Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 15B PREM SHANTIKUNJ CLUB ROAD CIVIL LINE 2 DELHI WORK PLOT NO 25 26 35 36 SECTOR IIDC IIE SIDCUL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical RANGRETH RANGRETH SRINAGAR JAMMU KASHMIR 190005 | SRINAGAR | JAMMU AND KASHMIR | 190005 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical B 25 INDUSTRIAL ESTATE PARTAPUR MEERUT | MEERUT | MEERUT | UTTAR PRADESH | Rejected-Technical The Bidder did not qualifies the TQR and FQR |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
24 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of SE, OandM Circle, PTCUL, Haldwani
Repairing of 132/33KV, 5MVA Transformer at 132KV Substation, Bhowali under 220KV OandM Division, PTCUL, Haldwani
2020_PTC13_27389_1
SE(OandM)/PTCUL/HLD/39/2020-21
Open Tender
Electrical Works
Item Rate
270 days
Bhowali
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,360
EE, 220KV OandM Division, PTCUL, Haldwani
₹90,000
Office of SE, OandM Circle, PTCUL, Haldwani
4 Feb 2021
9 Nov 2020
26 Dec 2020
9 Nov 2020
24 Dec 2020
9 Nov 2020
23 Nov 2020
180 days
Dismantling of conservator, radiators, OLTC, HV bushing, jumpers etc. and draining of transformer oil and filling of Nytrogen gas at main tank of transfomer
Dragging and loading of transformer on truck including shifting of transformer from plinth to main road, making way of transformer, filling of soil, stone etc. wherever is required for bringing the transformer safely.
Transportation of transformer from 132KV S/s, Bhowali to repair site including cost of unloading, transit insurance, taking all required permissions from road authorities etc.
Lifting of core assembly and dismantling of Old HV, LV & TV windings, cleaning of core, lamination, tank etc.
Reassembly of new HV, LV, TV and Tap coil windings including cost of new HV, LV, TV and Tap coil complete including matching all parameters winding resistance, percentage impedance etc. as per old transformer. Considering cred for old winding approx. weight of HV Leg Coil - 770 Kg. Approx. weight of LV Leg Coil - 630 Kg. Approx. weight of TV Leg Coil - 189 Kg. Approx. weight of Tap Leg Coil - 330 Kg.
Cost of complete new insulation etc.
Cost of consumables.
Cost of Gaskets complete.
Cost of 52KV Neutral bushing with metal parts.
Cost of 145KV Condenser type bushing of Alstom/ABB/CGL make with metal parts.
Cost of 33KV Bushing with metal parts.
Cost of 11KV Bushing with metal parts.
Cost of supply and fixing of new marshalling box including cost of new microswitch type WTI & OTI and all control wiring etc.
Cost of PRV.
Cost of Silicagel breather.
Cost of Double float buchloz relay complete with alarm and tripping contact.
Overhauling of OLTC. (a) Replacement of Gaskets. (b) Lubricatio of mechanical system. (c) All internal electrical connectioin complete. (d) Replacement of Tap changer motor. (e) Replacement of OLTC terminal barrier board.
Re-tanking after repair, providing and filling of fresh transformer oil (5.8 KL) and filtration, making thre rpeaired power transformer ready for all routine/acceptance test as per IS/IEC:2026/1977 with latest amendment.
Painting of transformer.
Routine testing at repair site of transformer as per IS/IEC:2026/1977 including (Turn ratio, Winding resistance, Insulation, Ten Delta, Magnetic current, SFRA) etc.
Transportation of repaired transformer from repair site to 132KV S/s, Bhowali including cost of transit insurance, taking all required permissions from road authorities etc.
Shifting/dragging of transformer from main road to plinth including making way of transformer filling of soil, stone, CC work etc. wherever is required for bringing the transformer safely.
Installation of transformer including fixing of conservator, radiator, OLTC, bushings, all jumpers, control wiring, oil filtration of transformer etc.
Testing of transformer as per IS 2026 including (Trun ration, Winding resistance, Insulation, Ten Delta, Magnetic current, SFRA etc.)
Elecon Conductors Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .