Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.0 L+₹4,900 (0.62%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹8 L+₹5,000 (0.63%)Rejected-Finance | 3 | Rejected-Finance L3 |
Tender Value
₹7.0 L
EMD Value
₹14,100
Closing Date
23 Aug 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Jablyana 1st, 2nd, 3rd phase Tehsil Ghumariwn District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for main storage tank to different sub storage tanks for one year).
2024_HPIPH_91745_1
BLP-BLP-00736 NIT No. 6186-6285 dated 09/08/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
8 documents required · 8 mandatory
₹250
Yes
EE JSV Bilaspur
₹14,100
Yes
21 Sept 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jablyana 1st, 2nd, 3rd phase whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 4 Nos pump house, Rising main: Booster stage 1st phase 80mm dia =220 Rmt, 1st phase 100mmdia 1110 Rmt, 2nd phase 40mm dia 890Rmt, Booster stage 80mm dia =25 Rmt,1srt stage 80mm dia 1785 Rmt, 3rd phase Booster stage 80mm dia=90Rmt, 1st stage 80mm dia =1530Rmt. Pumping machinery:Booster stage 1st phase submerisbhle pump 2x7.50=15 HP, 1st phase 2x30=60 HP, 2nd phase submersible pump 2x3=6 HP, 2nd phase 2x30=60 HP, Booster stage 3rd phase submersible pump 2x5=10 HP, 3rd phase 2x50=100 HP. Distribution system: 285 Km No of storage tanks: 4 Nos main storage tank & 10 Nos sub storage tank, Total working hours: 30 through , 6 Nos perons. Indicators to be mentioned:Average per day 9 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (180000 Litr). Pumping hours per day (12) and energy consumptoin per day 170 Unit.
vishal thakur govt contractor
Parkash Chand Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .