series7)/Honeywell(Blenzepro) Ground Floor
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Accessories Makes : Legrand Myrius / Crabtree verona / L&T / HPL / Schneider Livia/ GM- Zicono/ C&S /Goldmedal (Curve / Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series / Precision / Koncept(Samrat / Qura) / Polycab (Levana) / Anchor-Roma / Amron / IndoAsian /Pointer Ground Floor
Supply and fixing of 16A/20A ISI Mark 3/2 pin Modular socket with 16A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T/ HPL/ Schneider Livia/ GM-(G NINE/ GX) C&S/ Goldmedal (Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/ Precision/Koncept (Samrat/ Qura) /Ploycab(Levana)/ Anchor-Roma/ IndoAsian/ Pointer Ground Floor
8WAY SPN DB with IP43nProtection suitable for 8Nos S.P out goings and Supply and fixing 40A DP Isolator as Incommer and 6Nos 6-32A 10KA SP MCBs as outgongs etc complete as per IS 8623; IS 13032; IEC 61439-3. Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/L&T-Newrange ., concealing in wall etc complete. Ground Floor
Supply and fixing of (8 +12) 4 Way TPN DB Horizontal with IP 43 Protection suitable for 12Nos S.P. out goings and Supply and Fixing of 1 No., of 40-63A FP MCB as incomer and 12 Nos 6-32 A 10kA SP MCBs for 1 No 4 pole Incommer etc complete as per IS 8623; IS 13032; IEC 61439-3 ( Makes: Legrand(Ekinox 3) / Schneider-A9/Hager Novello+/ Seimens/Havells STADx/ Lauritz Knudsen (Formerly L&T)-Newrange/Indo Asian-Opti Pro/ HPL (Techno)/ Anchor (Uno Plus) Ground Floor
Supply and fixing of ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 7.0W LED Lamp. Makes: Phillips /Crompton / Bajaj / Havells / Halonix/GM/HPL Ground Floor
Supply and fixing of........ LED Slim Panel Round /Square suitable for Recessed / Surface mounting made of diecast aluminum body with powder coating, acrylic diffuser with driver as per IS: 15885 (Part 2/ Sec 13) : 2012, operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10%, with high power LEDs, having System Efficacy of >=100 lumens /watt, CCT: 3000K - 5700K, minimum CRI>70, Luminaire performance complies to IS 10322 (Part 5 / Sec-2) .etc., complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I. Ground Floor
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200 cubic meter/min but without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm) Ground Floor
Supply of Modular type Electronic fan regulator hum free step type socket size in the existing switch board. Makes:Legrand(Myrius/Lyncus)/Schneider(Clipsal X/ Livia AB)/ Crabtree (Murano/Athena)/Lauritz Knudsen-englaze (Formerly L&T)/ GM-(Four-Five)/ Goldmedal(GIFA)/Million (M-VEE)/Anchor (Roma PLUS)/Precision(Series7)/Honeywell(Blenzepro) /Polycab(India Glory) /G.M. (G-Storm) Ground Floor
Labour charges for fixing of ceiling fan with regulator including transportation, 3 core wire leads etc complete Ground Floor
Supply and erecting 19/20mm steel tube down rod of 0.6 mt length with bolts & nuts duly painted with matching colour of fan complete Ground Floor
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete RR Stone Masonary for Parapet alround First Floor
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including Centering Using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For beam First Floor
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including Centering Using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Columns First Floor
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including Centering Using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Roof beams First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Roof Beams/ Slabs") 125 mm thick First Floor
Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels") First Floor
Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, ","7.5mm thick at fixed end and 5cm thick at free and with an average thickness of 6.25cm vibrating,lift charges, curing etc complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Sunshade") First Floor
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). First Floor
Brick Masonry in Superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). First Floor
Brick Masonry in Superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). Parapet wall First Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. First Floor
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ‘C’ channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ‘C’ Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer’s specification & drawing for finished item of work . First Floor
Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multi- chamberedframe with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made. First Floor
Supply and Fixing of Ventilator of size 1.20 x 0.30m with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work First Floor
Supply and Fixing MS Grill including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes, all labour charges etc., complete for finished item of work First Floor
Flooring with Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all shades and Designs set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at 3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701) for flooring First Floor
Providing Skirting with Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) First Floor
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) Internal Plastering First Floor
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) External Plastering First Floor
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) Plastering top First Floor
Dadooing to walls with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and Designs and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707 First Floor
Providing High Yield Strength Deformed (HYSD) steel bars (Fe500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved Designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126). First Floor
Painting to New walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer Grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for INTERNAL WALLS. (APSS No. 911) in All Floors First Floor
Painting to New walls with two coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter..of superior quality of approved brand and shade over base coat of cement primer grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for EXTERNAL WALLS. (APSS No. 911) in All Floors First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Footings First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Column Pedestals First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Columns upto landing First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Base Beam First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Landing Beam First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Landing Slab 150mm thick First Floor
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Waist slab 1st & 2nd flight 150mm thick First Floor
Plain Cement Concrete",M255,"Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"kgs of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorag","charges on all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for Steps (APSS No. 402 )","For steps") First Floor
Flooring with Rough Kadapa slabs of minimum 40 mm thick, size not less than (0.457 x 457M) laid over existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full depth of flooring slabs dully filling joints neatly , including cost and conveyance of all materials like flooring stones, cement, sand, water, etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, pointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701) First Floor
Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm thick pipe, vertical balusters of 50mm dia(outer) 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer) 1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing , polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete for finished item of work. First Floor
Dadooing to walls with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and Designs and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707 First Floor
Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for internal walls alround inside First Floor
Supply and fixing of 25mm outer dia 2.00 to 2.20 mm thick Heavy grade with IS:9537 part 3 FRLS regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required MS deep boxes and all accessories including and labour charges etc., complete. Makes:- Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC First Floor
Supply and Fixing of 25mm outer dia Medium grade (1.60 to 1.8 mm Thick ) with IS:9537 part 3 FRLS regid P.V.C. pipe (ISI MARK) concealed in wall with all required MS Deep Boxes and all accessories including masonary work for light, fan with separate plug point including all labour charges etc., complete. for EPABX, LAN, and CCTV, Run of mains, light, fan points. Makes:- Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC First Floor
Supply and erecting MS Galvanished fan hook box with hook in RCC slab including all Labour charges etc., complete. Makes : Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC First Floor
Supply and run of 1 of 22 /0.3mm (1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes: Finolex / RR kabel Havells/Finecab/KEI/ Polycab/Gloster/ Goldmedal/GM/FortuneArrt/Anchor/Million/APAR(Anushakthi) First Floor
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS : 694 / 1990 specification for Copper cable.and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/ MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement Makes: Finolex / RR kabel /Havells /Polycab /Gloster /Goldmedal/GM First Floor
Supply and run of 3 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes: Finolex / RR kabel /Havells/Polycab/Gloster/ Goldmedal/GM First Floor
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose/BH /SBH and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B. Copper cable Finolex / RR kabel / Havells/Finecab/KEI/Polycab/Gloster/Goldmedal/GM/FortuneArrt/Anchor/Million/APAR(Anushakthi)Makes:Legrand(Myrius/Lyncus)/Schneider(ClipsalX/LiviaAB)/Crabtree(Murano/Athena)/LauritzKnudsen-englaze(FormerlyL&T)/GM-(Four-Five)/Goldmedal(GIFA)/Million(M-VEE)/Anchor (Roma PLUS)/Precision(Series7)/Honeywell(Blenzepro) First Floor
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Accessories Makes : Legrand Myrius / Crabtree verona / L&T / HPL / Schneider Livia/ GM- Zicono/ C&S /Goldmedal (Curve / Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series / Precision / Koncept(Samrat / Qura) / Polycab (Levana) / Anchor-Roma / Amron / IndoAsian /Pointer First Floor
Supply and fixing of 16A/20A ISI Mark 3/2 pin Modular socket with 16A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T/ HPL/ Schneider Livia/ GM-(G NINE/ GX) C&S/ Goldmedal (Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/ Precision/Koncept (Samrat/ Qura) /Ploycab(Levana)/ Anchor-Roma/ IndoAsian/ Pointer First Floor
8WAY SPN DB with IP43nProtection suitable for 8Nos S.P out goings and Supply and fixing 40A DP Isolator as Incommer and 6Nos 6-32A 10KA SP MCBs as outgongs etc complete as per IS 8623; IS 13032; IEC 61439-3. Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/L&T-Newrange ., concealing in wall etc complete. First Floor
Supply and fixing of (8 +12) 4 Way TPN DB Horizontal with IP 43 Protection suitable for 12Nos S.P. out goings and Supply and Fixing of 1 No., of 40-63A FP MCB as incomer and 12 Nos 6-32 A 10kA SP MCBs for 1 No 4 pole Incommer etc complete as per IS 8623; IS 13032; IEC 61439-3 ( Makes: Legrand(Ekinox 3) / Schneider-A9/Hager Novello+/ Seimens/Havells STADx/ Lauritz Knudsen (Formerly L&T)-Newrange/Indo Asian-Opti Pro/ HPL (Techno)/ Anchor (Uno Plus) First Floor
Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Important equipment with 2.5Mtr length 40mm dia 'B' class G.I pipe and 18" dia 3" thick hume pipe ring with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 25 x 6mm x 200mm length to be bolted with nut bolts including supply and termination of No.8 G.I.wire from bottm of the pipe with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) First Floor
Supply and Run of No. 8 SWG copper wire including cost of all accessories and labour charges etc., complete. First Floor
Supply and fixing of ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 7.0W LED Lamp. Makes: Phillips /Crompton / Bajaj / Havells / Halonix/GM/HPL First Floor
Supply and fixing of........ LED Slim Panel Round /Square suitable for Recessed / Surface mounting made of diecast aluminum body with powder coating, acrylic diffuser with driver as per IS: 15885 (Part 2/ Sec 13) : 2012, operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10%, with high power LEDs, having System Efficacy of >=100 lumens /watt, CCT: 3000K - 5700K, minimum CRI>70, Luminaire performance complies to IS 10322 (Part 5 / Sec-2) .etc., complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I. First Floor
Supply of 48" (1200mm) Sweep decorative Ceiling Fan, ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200 cubic meter/min but without Regulator. Makes: Crompton HS Decora / Bajaj Regal Star / Havells Spark deco / Orient summer crown /Halonix(Zephyr) /Polycab(India Glory) /G.M. (G-Storm) First Floor
Supply of Modular type Electronic fan regulator hum free step type socket size in the existing switch board. Makes:Legrand(Myrius/Lyncus)/Schneider(Clipsal X/ Livia AB)/ Crabtree (Murano/Athena)/Lauritz Knudsen-englaze (Formerly L&T)/ GM-(Four-Five)/ Goldmedal(GIFA)/Million (M-VEE)/Anchor (Roma PLUS)/Precision(Series7)/Honeywell(Blenzepro) /Polycab(India Glory) /G.M. (G-Storm) First Floor
Labour charges for fixing of ceiling fan with regulator including transportation, 3 core wire leads etc complete First Floor
Supply and erecting 19/20mm steel tube down rod of 0.6 mt length with bolts & nuts duly painted with matching colour of fan complete First Floor
Supply and transportation of 60W LED Street light Luminaire made of pressure diecast aluminum body with powder coated, having protective toughened glass, supply input voltage 120 - 270V AC, P.F > 0.90, high power LEDs having System Efficacy > 120 lumens/watt and junction temperature < 70°C, with Ingress protection IP66, Luminaire performance complies to IS 10322 (Part 5/Sec-3), driver surge protection 4KV, in-house additional Surge protection 10 KV with optics distribution, THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., complete with earth connection and not less than two years warranty. a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green line) / GE-Venture / Crompton(Neo Series) / Bajaj (Edge) / Halonix(Lumos - Super) / Havells (Endura Series) /Capart(Premium)/Greenlites(Hi-Lux) /Polycab/Keselec/ HPL(City Vision)/ Jaquar(Premium)/Eveready/ Surya (Pollux) / FortuneArrt (Leaf) / Rhino(GPSL04) b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG First Floor
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building. (APSS No. 308) Toilet Block
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) Toilet Block
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) Toilet Block
Brick Masonry in superstructure with CM (1:8) prop: using Fly Ash bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. includingC/C of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504). Toilet Block
Vibrated Reinforced Cement Concrete",M25,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Roof Beams/ Slabs") 125 mm thick Toilet Block
Supply and fixing of Ms door /Grills With fabrication, including cost and conveyance of all materials and all labour charges, etc., complete for finished item of work . Toilet Block
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other Toilet Block
Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site,sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) in All Floors Toilet Block
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630(Parts 1to15) of any colour and finish in all shades and Designs set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707) in All Floors Toilet Block
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades including c/c m/l to site, sales & other taxes, incidental, operational and all l/c etc complete for finished item of work (APSS No. 1201,1207&1212) Toilet Block
Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors Toilet Block
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. Toilet Block
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402) Toilet Block
Brick Masonry in Basement with CM (1:6) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. for basement (APSS No. 501 & 504). Toilet Block
Filling with useful available excavated Earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Toilet Block
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges excluding dewatering charges etc., complete for Septic tank soak pit and sump.(APSS No. 308) Septic Tank
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed. Septic Tank
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) Septic Tank
VRCC M20 Nominal Mix using 20mm Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labor charges such as Providing Centring, shuttering and scaffolding with props and steel plate as per the approved shuttering plan and other accessories as per the norms and stability calculations including cost and conveyance of all accessories Using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc complete for finished item of work, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges etc complete for finished item of work (APSS No.402 & 403) for 100mm Roof Slab. Septic Tank
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop.20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). Septic Tank
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) Septic Tank
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. Septic Tank
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402) Septic Tank
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For 125mm thick Septic Tank
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work
Supplying and fixing PVC Nahani traps 100 mm (4") dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.
Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, angle stop cock 12.70mm dia. first quality Indian make heavy duty, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item of work
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.300 grams
Supplying and fixing of 110mm dia SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work.28.60 mm dia CPVC SDR 13.50
Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.25mm dia
Supply and fixing of white glazed flat back bowl urinals of size 440 mm x 265 mm x 315 mm with internal rim flushing mm fixied with screws complete inidan make (HS W/Parry/Neycer) conforming to IS 2556 -1995 as approved be Engineer - in - charge 12.7 mm PVC connection with brass plumber union nuts CM Coated. including 12.70 mm push cock 1st qulaity of approved make including supply & fixing 31.75 m dia PVC flexible waser pipe of 914.40 mm lenght of 1st including cost and conveyance of all materials to site labour charges etc., complete for finished item of work for all floors
Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.
Supply and Transportation of 1.00 HP Single Phase ISI Mono block CI body Motor pumpset (25x25mm) LS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tuggali BOQ.xlsx
TENDER_DOCUMENT • 0.69 MB
Tuggali Bid Document.doc
TENDER_DOCUMENT • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .