Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 CrAccepted-Finance | ₹12.5 Cr | 1 | Accepted-Finance This mentioned quoted amount is exclusive of GST |
| 2 | 2₹23.5 Cr+₹11.0 Cr (88.1%)Accepted-Finance BUILDING NO 8 8TH FLOOR TOWER B DLF CYBER CITY DLF CYBERCITY GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹23.5 Cr+₹11.0 Cr (88.1%) | 2 | Accepted-Finance This mentioned quoted amount is exclusive of GST |
| 3 | 3₹39.7 Cr+₹27.2 Cr (218.0%)Accepted-Finance 415 VIPUL PLAZA SECOTR 54 SUNCITY GURGAON HARYANA122003 | GURUGRAM | HARYANA | 122003 | ₹39.7 Cr+₹27.2 Cr (218.0%) | 3 | Accepted-Finance This mentioned quoted amount is exclusive of GST |
| Sl No | Description | Qty | Unit | IBI Group India Private Limited L3 | PricewaterhouseCoopers Private Limited L2 | Medulla Soft Technologies private limited L1 |
|---|---|---|---|---|---|---|
| 1.01Item Description | ||||||
| 1.02 | REMUNERATION FOR LOCAL STAFF | 1 | Nos | 20,16,12,447 ₹20,16,12,447 | 21,20,00,000 ₹21,20,00,000 | 5,23,50,000 ₹5,23,50,000 Lowest |
| 1.03 | Support Staff | 1 | Nos | 2,26,21,800 ₹2,26,21,800 | 11,04,000 ₹11,04,000 Lowest | 64,80,000 ₹64,80,000 |
| 1.04 | Transportation (Fixed Costs) | 1 | Nos | 1,86,24,000 ₹1,86,24,000 | 3,60,000 ₹3,60,000 Lowest | 48,00,000 ₹48,00,000 |
| 1.05 | Office Rent (Fixed Costs) | 1 | Nos | 1,66,00,008 ₹1,66,00,008 | 12,00,000 ₹12,00,000 Lowest | 18,00,000 ₹18,00,000 |
| 1.06 | Office Supplies, Utilities and Communication (Fixed Costs) | 1 | Nos | 52,08,000 ₹52,08,000 | 96,000 ₹96,000 Lowest | 10,80,000 ₹10,80,000 |
| 1.07 | Office Furniture and Equipment (Rental) | 1 | Nos | 43,20,000 ₹43,20,000 | 2,40,000 ₹2,40,000 Lowest | 14,40,000 ₹14,40,000 |
| 1.08 | Reports and Documents Printing | 1 | Nos | 1,01,11,086 ₹1,01,11,086 | 1,08,000 ₹1,08,000 Lowest | 16,86,000 ₹16,86,000 |
| 1.09 | Survey, Investigation and data to be collected | 1 | Nos | 11,81,39,835 ₹11,81,39,835 | 1,98,07,000 ₹1,98,07,000 Lowest | 5,52,64,000 ₹5,52,64,000 |
| 1.10Grand Total excluding goods and service tax (for all 3 tasks) | ||||||
Tender Value
Refer Docs
Closing Date
9 Feb 2026, 3:00 pmClosed
Director IAHE
IAHE Campus Noida
Consultancy Services for Traffic Simulation Model, Road Safety Audit and City Logistic Plan for Mumbai City of Maharashtra
2025_MoRTH_885845_1
IAHE/Trg/18/TrafSim/23-24/Mum
Open Tender
Consultancy
Lump-sum
730 days
Noida
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Indian Academy of Highway Engineers
Exempted
IAHE Campus Noida
1 Jul 2026
17 Nov 2025
10 Feb 2026
17 Nov 2025
9 Feb 2026
21 Jan 2026
26 Nov 2025
Item Description
REMUNERATION FOR LOCAL STAFF
Support Staff
Transportation (Fixed Costs)
Office Rent (Fixed Costs)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Furniture and Equipment (Rental)
Reports and Documents Printing
Survey, Investigation and data to be collected
Grand Total excluding goods and service tax (for all 3 tasks)
Grand Total including goods and service tax (for all 3 tasks)
Note: (1) Total Amount/Cost inclusive of all tax and liabilities except GST shall be considered for Financial Evaluation. (2) No escalation will be payable during the services (3) Insurances shall not be allowed separately. These will be incidental to main items.
BoQ_Ver3.0
Bidder Name :
I. REMUNERATION FOR LOCAL STAFF
NUMBER #
Project Head
Sr. Simulation Expert
Simulation Expert
Data Analyst
Data Collection Manager
Sr. Road Safety Auditor
Road Safety Auditor
Simulation Expert
Data Collection Manager
Sr. Logistic Expert
Economist
Traffic Engineer
Urban Transport Planner
Simulation Expert
Data Analyst
Data Collection Managers
Sub Total
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Staff 8
Staff 9
Staff 10
Sub Total
BoQ_Ver3.0
Bidder Name :
II.Support Staff
NUMBER #
Office Manager
Typist
Office Boy
Office Manager
Typist
Office Boy
Night Watchman
BoQ_Ver3.0
Bidder Name :
III.Transportation (Fixed Cost)
NUMBER #
Transportation (Fixed Cost)
BoQ_Ver3.0
Bidder Name :
IV. Office Rent (Fixed Costs)
NUMBER #
At IAHE Noida* Fixed 25000 (INR)
At Site (Mumbai)
BoQ_Ver3.0
Bidder Name :
V. Office Supplies, Utilities and Communication (Fixed Costs) It includes office drafting supplies, computers, running cost (electricity etc.), Domestic and International communication etc.
NUMBER #
At IAHE Noida*
At Site (Mumbai)
BoQ_Ver3.0
Bidder Name :
VI. Office Furniture and Equipment (Rental)
NUMBER #
At IAHE Noida*
At Site (Mumbai)
BoQ_Ver3.0
Bidder Name :
VII.Reports and Document Printing
NUMBER #
Monthly Reports
Inception Report & QAP
Data Collection and Analysis Report
Base Model Report including Calibration & validation
Final Model Report
User manual Report for operation of Model
Scenario Analysis Report
Bottleneck Identification and Solutions Evaluation Report
Junction Design Improvement Report
Accident-Prone Locations Study and Mitigation Measures Report
Signal Optimization and Synchronization Report
Pedestrian and Non-Motorized Transport Mobility Improvement Report
On-Street Parking Issues Investigation and Parking Policy recommendations Report
Infrastructure Development Optimization and Capacity Enhancement proposal Report
Emergency Response Analysis Report
Emissions Reduction Strategy Report
Final Report
Monthly reports
Inception Report & QAP
Data Collection & Analysis report including Topography data via LiDAR, Existing drawing on Auto-CAD for all major intersections
Road Safety Audit Reports for Major Intersections
Conceptual Design Improvements Report
Accident-Prone Locations Study & Mitigation measures Report
Final Report
Monthly Reports
Inception Report & QAP
Base Year Cargo, existing freight infrastructure (transit corridors, stations, terminals, warehouses etc.) and other data collection and assessment/analysis report
Base Model Report including Calibration & validation
Final Model Report
User manual Report for operation of Model
Scenario Analysis Report
Commodity-Based Modelling and Demand Projections Report
Major Commodity Movement Mapping and Future Demand Assessment Report
Gap Analysis and Infrastructure Needs Assessment Report
Freight Bottleneck Identification and Mitigation Measures Report
Final Report
BoQ_Ver3.0
Bidder Name :
VIII. Survey, Investigation and data to be collected
NUMBER #
All various survey/data collection activities (primary as well as secondary data) required to develop traffic simulation model which shall be done by the consultant
Topography Survey of listed junctions using LiDAR
All various survey/data collection activities (primary as well as secondary data) required to perform Road Safety Audit which shall be done by the consultant
All various survey/data collection activities (primary as well as secondary data) required to develop City Logistic Plan which shall be done by the consultant
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_931109.xls
BOQ • 0.67 MB
RFP.pdf
Tender Documents • 3.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .