| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.2 L+₹48,156.27 (6.24%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical Not lowest | |
| 4 | Rejected-Technical SHIBU BHAVAN H NANTHIRIKKAL VELLIMON P O KOLLAM 691511 | KOLLAM | KOLLAM | KERALA | 691511 | - | Rejected-Technical Not lowest |
Tender Value
₹8.9 L
EMD Value
₹25,000
Closing Date
5 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE, LID EW Division, Thiruvananthapuram DP
Office of the Executive Engineer, LID EW Division, Thiruvananthapuram DP, Pattom P O, Pincode - 695004
Please refer the tender documents
2022_LSGD_477776_5
e-61/DP TVPM/AEE /LSGD/2020-21
Open Tender
Civil Works - Buildings
Item Rate
120 days
Balaramapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,210
Yes
₹25,000
Yes
8 Jun 2022
25 Feb 2022
8 Mar 2022
25 Feb 2022
5 Mar 2022
25 Feb 2022
60 days
Amount
First Floor Construction
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.2 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.8 : Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:11/2:3 (1 cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
50.6.1.5 : Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
DILEEP.B.G
SHIBU S
Bidder Name
DILEEP.B.G
SATHEESAN ASSASRI S
SHIBU S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_685792.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .