Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC | ₹1.3 L | 1 | Accepted-AOC Work awarded to LCCS |
| 2 | 2₹1.5 LRejected-AOC | ₹1.5 L | 2 | Rejected-AOC Second lowest bid rejected |
| 3 | 3₹1.7 LRejected-AOC | ₹1.7 L | 3 | Rejected-AOC Third lowest bid rejected |
| Sl No | Description | Qty | Unit | SIVAKUMAR T L3 | PRESIDENT PERUNAD LABOUR CONTRACT CO- OPERATIVE SOCIETY LTD NO PT.174 L1 | T C Rajesh L2 |
|---|---|---|---|---|---|---|
| 1.00Annual maintenance | ||||||
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 80 | each | 1,000 ₹80,000 | 377.65 ₹30,212 | 415.41 ₹33,232.80 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 50 | each | 1,000 ₹50,000 | 675.98 ₹33,799 | 743.57 ₹37,178.50 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 20 | each | 1,000 ₹20,000 | 919.09 ₹18,381.80 | 1,010.99 ₹20,219.80 |
| 1.00 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 15 | each | 500 ₹7,500 | 1,243.74 ₹18,656.10 | 1,368.11 ₹20,521.65 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 15 | each | 500 ₹7,500 | 550.8 ₹8,262 | 605.88 ₹9,088.20 |
| 1.01 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 10 | each | 500 ₹5,000 | 2,454.32 ₹24,543.20 | 2,699.75 ₹26,997.50 |
Tender Value
₹1.3 L
EMD Value
₹3,346
Closing Date
9 Oct 2025, 6:00 pmClosed
Asst. Executive Engineer
PIP Sub Division, Kozhencherry-P.O, Pathanamthitta Dist. PIN-689641
Cutting Branches
2025_Irrig_805389_1
IRR/PII/TR/2641/2025_5_7_6/1
Open Tender
Civil Works - Canal
180 days
Maniyar
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,346
Yes
26 Feb 2026
4 Oct 2025
14 Oct 2025
4 Oct 2025
9 Oct 2025
4 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1340555.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid