| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAccepted-AOC | L1 | Accepted-AOC L1 ACCEPTED | |
| 2 | L2₹48.4 L+₹95,073.31 (2.00%)Rejected-AOC | L2 | Rejected-AOC L2 REJECTED | |
| 3 | L3₹55.4 L+₹7.9 L (16.6%)Rejected-Finance S U MANZIL SANTHWADI UPPALA | UPPALA | KASARAGOD | KERALA | L3 | Rejected-Finance L3 REJECTED |
Tender Value
₹68.4 L
EMD Value
₹50,000
Closing Date
30 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER HED, KASARGOD
Office of the Executive Engineer, Harbour Engineering Division, Kasaragod
UCR 2022-2023-Improvements of Kalppara Kalayi Road in Mangalpady Grama Panchayath
2023_HED_635369_1
HED/CEHED/TR/230/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
210 days
MANGALPADY
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
6 Feb 2024
23 Dec 2023
1 Jan 2024
23 Dec 2023
30 Dec 2023
23 Dec 2023
Amount
Road work
2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
9.3.C:Providing and Laying Reinforced Cement Concrete pipe NP3 as per design in Single Row<br> Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.<br>(C) 750 mm dia
MUHAMMAD NOWFAL N A
ABOOBACKER SIDDIK S U
Bidder Name
ERNEST ENGINEERING AND CONSTRUCTION COMPANY
ABOOBACKER SIDDIK S U
MUHAMMAD NOWFAL N A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_964701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .