Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC A1 49 35 1 GOWTHAM RESIDENCY N G G O S COLONY AKKAYYAPALEM VISAKHAPATNAM | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530016 | L1 | Accepted-AOC Accepted being workable and reasonable rates are quoted by bidder | |
| 2 | L2₹7.9 Cr+₹28.6 L (3.73%)Rejected-Finance D NO 50 53 2 5 FLAT NO 504 SRI SAI VENKATESWARA RESIDENCY NE LAYOUT SEETHAMMADHARA VISAKHAPATNAM 530 013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹8.0 Cr+₹30.4 L (3.97%)Rejected-Finance | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹8.0 Cr+₹39.4 L (5.14%)Rejected-Finance FLAT NO 304 SN TOWERS JAGANNADHAPURAM JUNCTION AKKAYYAPALEM VISAKHAPATNAM 530 016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹8.1 Cr+₹40.1 L (5.24%)Rejected-Finance | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | MOUNIKA ENTERPRISES H8 | anjaliinfratech H3 | Mahamaruti Constructions H7 | CIVILEC ENGINEERING WORKS H4 | MURALI KRISHNA ASSOCIATES H5 | SRI SURYA PROJECTS H2 | P Govinda Reddy Infrastructure H6 | ANANDA PROFIES PRIVATE LIMITED H1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| .90Schedule "A" Part – I to Schedule "A" Part – XV: NOTE: Schedule "A" Part – I to Part – XV are prepriced by DGNP(V). Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | |||||||||||
| 1.00 | Lumpsum price worked out by the contractor for "BUILDINGS & STRUCTURES", as listed in Schedule "A" Part – I | 1 | Lump Sum | 1,92,00,000 ₹1,92,00,000 Lowest | 2,60,00,000 ₹2,60,00,000 | 2,34,56,789 ₹2,34,56,789 | 2,80,00,000 ₹2,80,00,000 | 2,36,57,560 ₹2,36,57,560 | 2,50,00,000 ₹2,50,00,000 | 2,45,17,615 ₹2,45,17,615 | 1,96,28,000 ₹1,96,28,000 |
| 2.00 | Lumpsum price worked out by the contractor for "DEMOLITION/ DISMANTLING", as listed in Schedule "A" Part – II | 1 | Lump Sum | 49,000 ₹49,000 | 40,000 ₹40,000 | 45,000 ₹45,000 | 4,50,000 ₹4,50,000 | 51,703.79 ₹51,703.79 | 50,000 ₹50,000 | 24,525 ₹24,525 Lowest | 48,017 ₹48,017 |
| 3.00 | Lumpsum price worked out by the contractor for "CLEARANCE / AREA DEVELOPMENT / EARTH WORK EXCAVATION", as listed in Schedule "A" Part – III | 1 | Lump Sum | 8,99,999 ₹8,99,999 | 10,00,000 ₹10,00,000 | 12,00,000 ₹12,00,000 | 9,00,000 ₹9,00,000 | 10,57,863 ₹10,57,863 | 9,60,000 ₹9,60,000 | 7,98,776 ₹7,98,776 Lowest | 89,64,984 ₹89,64,984 |
| 4.00 | Lumpsum price worked out by the contractor for "PILE FOUNDATION", as listed in Schedule "A" Part – IV | 1 | Lump Sum | 97,19,999 ₹97,19,999 | 70,00,000 ₹70,00,000 | 63,00,000 ₹63,00,000 | 70,00,000 ₹70,00,000 | 88,52,838.4 ₹88,52,838.4 | 75,00,000 ₹75,00,000 | 55,79,240 ₹55,79,240 Lowest | 75,09,440 ₹75,09,440 |
| 5.00 | Lumpsum price worked out by the contractor for "INTERNAL WATER SUPPLY", as listed in Schedule "A" Part – V | 1 | Lump Sum | 49,000 ₹49,000 | 45,000 ₹45,000 Lowest | 55,000 ₹55,000 | 75,000 ₹75,000 | 62,202.2 ₹62,202.2 | 45,000 ₹45,000 Lowest | 71,750 ₹71,750 | 50,391 ₹50,391 |
| 6.00 | Lumpsum price worked out by the contractor for "INTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – VI | 1 | Lump Sum | 4,59,000 ₹4,59,000 | 5,00,000 ₹5,00,000 | 5,00,000 ₹5,00,000 | 4,80,000 ₹4,80,000 | 5,93,341.64 ₹5,93,341.64 | 4,00,000 ₹4,00,000 | 3,50,305 ₹3,50,305 Lowest | 5,67,198 ₹5,67,198 |
| 7.00 | Lumpsum price worked out by the contractor for "EXTERNAL WATER SUPPLY", as listed in Schedule "A" Part – VII | 1 | Lump Sum | 1,79,000 ₹1,79,000 | 2,50,000 ₹2,50,000 | 1,68,000 ₹1,68,000 | 1,75,000 ₹1,75,000 | 2,15,882.97 ₹2,15,882.97 | 1,65,000 ₹1,65,000 | 2,93,982 ₹2,93,982 | 1,62,555 ₹1,62,555 Lowest |
| 8.00 | Lumpsum price worked out by the contractor for "EXTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – VIII | 1 | Lump Sum | 32,99,999 ₹32,99,999 | 40,00,000 ₹40,00,000 | 35,00,000 ₹35,00,000 | 32,00,000 ₹32,00,000 Lowest | 39,71,854.73 ₹39,71,854.73 | 40,00,000 ₹40,00,000 | 36,18,766 ₹36,18,766 | 41,27,444 ₹41,27,444 |
| 9.00 | Lumpsum price worked out by the contractor for "PATH/ HARDSTANDING", as listed in Schedule "A" Part – IX | 1 | Lump Sum | 1,12,000 ₹1,12,000 Lowest | 1,50,000 ₹1,50,000 | 1,20,000 ₹1,20,000 | 1,40,000 ₹1,40,000 | 1,49,386.29 ₹1,49,386.29 | 1,50,000 ₹1,50,000 | 1,20,697 ₹1,20,697 | 1,58,265 ₹1,58,265 |
Tender Value
₹7.1 Cr
EMD Value
₹6.8 L
Closing Date
21 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Brig Sushil Kumar DDG CE
DGNP Naval Base Post VISAKHAPATNAM 530014
CONSTRUCTION OF PROJECT-D INFRASTRUCTURE
2025_MES_697037_2
DDG CE V TOKEN 04 OF 2024- 2025
Open Tender
Civil Works
Lump-sum
365 days
Visakhapatnam
As per NIT and Tender
9 documents required · 9 mandatory
₹3,000
DGNP VISAKHAPATNAM
₹6.8 L
Yes
29 Apr 2026
29 May 2025
27 Jun 2025
29 May 2025
21 Jun 2025
14 Jun 2025
29 May 2025 - 7 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.9 | Schedule "A" Part – I to Schedule "A" Part – XV:
NOTE: Schedule "A" Part – I to Part – XV are prepriced by DGNP(V). Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for "BUILDINGS & STRUCTURES", as listed in Schedule "A" Part – I | 1 | Lump Sum | - | - |
| 2 | Lumpsum price worked out by the contractor for "DEMOLITION/ DISMANTLING", as listed in Schedule "A" Part – II | 1 | Lump Sum | - | - |
| 3 | Lumpsum price worked out by the contractor for "CLEARANCE / AREA DEVELOPMENT / EARTH WORK EXCAVATION", as listed in Schedule "A" Part – III | 1 | Lump Sum | - | - |
| 4 | Lumpsum price worked out by the contractor for "PILE FOUNDATION", as listed in Schedule "A" Part – IV | 1 | Lump Sum | - | - |
| 5 | Lumpsum price worked out by the contractor for "INTERNAL WATER SUPPLY", as listed in Schedule "A" Part – V | 1 | Lump Sum | - | - |
| 6 | Lumpsum price worked out by the contractor for "INTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – VI | 1 | Lump Sum | - | - |
| 7 | Lumpsum price worked out by the contractor for "EXTERNAL WATER SUPPLY", as listed in Schedule "A" Part – VII | 1 | Lump Sum | - | - |
| 8 | Lumpsum price worked out by the contractor for "EXTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – VIII | 1 | Lump Sum | - | - |
| 9 | Lumpsum price worked out by the contractor for "PATH/ HARDSTANDING", as listed in Schedule "A" Part – IX | 1 | Lump Sum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
3454Preprice.pdf
Tender Documents • 0.16 MB
3454ARCDRGS.pdf
Tender Documents • 3.77 MB
3454Tender.pdf
Tender Documents • 1.14 MB
3454TRCTDRGS.pdf
Tender Documents • 5.34 MB
3454TDDRGS.pdf
Tender Documents • 17.30 MB
3454IP.pdf
Tender Documents • 3.71 MB
BOQ_796222.xls
BOQ • 0.42 MB
Tenderdocument.pdf
Tender Documents • 17.30 MB
Tenderdocument_2.pdf
Tender Documents • 5.34 MB
Tenderdocument_3.pdf
Tender Documents • 1.14 MB
Tenderdocument_4.pdf
Tender Documents • 3.71 MB
Tenderdocument_5.pdf
Tender Documents • 0.16 MB
BOQ.xls
BOQ • 0.42 MB
Tenderdocument_6.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .