22 Apr 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
V J SATISH KUMAR
Cherlapally Installation, Bharat Petroleum Corporation Limited
Single Party Tender to Automation OEM Vendor Advanced Systek for CHP TAS CAMC and RE contract extension FY 22-23. Floating Single Party Tender to Automation OEM Vendor Advanced Systek for CHP TAS CAMC and RE contract extension FY22-23
1897
1000385986
Single Tender
Supply
Cherlapally Installation
28 Apr 2022
20 Apr 2022
22 Apr 2022
20 Apr 2022
22 Apr 2022
20 Apr 2022
60 days
1. Terms & Conditions of the CAMC:
All Terms & Conditions applicable of CAMC agreement dated 03.04.2015 shall be
applicable for this CAMC also.
a. Quarterly Preventive Maintenance visits shall be arranged byMs. Advanced Sys Tek. By
respective OEMs of all the equipment in addition to breakdown visits.
b. All the requirements applicable during CAMC agreement dated 03.04.2015 shall be
applicable for this CAMC also.
c. All the jobs mentioned in warranty period are required to be carried out by TA vendor
during CAMC by way of deploying their service engineer at site.
d. Some of the jobs are given below:
• Service Engineer of TA vendor shall carry out Preventive Maintenance for
entire system as part of CAMC.
• Breakdown Maintenance (as required) will be carried out by TA vendor as
e. Any up gradations required in hardware shall be undertaken by BPCL through TA vendor at
mutually agreed rates.
f. However no additional charges shall be paid towards software upgradation.
g. BPCL Has the right to request for service of Resident engineer based on mutually agreed
h. Service Engineers or Resident Engineer, the scope, testing and service reports shall be
maintained and submitted as per OEMs and as required by BPCL Engineer
i. During CAMC, all repairs/comprehensive maintenance including supply of spares & quarterly
preventive maintenance visits, breakdown visits by OEMs, will be ensured by the resident
engineer of the Automation Vendor. All service reports and reports as required by OEMs and
BPCL Engineer shall be maintained by Service & Resident Engineer.
j. During CAMC period, Vendor will take complete responsibility for any defect observed in the
system (i.e., in instrumentation, software, hardware, communication & networking
media’s/protocol interfacing with ISC..etc.,), any other minor debugging required in software
for better compatibility with the ISC system ( in case it undergoes any changes), any other
equipment & other services replace /rectify the same immediately, free of cost, during
startup and online operations.
k. Shutdowns and Preventive Maintenance Works shall be planned in advance and approval
shall be taken without disturbing the regular Operations.
l. All major preventive Maintenance works and regular shutdowns shall be taken prior
approvals along with schedule.
m. Vendor shall provide assistance with service engineers, REs & PM works schedule on non-
working days/hours also.
n. Vendor is required to furnish a Performance Bank Guarantee equal to the amount of
Security Deposit.
o. Expenses towards travel/boarding/lodging of OEMs/Vendors Engineers during the CAMC
period are to be borne by the vendor.
2. Performance Bank Guarantee :
The Performance Bank Guarantee (3% of order inclusive of Taxes) is required to be
submitted for guarantee for system performance till the end of CAMC period and shall be
valid for 6 Months after completion of CAMC Period.
3. Penalty for Non-Performance:
TA Vendor has to maintain the minimum system availability of 96% calculated as per system
performance criteria of BPCL.
At the end of each month, the calculation for system availability shall be done and submitted
to BPCL along with consolidated for a period of 3 Months. If average system availability goes
below 96%. A penalty equivalent to (2 X (100%-%age system availability in the month) of
quarterly CAMC charges shall be recovered from the payments.
4. Contract Agreement:
You shall be required to enter into a formal agreement with BPCL within seven days
from the date of this letter. Till such time this letter of intent together with following
documents shall constitute the agreement and the understanding between the
parties hitherto as to the subject thereof and shall supersede any other discussion
held or correspondence exchanged.
a. General Conditions of the Tender.
b. Scope of Work.
Any other conditions & Scope which are not specially mentioned in this agreement
Remains Same as CAMC agreement dated 03.04.2015.
You are required to comply with all the Rules and Regulations and Laws, etc. of Govt.
or the State Govt. or any competent authority applicable to the workmen employed
or whose services are otherwise availed by you for the above work. You are required
to maintain the proper documents /records as per the statutory laws as applicable
at site. Please ensure that Group Insurance, EPF, and other Acts, etc cover the
workman employed by you.
List of Equipemnts Covered under AMC
S/N Item Description Total Qty
• 1 Batch Controller 26 Nos.
• 2 Card Reader 18 Nos.
• 3 PD Meter with Pulse Transmitter– 3” 26 Nos.
• 4 Strainer– 3” 26 Nos.
• 5 Air Eliminator – 3” 26 Nos.
• 6 Digital Control Valve – 3” 26 Nos.
• 7 RTD 24 Nos.
• 8 RIT 24 Nos.
• 9 Earthing Relay 12 Nos.
• 10 Pressure Gauge 32 Nos.
• 11 Pressure Transmitter 22 Nos.
• 12 Temperature Transmitter 08 Nos.
• 13 Terminal Server – 16 Port 02 Nos.
• 14 Ethernet Switch – 24 Port 02 Nos.
• 15 Ethernet Switch – 08 Port 04 Nos.
• 16 Networking Panel 01 No.
• 17 PDP Panel 01 No.
• 18 Process PLC Panel 02 Nos.
• 19 Safety PLC Panel 02 Nos.
• 20 Printer 01 No.
• 21 Smart Terminal Manager Software 01 No.
• 22 TFMS Software 01 No.
• 23 Barrier Gate 04 Nos.
• 24 EDU with Announcement System – 05 Lines 01 No.
• 25 UPS System – 2 X 15 KVA 01 Set.
• 26 Hooter 11 Nos.
• 27 ESD Push Button 16 Nos.
• 28 Radar Gauge (HUB, TSI, MSTW) 17 Sets
• 29 Radar Gauge Guidedwave 03 Sets
• 30 Level Switch 19 Nos.
• 31 Pressure Switch 24 Nos.
• 32 CIU 02 Nos.
• 33 Batch Controller (TT Reporting & Sealing) 02 Nos.
• 34 Card Reader (TT Reporting & Sealing) 02 Nos.
• 35 Earthing Relay (SGD) – Rly sliding 03 Nos.
• 36 Security Screen (TV) 01 No.
• 37 Terminal Server at TT Reporting 01 No.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1897.pdf
pdf • 0.44 MB
BUDGETDOC_1897.pdf
pdf • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .