Loading…
Loading…
Tender ID
Tender Value
₹38.2 L
Closing Date
3 Apr 2026, 6:00 pmClosed
Sr Manager C and M HQ
C AND M MAITHON
Annual Rate Contract of Survey and Geo Technical Investigation including Preparation of Forest Proposal for various upcoming Transmission lines Substations undertaken by DVC at 400KV 220KV 132KV 33KV and 11KV Voltage level
2026_DVC_270960_1
2600000946
Open Tender
Miscellaneous Works
Item Rate
365 days
Panchet
Please refer tender documents
3 documents required · 3 mandatory
₹0
Exempted
C AND M MAITHON
13 Mar 2026
13 Mar 2026
4 Apr 2026
13 Mar 2026
3 Apr 2026
13 Mar 2026
23 Mar 2026
SURVEY TOWARDS CONSTRUCTION OF 400KV, 220KV, 132KV, 33KV & 11KV TRANSMISSION LINES (SCHEDULE - A)
GEOTECHNICAL INVESTIGATION TOWARDS CONSTRUCTION OF 400KV, 220KV & 132KV TRANSMISSION LINES & SUBSTATIONS (SCHEDULE - B)
Cost of Withdrawl (SCHEDULE - C)
Note : 1. Please read the tender documents carefully before filling the price bid. 2. Please fill up the GREEN coloured fields under this page and Schedule - A, B, C. 3. If any deviation is taken in the NIT, bidder may fill-up "Cost of Withdrawl Sheet" in Schedule-C. 4. Bid evaluation will be done only on totality of the quoted price by the bidder but not in isolation of any schedule of price. 5. Bid evaluation will be done in comparisaion with the NIT estimate which is exclusive of GST. 6. GST will be applicable as per GOI rule.
Item Rate BoQ
BoQ_Ver3.0
NIT No: 2600000946
Name of the Bidder/ Bidding Firm / Company :
SCHEDULE - A PRICE SCHEDULE OF SURVEY TOWARDS CONSTRUCTION OF 400KV, 220KV, 132KV, 33KV & 11KV TRANSMISSION LINES (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Detail survey along with printing of survey report for "33KV trnasmission line" using DGPS, total work station / Digital Theodolites / ALTM including profiling in PLSCAD, tower / location spotting and optimization of location computer aided techniques as well as other activities as detailed in the tender specification. This also includes digitized contouring at undulated terrain at tower locations where there is level difference of 1.5 mtr. from tower leg to tower leg.
Detail survey along with printing of survey report for "132KV, 220KV, 400KV transmission line" using DGPS, total work station / Digital Theodolites / ALTM including profiling in PLSCAD, tower / location spotting and optimization of location computer aided techniques as well as other activities as detailed in the tender specification. This also includes digitized contouring at undulated terrain at tower locations where there is level difference of 1.5 mtr. from tower leg to tower leg.
Plotting of Route on Mouza/Village Maps & Preparation of Land Schedule
Preparation of Forest proposal for obtaining forest clearance
DGPS (Differential Global Positioning System) Survey towards Digitization and Geo-referencing of forest maps along with printing of survey report.
Land Contour Survey along with printing of survey report.
Survey along with printing of survey report for identification and finalization of most economic optimum route and submission of reports for 11kV transmission line
Item Rate BoQ
BoQ_Ver3.0
NIT No: 2600000946
Name of the Bidder/ Bidding Firm / Company :
SCHEDULE - B PRICE SCHEDULE OF GEOTECHNICAL INVESTIGATION TOWARDS CONSTRUCTION OF 400KV, 220KV & 132KV TRANSMISSION LINES & SUBSTATIONS (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Mobilisation charges for all tools ans plants with accessories, materials, labour, supervision etc. at site work required in connection with boring and testing work including setting up boring rig and shifting to different bore hole points etc. and also including withdrawl of the same from the site after completion of work in all respect as per direction of Engineer In-Charge. (Payment will be made after successful completion of the work)
Soil Resistivity test as per specifications & direction of Engineer In-Charge, complete in all respect including submission of report (Rate to be quoted as per Location basis)
Soil Investigation per Line Corridor/Substation by making bore-holes by any standard method to any depth below G.L. in all kind of soil and sample collection for detailed soil investigation for normal locations as per specifications & direction of Engineer In-Charge (Rate : Each location/meter) (Payment will be made on the no. of bore-holes multiplied by the length driven into ground with/without use of casting pipe )
For depth 0 to 10 m (As mentioned under Sl No- 3)
For bore hole no. up to 2
For bore hole no. exceeding 2 but up to 5
For bore hole no. exceeding 5 but up to 10
For bore hole no. exceeding 10
For depth 10 to 20 m (As mentioned under Sl No- 3)
For bore hole no. up to 2
For bore hole no. exceeding 2 but up to 5
For bore hole no. exceeding 5 but up to 10
For bore hole no. exceeding 10
For depth more than 20m (As mentioned under Sl No- 3)
For bore hole no. up to 2
For bore hole no. exceeding 2 but up to 5
For bore hole no. exceeding 5 but up to 10
For bore hole no. exceeding 10
Detail Soil Investigation for River Crossing locations, if any, etc. as per Technical Specification
Boring and drilling in rocks up to depth of 2 meter and collection / recovery of rock core including laboratory test on rocks for determining compressive/shear strength/ specific gravity etc. and supplying information in the drilling logs on the physical characteristics of the rock samples as per IS specification & direction of Engineer In-Charge by Diamond drill
Preparation and submission of Soil Investigation Report including bore-log data, field/laboratory investigation result, sample calculation for SBC and (settlement analysis particularly in respect of building considering type of structure i.e. industrial/ residential) other soil parameters including recommendation of the foundation type of each location (per Line Corridor/ Substation)
Item Rate BoQ
BoQ_Ver3.0
NIT No: 2600000946
Name of the Bidder/ Bidding Firm / Company :
SCHEDULE - C :Deviations(DULY COMPLETED WITH COST OF WITHDRAWAL). (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TS_Survey_and_Geo_Tech_Investigation.pdf
Tender Documents • 1.13 MB
Tender_Spec.pdf
Tender Documents • 0.15 MB
Scope_of_Work.pdf
Tender Documents • 0.21 MB
SCC.pdf
Tender Documents • 0.84 MB
FQP.pdf
Tender Documents • 0.33 MB
B_FQP_Soil_Investigation.pdf
Tender Documents • 0.44 MB
A_FQP_Survey.pdf
Tender Documents • 0.09 MB
GCC.pdf
Tender Documents • 0.79 MB
BOQ_315940.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .