| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | M/S KUMAR CONSTRUCTION and CO. L1 |
|---|---|---|---|---|
| 1.00 | Crusher teeth strengthening/teeth build up. (i) Cost of electrodes. (Bard facing camn-56) | 240 | Kg | 310.9 ₹74,616 Lowest |
| 2.00 | (ii) Cost of teeth welding lobour charge. | 30 | Shift | 1,424.6 ₹42,738 Lowest |
| 3.00 | Repairing segment changing. (i) Dismantling cost. | 9.36 | MT | 2,324 ₹21,752.64 Lowest |
| 4.00 | (ii) Re-Installation cost. | 9.6 | MT | 4,650 ₹44,640 Lowest |
| 5.00 | 113A1A2 bearing block inside & outside cover changing. | 12 | Shift | 4,925 ₹59,100 Lowest |
| 6.00 | 113 B1B2 bearing block inside & outside cover changing | 10 | Shift | 4,925 ₹49,250 Lowest |
| 7.00 | RCB A2 Bunker lining . (i) Fabrication & estblishment cost. | 2.94 | MT | 11,763.5 ₹34,608.22 Lowest |
| 8.00 | (ii) Old dismantling cost. | 1.76 | MT | 6,091 ₹10,750.61 Lowest |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹3.6 L
EMD Value
₹4,600
Closing Date
10 Jul 2025, 6:00 pmClosed
ANOOP KUMAR SINGH
KEDLA WASHERY HAZARIBAGH AREA CCL
Crusher segment teeth strengthening buildup, 113A1A2 and 113B1B2 bearing block side cover changing and RGB A2 bunker lining of Pre Washery at Kedla Washery
2025_CCL_338562_1
PO/KW/eTender/25-26/05, Date 28.06.2025
Open Tender
Miscellaneous Works
Item Rate
15 days
KEDLA WASHERY
AS PER NIT
2 documents required · 2 mandatory
₹4,600
6 Oct 2025
28 Jun 2025
11 Jul 2025
30 Jun 2025
10 Jul 2025
30 Jun 2025
30 Jun 2025 - 5 Jul 2025
Amount
Crusher teeth strengthening/teeth build up. (i) Cost of electrodes. (Bard facing camn-56)
(ii) Cost of teeth welding lobour charge.
Repairing segment changing. (i) Dismantling cost.
(ii) Re-Installation cost.
113A1A2 bearing block inside & outside cover changing.
113 B1B2 bearing block inside & outside cover changing
RCB A2 Bunker lining . (i) Fabrication & estblishment cost.
(ii) Old dismantling cost.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .