Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC REVATHY TC 79 1020 3 SREE RAGAM ROAD KARIKKAKOM KARIKKAKOM PO THIRUVANANTHAPURAM 695021 | THIRUVANANTHAPURAM | KERALA | 695021 | L1 | Accepted-AOC CA No. GE (AF)/ TVM/ 37 OF 2019 - 2020 | |
| 2 | L2₹8.4 L+₹15,600 (1.88%)Rejected-Finance | L2 | Rejected-Finance L1 being accepted |
Tender Value
₹12.8 L
EMD Value
₹26,000
Closing Date
1 Feb 2020, 6:00 pmClosed
GE AF Trivandrum
Lt Col Parmod Kumar Dalal GE AF Trivandrum
COMPREHENSIVE MAINTENANCE OF LIFTS AND BIO COMPOST AT CHITRALEKHA COMPLEX AND HQ SAC UNDER GE AF TRIVANDRUM
2019_MES_310057_1
GE AF TVM/ 8192
Open Tender
Civil Works
Item Rate
365 days
Trivandrum
As per NIT
7 documents required · 7 mandatory
₹500
GE AF Trivandrum
₹26,000
10 Feb 2020
28 Dec 2019
4 Feb 2020
28 Dec 2019
1 Feb 2020
11 Jan 2020
Amount
SCHEDULE 'A'
M & L for comprehensive maintenance and servicing of electically operated lift 01 No of make KONE Elevators of 544 Kgs capacity (for 8 passengers including lift attendant) controlled by two speed induction motor with 3 landings (Ground + 2 floors) including emergency rescue device at HQ SAC bldg at AF Stn Trivandrum including repairs/replacement of all defective and unserviceable parts as per manufacturer's recommendation during contract period for attending of break down as and when intimated including necessary periodical safety checking and testing of lifts as mentioned in relevent code of practice/IE rule for the safe and efficient performance with all consumables, spares/accessories which ever be required for smooth functioning/trouble free services to the users for 24 hours including Sunday/holiday and submit the maintenance report for smooth functioning of lift, contractor shall also carry out the maintenance of lift in the following period and submit the details in the porforma and as per manufacturer's instruction and procedure laid down:- (a) Fortnightly (b) Monthly (c) Quaterly (d) Yearly
M & L for comprehensive maintenance and servicing of electrically operated Lift 01 No of make: Bharat Bijili of 884 Kilogram capacity controlled by two speed induction motor with 6 landing (Ground + 5 floors) including emergency rescue device at Arjan tower (Lift No - 1) at Chitralekha complex at AF Stn Trivandrum, contractor shall carry out complete maintenance of lift monthly as per manufacturer's recommendation and also attend and rectify the complaint in case of any break down in the lift as and when intimated including necessary periodical safety checking and testing of lifts as mentioned in relevent code of practice/IE rule for the safe and efficient performance with all consumables, spares/accessories which ever be required for smooth functioning/trouble free services to the users for 24 hours including Sunday/holiday and submit the maintenance report for smooth functioning of lift, contractor shall also carry out the maintenance of lift in the following period and submit the details in the porforma and as per manufacturer's instruction and procedure laid down:- (a) Fortnightly (b) Monthly (c) Quaterly (d) Yearly
M & L for comprehensive maintenance and servicing of electrically operated Lift No -02of make: Bharat Bijili of 884 Kilogram capacity controlled by two speed induction motor with 6 landing (Ground + 5 floors) including emergency rescue device at Arjan tower (Lift No - 2) at Chitralekha complex at AF Stn Trivandrum, contractor shall carry out complete maintenance of lift monthly as per manufacturer's recommendation and also attend and rectify the complaint in case of any break down in the lift as and when intimated including necessary periodical safety checking and testing of lifts as mentioned in relevent code of practice/IE rule for the safe and efficient performance with all consumables, spares/accessories which ever be required for smooth functioning/trouble free services to the users for 24 hours including Sunday/holiday and submit the maintenance report for smooth functioning of lift, contractor shall also carry out the maintenance of lift in the following period and submit the details in the porforma and as per manufacturer's instruction and procedure laid down:- (a) Fortnightly (b) Monthly (c) Quaterly (d) Yearly
M & L for comprehensive maintenance and servicing of electrically operated Lift 01 No of make: Olympus of 554 Kilogram capacity (for 8 passengers including lift attendant) controlled by two speed induction motor with 5 landing (Ground + 4 floors) including emergency rescue device at Krishna Tower, Chitralekha complex, AF station, Trivandrum, contractor shall carry out complete maintenance of lift monthly as per manufacturer's recommendation and also attend and rectify the complaint in case of any break down in the lift as and when intimated including necessary periodical safety checking and testing of lifts as mentioned in relevent code of practice/IE rule for the safe and efficient performance with all consumables, spares/accessories which ever be required for smooth functioning/trouble free services to the users for 24 hours including Sunady/holiday and submit the maintenance report for smooth functioning of lift, contractor shall also carry out the maintenance of lift in the following period and submit the details in the porforma and as per manufacturer's instruction and procedure laid down:- (a) Fortnightly(b) Monthly (c) Quaterly (d) Yearly
M & L for comprehensive maintenance and servicing of electrically operated Lift 01 No of make: Olympus of 554 Kilogram capacity (for 8 passengers including lift attendant) controlled by two speed induction motor with 5 landing (Ground + 4 floors) including emergency rescue device at Bhima Tower (1 No), Chitralekha complex, AF station, Trivandrum, contractor shall carry out complete maintenance of lift monthly as per manufacturer's recommendation and also attend and rectify the complaint in case of any break down in the lift as and when intimated including necessary periodical safety checking and testing of lifts as mentioned in relevent code of practice/IE rule for the safe and efficient performance with all consumables, spares/accessories which ever be required for smooth functioning/trouble free services to the users for 24 hours including Sunady/holiday and submit the maintenance report for smooth functioning of lift, contractor shall also carry out the maintenance of lift in the following period and submit the details in the porforma and as per manufacturer's instruction and procedure laid down:- (a) Fortnightly(b) Monthly (c) Quaterly (d) Yearly
Material and Labour for comprehensive maintenance of Electrically operated Lift No-01 of Jonson Make, 884 Kgs capacity controlled by two speed induction motor, with 06 landing (Ground + 02 floors), including Emergency Rescue Device at Staion store , Vayu vihar , AF Station, Trivandrum. Contractor shall carry out complete maintenance of Lift monthly as per manufacturer recommondations and also attend and rectify the complaint in case of any break down in the Lift and submit the Maintenance Report for smooth function of the Lifts. The contractor shall carry out the maintenance of Lift in the following period and submit the details in the proforma attached alongwith particular specifications and as per manufacturers instructions/ procedure laid down. (a) Monthly (b) Bi monthly (c) Quarterly and (d) Half Yearly
M & L for comprehensive maintenance of Fully automatic Mechanical compositing machine based on the technology of heating, crushing mechanism and termophilic process (50 to 550C), electrically operated by 3 phase 12.5 HP geared motor with compositing capacity 200 Kg (Food or wet waste 100% segregated bio-degradable) per day all wetted parts made up of stainless steel grade SS 304 complete with in-built voltage stabilizer, crusher and air pre-heating system and control panel etc of Make Smart Enviro Systems, Model SMART Xpress 200 of capacity 200 Cum/day installed at Vayu Vihar area, AF Station, Trivandrum. Contractor shall carry out complete annual maintenance as per manufacturer recommendations and also attend and rectify any complaint in case of any break down and submit the Maintenance Report to the Engineer-in-Charge complete all as specified and directed. Note: Each job to be done in each quarter .
NOTE for item 2 to 8: (a)(i)The rate quoted shall be inclusive of all spares required during comprehenssive maintenance period. (ii) Rate quoted shall be exclusive of refinishing, repair or replacement of the following:- (a) Elevator car enclosure (b) Elevator car and landing door panels, gates (c) LED Bulbs (15W) and alarm buzzer/bell (d) Cabin fans (e) Main switch in the machine room and incoming electrical wiring to main switch (f) Dry cell, batteries and LCDs (g) Decorative items likes mirror and hand rails.
(b) The Above maintenance includes complete maitenance of exsisting lift & Bio composting machine by regularly and systemmatically examining adjusting fabricating as require for smooth and efficent functioning of the equipment / lift. Cost of all spares items are deemed to be included in the quoted tares. Any item that is not included in OEM AMC schedule but required at site for smooth operation of lift shall be paid to contrcator on this account (c) The Maintenance of lift shall be done through (OEM) the tenderer has to submit intent of MOU from OEM the tenderer has to submit intent of MOU from OEM within fifteen days of acceptance of tender failing which the contra ct will be liable to be cancelled and work shall be excuted at risk & cost of the contractor. Contractor shall conclude AMC with OEM and copy of the agreement will be submitted to Enginr-in-charge and GE before commencement of AMC, no payment shall be made to contractor without submission of valid AMC agreement. (d) The contractor /OEM shall provide mechanic and this mechanic shall be available round the clock i,e. 24 hrs for emergency break down attendance and rescue of trapped persons all as directed by Enginr-in-charge.
(e) The contractor shall obtain signature of Authorized Representative of GE and in token of satisfactory completion of defects. Any minor complaint requiring no spare part shall be rectified within 2 hour & if requiring minor parts, shall be re ctified wihin 4 hrs. Any major complaint requiring major spare part/repair, shall be rectified within 48 hours. In case delay in rectification of any minor complaint, a panel recovery @ Rs 100/- per hour shall be imposed upon the Contractor & in case of delay in major repair of the lifts for more than 48 hours & up to 10 (Ten) days, penalty on the Contractor for a sum of Rs 2000/- per lift per day.
Supply and replacement of damaged looking mirror inside the lift with suitable frame of size 1.70m x 1.20m, complete all as specified and directed.
Removing the un-serviceable flooring of the lift cabin, making the surface smooth and even and supply and fix PVC sheets, laminated plain coloured, marbled mosaic or mottled finish, laid with approved rubber based adhesive in floors of thickness 3.0mm complete all as specified and directed.
Removing the unserviceable curtain gate wall panelling and supply and fix laminated wooden panel for the lift, complete all as specified and directed.
Supply only Enzyme power 150 gm packet made of Smart enviro systems 200 Capacity all as specified and directed
Supply Only Shredder blades of Bio composter 200 Kgs capcity make of Smart enviro systems
Supply only bearing of suitable size of of Bio composter 200 Kgs capcity make of Smart enviro systems
Supply and repiars of battery operated device of lifts 544 kgs, of HQ SAC maing building all as specified and directed
Sub Total of Schedule 'A'
SCHEDULE OF CREDIT
Schedule of Credit (Minus) Rs. 1800.00 B/F from Ser page No.112. NOTE: Bidder shall insert credit amount as rate Rs. 0 in Green field under Col-5.
Sub Total of Schedule of Credit
CHITHRANI TRADERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .