| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹196.8 CrAccepted-AOC | ₹196.8 Cr | L1 | Accepted-AOC Lowest Tenderer |
| 2 | L2₹198.8 CrRejected-AOC C 102 ANSAL PLAZA HUDCO PLACE KHELGAON MARG NEAR SOUTH EXTENSION NEW DELHI 110 049 | ₹198.8 Cr | L2 | Rejected-AOC Not Lowest Tenderer |
| 3 | L3₹206.6 CrRejected-AOC B 104 MANISHA TOWER PLOT 7B SECTOR 23 DWARKA NEW DELHI 110 077 | ₹206.6 Cr | L3 | Rejected-AOC Not Lowest Tenderer |
| 4 | L4₹212.0 CrRejected-AOC A 760 SUSHANT LOK PHASE 1 GURGAON 122002 HARYANA INDIA | ₹212.0 Cr | L4 | Rejected-AOC Not Lowest Tenderer |
| 5 | L5₹222.9 CrRejected-AOC | ₹222.9 Cr | L5 | Rejected-AOC Not Lowest Tenderer |
Tender Value
₹230 Cr
EMD Value
₹1.1 Cr
Closing Date
30 Jan 2023, 6:00 pmClosed
DG MAP
DG MAP E IN C BRANCH KASHMIR HOUSE RAJAJI MARG NEW DELHI-110011
COMPLETION OF BALANCE WORKS FOR CONSTRUCTION OF DWELLING UNITS INCLUDING ALLIED SERVICES FOR OFFICERS, JCOs/ORs AT AHMEDABAD, GANDHINAGAR AND CHILLODA
2022_MES_540791_1
CA No DGMAP PH II PKG 25 R C II OF 2022 23
Open Tender
Civil Works
547 days
AHEMDABAD AND GANDHINAGAR AND CHILODA
AS PER LETTER INVITING TENDER
10 documents required · 10 mandatory
₹3,000
DG MAP
₹1.1 Cr
DG MAP NEW DELHI
23 Mar 2023
1 Aug 2022
1 Feb 2023
1 Aug 2022
30 Jan 2023
18 Jan 2023
2 Aug 2022 - 18 Aug 2022
1 Dec 2022
Amount
SCH "A " SECTION - II INTERNAL WATER SUPPLY Total of Sch " A " Section -II
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total of Sch " A " Section -III
SCH "A " SECTION- IV ROAD, PATH Total of Sch " A " Section -IV
SCH "A " SECTION- V AREA DRAINAGE AND CULVERT Total of Sch " A " Section -V
SCH "A " SECTION - VI SECURITY WALL,FENCING, GATES & NAME BOARD Total of Sch " A " Section -VI
SCH "A " SECTION - VII STREET LIGHTING Total of Sch " A " Section -VII
SCH "A " SECTION - IX RAIN WATER HARVESTING Total of Sch " A " Section -IX
SCH "A " SECTION - XII RETAINING WALL Total of Sch " A " Section-XII
SCH "A " SECTION - XIV EXCAVATION,EARTHWORK& SITE CLEARANCE Total of Sch " A " Section-XIV
Total of Sch " A " BALANCE WORK OF HANDED OVER/ NEAR COMPLETION BUILDING. Total of Sch"A" Section-XVI
SCHEDULE A SECTION I Completion of balance work in block of 36 Dwelling Units for Sqn Ldr & above at Chilloda, in ten storeyed construction (stilt + 9 storeys) including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages structural glazing, lift machine room,fire water tank and domestic water tank, one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes, pergola,servant quater etc. In the stilt covered garages, common stores, stores,equipment stores etc are to be made. All above items to be constructed complete all as specified and shown on drawing.
BLOCK- C (Pocket-1) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK- D (Pocket-1) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 30 Dwelling Units (24 for "Sqn Ldr" and 6 for Capt/Flight Lt.) at Chilloda, in nine storeyed construction (stilt + 8 storeys)including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing lift machine room,fire water tank and domestic water tank,one lost tank in each DU, steel stairs/ ladders, arrangement for drying out clothes, pergola,servent quater etc. In the stilt covered garages, common stores, stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK- B (Pocket-1) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 32 Dwelling Units for "JWOs" at Chilloda, in nine storeyed construction (stilt + 8 storeys), including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank,loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - W 5 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - W 7 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - W 6 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosedas per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 28 Dwelling Units for " JWOs" at Chilloda, in eight storeyed construction (stilt + 7 storeys),including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank,one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - W 3 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 27 Dwelling Units for " JWOs" at Chilloda, in eight storeyed construction (stilt+ 7 storeys)including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank,one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made.All above items to be costructed complete all as specified and shown on drawing.
BLOCK - W 2 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 26 Dwelling Units for " JWOs" at Chilloda, in eight storeyed construction (stilt + 7 storeys), including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank,one loft tank in each DU steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - W 1 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 6 Dwelling Units for " JCOs" at Ahmedabad, in triple storeyed construction (ground + 2 storeys), including covered garages, covered staircase, balconies, ramp, and passages etc. complete all as specified and shown on drawings.
BLOCK - 15 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 36 Dwelling Units for " CPL & below" at Chilloda, in ten storeyed construction (stilt + 9 storeys),including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank, one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - C 7 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 8 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 9 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 32 Dwelling Units for " CPL & below" at Chilloda, in nine storeyed construction (stilt + 8 storeys), including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages, structural glazing, lift machine room,fire water tank and domestic water tank,one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - C 4 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 5 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 6 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 1 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - C 2 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 26 Dwelling Units for " Sargent" at Chilloda, in eight storeyed construction (stilt + 7 storeys), including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages,structural glazing, lift machine room,fire water tank and domestic water tank, one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - S 2 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 4 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 5 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 7 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 3 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 6 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - S 8 (pocket -2) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 24 Dwelling Units for " OR" at Gandhinagar, in seven storeyed construction (stilt + 6 storeys), including all types of shafts (electrical, fire pipe etc), covered staircase, lift well / lift shaft, mumty, balconies, ramp, passages, structural glazing, lift machine room,fire water tank and domestic water tank, one loft tank in each DU, steel stairs/ ladders, arrangement for drying out clothes etc. In the stilt covered garages,electrical room,stores,equipment stores etc are to be made. All above items to be costructed complete all as specified and shown on drawing.
BLOCK - OR 2 Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - OR 3 Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 8 Dwelling Units for " OR" at Ahmedabad, in four storeyed construction (ground + 3 storeys), including covered garages, covered staircase, balconies, ramp and passages etc. complete all as specified and shown on drawings.
BLOCK - 3 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 4 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 5 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 11 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 14 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 6 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 7 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 8 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 9 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 10 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 12 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 13 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
SCHEDULE A SECTION I Completion of balance work in block of 6 Dwelling Units for " OR" at Ahmedabad, in triple storeyed construction (ground + 2 storeys), including covered garages, covered staircase, balconies, ramp, and passages etc. complete all as specified and shown on drawings.
BLOCK - 1 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 2 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 3 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 4 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 5 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 6 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 7 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 8 (pocket -6) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 1 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 2 (pocket -7) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 9 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 10 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 11 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 7 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 8 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 12 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 13 (pocket -8) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 19 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 20 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 21 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 7 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 8 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 9 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 10 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 12 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 13 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 14 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 15 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 16 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 17 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 18 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 22 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 23 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 24 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 25 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 26 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 27 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 28 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 29 (pocket -9) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 9 (pocket -10) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 10 (pocket -10) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 11 (pocket -10) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 12 (pocket -10) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
BLOCK - 13 (pocket -10) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as per Block wise Detail of Works Executed .
Construction of Guard Post at Chiloda complete all as specified and shown on drawings.
Construction of Sentry Post at Ahmedabad complete all as specified and shown on drawings
Construction of Guard Post at Gandhinagar complete all as specified and shown on drawings.
Construction of Garbage bin at Chiloda complete all as specified and shown on drawings.
Construction of Garbage bin at Ahmedabad complete all as specified and shown on drawings.
Construction of Garbage bin at Gandhinagar complete all as specified and shown on drawings.
Construction of Block of 14 Car Garages at Chiloda complete all as specified and shown on drawings.
Construction of Block of 4 Car Garages at Chiloda complete all as specified and shown on drawings.
Construction of Block of 8 Car Garages at Chiloda complete all as specified and shown on drawings.
Construction of Block of 10 Scooter Garages at Chiloda complete all as specified and shown on drawings.
Construction of Block of 8 Scooter Garages at Chiloda complete all as specified and shown on drawings.
Construction of Block of 4 Scooter Garages at Chiloda complete all as specified and shown on drawings.
Construction of Service center at CHILODA.complete all as specified and shown on drawings.
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessoriesunder Sr.No.( 38.00 & 38.01), complete all as specified and as directed by Project Manager:-
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 39.00 & 39.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 40.00 & 40.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 41.00 & 41.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 42.00 & 42.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 43.00 & 43.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 44.00 & 44.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Design, manufacture, supplying, installing in correct aligned position, making proper connections, testing and commissioning of LV panels suitable for 415 V, 3 phase, 4 wire, 50 Hz power distribution system, Indoor type, IP42 rating, free standing, floor mounting, sheet metal clad, cubicle,dust and vermin proof type compartmentalized design, fabricated out of 2mm thick CRCA sheet steel powder coated and angle iron frame of size 40x40x6 mm, complete with aluminium bus bars, separate earth bus bar to be provided throughout the length of the panel with incoming and outgoing feeders accommodated in a modular multitier arrangement and interlocked to avoid paralleling, adequate size cable alley, earthing, numbering including danger plate etc as required as per specifications and drawings and CPRI approved comprising of and including the following accessories under Sr.No.( 45.00 & 45.01), complete all as specified and as directed by Project Manager:- a) Aluminium busbar 300 Amp rated capacity, 3 phase and neutral, 4 strips duly insulated with colour code insulation - 1 Set
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Supply and fixing cable tray, perforated ,size 300x50 mm made out of MS Sheet 2 mm thickness powder coated fixed into cable duct , wall, ceiling etc. with suitable fixing fasteners all as per site requirement and as directed by Project Manager.
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Supply and fixing SMC meter box single door,concealed metal hinges,shock proof,maintenance free,weather proof of ,inner size 250x200x100 mm with arrangement of meter fixing plate,glass viewing window and cable entry all as required for servent Qtr.
Notes applicable for Sch- "A" Section-III:- Under Sr.No. 48.00 & 48.01 1. All quantities in this schedule are PROVISIONAL. 2. The rates of all items are for supplying, fixing, connecting up and testing complete all as specified except where otherwise stated in this schedule. 3. All internal wiring shall be carried out in concealed type conduit. This type of wiring shall be applicable for all categories and all types of DUs. Earthing wire for individual circuits and / or sub main circuits shall also run inside the conduit itself. Earthing conductor shall not be laid / run separately outside the conduit in the concealed mode. 4. The rates of point wiring in concealed conduit shall include for necessary terminal boxes for accommodating switches, socket outlets, fan regulators etc and joint boxes of adequate sizes, both type of boxes covered with Hylam sheet cover of 3 mm uniform thickness and teakwood blocks for fixing. 5. The rates for point wiring do not include for electric fittings and accessories such as ceiling roses, lamp holders, pendants, socket outlets, brackets, switches, shades, lamps, call bells etc.
6. The cost of materials and labour for leaving /forming/cutting necessary chases, recesses, holes and sinkings etc. (wherever required) in walls, ceiling, floors etc. including those required for concealed conduit wiring work and making good in Cement and Sand mortar (1:3) and finishing to match the adjoining surfaces, shall be deemed to be included in the lump sum prices of buildings in Schedule ’A’ Section-I. 7. The cost of material and labour for pressed steel circular fan boxes with hooks complete shall be deemed to be included in the lump sum prices of building in Schedule ‘A’ Section-I. 8. Earth continuity shall be checked and approved by the Project Manager. 9. Earthwork and excavation shall be measured and paid for separately under appropriate items of Schedule ‘A’ Section-XIV, unless mentioned otherwise in the description of the items of this schedule i.e. Schedule ‘A’ Section-III
SCH "A " SECTION - VII STREET LIGHTING Supplying, installation, testing and commissioning of cubical compartmentalized out door type street light panel with double door and hut type top fabricated out of 2mm thick CRCA steel sheet and base channnel 75mmx 40mm and suitable for operation on 415Volts 50 HZ AC supply comforming to IP- 65 and with switch gear and accessories as given below complete with pade looking sealing arrangement , earthing stud labeling , painting interconnections , providing of danger plates etc. as per specification. the panel shall be placed over pedestals of PCC 1:3:6 type C-2 having height 300mm above the floor level with one metre wide platform in front of the panel at the level of pedestal complete all as specified under Sr.no. 49.01 to 49.04 and directed.
INCOMING:- 1 Nos. 63 Amps. TPN MCCB(25 KA) with electronic releases. 1 Set phase indication lights (R, Y, B) 1 No. Volt Meter (digital type) with inbuilt VSS & control fuses. 1 No. 0-200 Amp. Ammeter (digital type) with inbuilt ASS
BUS BARS:- 200 Amps. TP&N Aluminium bus bars (25 KA)
OUTGOINGS:- 6 Nos. 63A TPN, MCB (10KA).
3 Nos.three phase 24 hour Timer Switch for controlling street light with adjustable time setting range on each phase such there the switching of street light are 100% , 66% and 33% from 6pm to10 pm , 10pm to 2am and 2am to 6am respectively
SCH "A " SECTION - VII STREET LIGHTING Supply and fixing in position steel tubular swaged pole 9m long type 410 HP31 with CI base plate final taper plug bolts nuts and screws including two coats of aluminium paint over a coat of red oxide primar and numbering of poles complete all as specified and directed.
SCH "A " SECTION - VII STREET LIGHTING Supply and laying of 3x2.5 sq mm.PVC insulated FRLS copper conductor cable stranded from the junction box to the street light fixture complete with all connections as required.
SCH "A " SECTION - VII STREET LIGHTING Supply and filling of sand for cable cushioning complete all as specified and directed.
SCH "A " SECTION - VII STREET LIGHTING Supplying and fixing cable route marker with route indication on 150mm dia cast iron disc bolted to 40x40x3mm angle iron grouted in 1:3:6 concrete block 150x150x300mm deep including two coats of aluminium paint on the metal work all as specified.
SCH "A " SECTION - VII STREET LIGHTING Supply and laying of bricks , common burnt clay building bricks , sub class-B designation 75 for cable protection complete as per specified.
SCH "A " SECTION - VII STREET LIGHTING Suppling and fixing of junction box fitted in the pole, out door type IP-54 and comprising of 6 A. SP MCB with turminals suitable for turminating incoming and out going cables up to 4x16sqmm.1.1 KV grade armoured pvc insulated including 2 no. cable and termination with double compression copper glad for fixing armourmed cable of size 4x6 to 4x16 sqmm. complete all as per specified.
SCH "A " SECTION - VII STREET LIGHTING Supply and fixing of 40mm bore GI pipe medium grade 1.5m long on either side of the pole for cables entry complete as required.
SCH "A " SECTION - VII STREET LIGHTING Design supply , erection of 50mm bore medium grade GI pipe for fixing street light bracket with 1.5m long . The rate should inclusive of supply and erection with necessary clamps screws one coat of aluminium paint etc.
SCH "A " SECTION - VII STREET LIGHTING Supply & fixing Integral CFL post top lantern (Gate Light Fitting) suitable for 2 x 18 watt CFL lamps with opal acrylic diffuser and accessories (make-Bajaj, cat pt No. BJCPT1218 opal) or equivalent as approved by project manager.
SCH "A " SECTION - VII STREET LIGHTING Supply & fixing street light fitting, energy saving type, environment friendly made out of pressure die cast aluminium with high power LED 80 watt all as specified, (Make-Havells, cat pt No. LHELANU 7PG6J080) or equivalent as approved by project manager.
SCH "A " SECTION - VII STREET LIGHTING Supply & fixing single pole contactor 240 volt 50 Hz 25 Amp rated capacity, for street light timer (make-L&T, cat pt No. CS94176) or equivalent as approved by project manager.
SCH "A " SECTION - VII STREET LIGHTING Supply, laying & testing Aluminium condutor XLPE insulated PVC sheathed & sleeved armoured and overall PVC PVC sleeved 1.1 KV grade power distribution cable 4x16 sq.mm confirming to relevant IS code and as per specification, laying in ground for in existing trench including dressing and clamping the cable with MS zinc passivated calmps, etc. complete all as specified.
Notes applicable for Sch- "A" Sec- VII:- 1. All quantities in this schedule are PROVISIONAL. 2. The Rates for all items are for supplying, fixing/ laying, connecting up wherever required and testing complete all as specified except where stated otherwise in this schedule . 3. Earthwork and excavation shall be measured and paid for separately under appropriate items of Schedule"A" Section XIV, unless mentioned otherwise in the description of the items of this schedule i.e. Schedule- VII .
SCH "A " SECTION - VIII SOLAR WATER HEATERS Providing and fixing thermosyphon circulation type Solar Hot Water heater system as per IS 12933:2003, Part 1-5, of the under mentioned capacities without electrical back-up, comprising of and including all interconnecting insulated piping from collectors to tank. (approx. size of collector: 2033x1033x100mm), toughened clear glass min 4 mm thick, collectors absorbivity>0.95, (collector's insulation material and thickness shall be as per I.S. specifications), Hot water storage tank of grade SS-304 duly insulated, cladding with SS 430 sheet, M. S. powder coated structure to support the system with required Nos. of connections for inlet and outlet etc. complete all as specified and as directed by Project Manager for the following: -
(a) System capacity 300 litres per day, storage tank capacity 300 litres.
(b) System capacity 400 litres per day, storage tank capacity 400 litres.
(c) System capacity 500 litres per day, storage tank capacity 500 litres.
(d) System capacity 700 litres per day, storage tank capacity 700 litres.
Notes applicable for Sch- "A" Sec- VIII:- 1. All quantities in this schedule are PROVISIONAL. 2. The Rates for all items are for supplying, fixing/ laying, connecting up wherever required and testing complete all as specified except where stated otherwise in this schedule . 3. Earthwork and excavation shall be measured and paid for separately under appropriate items of Schedule"A" Section XIV, unless mentioned otherwise in the description of the items of this schedule i.e. Schedule- VIII .
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 884 Kgs/ 13 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 10 stops / 10 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 544 Kgs/ 8 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 10 stops / 10 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 884 Kgs/ 13 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 9 stops / 9 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 544 Kgs/ 8 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 9 stops / 9 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 884 Kgs/ 13 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 08 stops / 08 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 544 Kgs/ 8 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 8 stops / 8 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 884 Kgs/ 13 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 7 stops / 7 openings on the same side. All items referred in schedule notes be provided
SCH "A " SECTION - X LIFTS Supplying, installation, testing and commissioning of passenger lift having capacity 554 Kgs/ 8 passengers, lift car having entrance and landing doorswith one hour fire rating , automatic electric leveling device, automatic rescue devices, , .All steel works in machine room such as beam with bearing plate .Lift pit should have necessary spring buffer for car and counterweights and MS ladder. Stops and Openings : 7 stops / 7 openings on the same side. All items referred in schedule notes be provided
Notes applicable for Sch- "A" Sec- X:- ( Sr. No. 73.01 to 73.04)
11. T sections guides for car and counterweight of rigid steel as per IS-4666 Para 5.2. Guide shoes spring should be of phosphorous bronze or cast irons. 12. Earthing for all machine room equipments. 13. The testing of lift with 25 % excess load shall be conducted as per Para 25 of IS 4666- 2000 as amended to date. The arrangement for testing load and instrument required shall be arranged by contractor. 14. Following features among others will be provided in all lifts:
a) Micro push buttons (Step Silver) with call registration indications. b) Stainless steel facia plates for car operating panel & for LOP. c) Emergency alarm with battery back up & inbuilt charger unit d) Emergency light in car with battery back up & inbuilt charging unit. e) Intercom ( 2 Ways) f) Phase failure & phase reversal protection g) Full height Infra Red Light Curtain for auto door safety. h) Fireman’s switch operation at main lobby. i) Auto fan & car light with its control. k) Digital indicator (VFD) inside the car & digital indicator (LCD) on landings with direction arrow. l) Direction Reversal button in car. m) Door close/door open button in car n) Non-Stop functions. o) Nuisance call cancellation function. p) Car Enclosure : SS hairline finish with SS false ceiling with CFL, fan and PVC flooring. q) Car Entrance: Automatic centre opening doors(SS) with VVVF door drive r) Landing Entrance: Automatic centre opening doors. s) Lift announcement system. t) Car chine. u) Cross flow rectangular (low noise/mild air flow) fan – 01 of approved make. v) Decorative spot light (LS3)
w) Overload function with constant indication/ buzzer. x) 5/15 A power socket & light point at every floor level in the hoist way with 15W CFL y) Emergency landing device ELD (ARD) z) Extra cores in traveling cable for customer smoke detectors. aa) Background music speakers system ab) Cill angle for fixing landing doors. 15. The rates to be quoted for each lift shall include cost of one year free maintenance. 16. Two copies of complete literature giving technical information of components/parts of equipment offered for each type of lift.
SCH "A " SECTION - XI FIRE FIGHTING Supplying, laying, jointing and testing "Heavy Class (C-Class)" mild steel pipe of following sizes, conforming to IS:1239 (Part-I) (1974 Print) and IS : 1239 (Part-II) (1979 Print) including amendments thereto and also flanges and fittings such as bends, elbows, tees, reducers, nipples, coupling caps, unions, flange joints, rubber insertions and galvanised iron, nuts, bolts, washers, hangers etc. confirming to IS:1239 (Part-I) (1974 Print) including fixing the pipe on wall/ceiling with suitable M.S strip / clamps / bracket including all necessary pipe support, cutting to size, drilling, welding / fixing and welding insert plates in RCC structural members wherever required, fixing the pipe on wall / floor / ceiling using anchor fasteners, G.I. pipe sleeves of higher dia to be provided wherever the pipes are crossing the walls or floors and sealing the sleeve with glass wool and fire sealant, cutting holes in brick or RCC walls / slabs and making good the same including painting with one coat of red oxide zinc chromate primer and two coats of synthetic enamel postal red paint complete as required, as specified and all as directed by Project Manager:-
(a) 150 mm dia
(b) 100 mm dia for work in portions of buildings upto four storeys height.
(c) 80 mm dia
(d) 25 mm dia
SCH "A " SECTION - XI FIRE FIGHTING Supply and fixing internal fire hydrant comprising of and including single headed stainless steel body fire hydrant landing valve 80 mm inlet with single outlet with control and fitted complete with 63 mm dia female instantaneous coupling of stainless steel conforming to type "A" of IS:5290-1977 on the outlet complete with orifice flange as required with ABS plastic blank cap, steel chain, adapter as per CPWD Specification Part - V as required including 6 mm thick Stainless Steel Orifice Plate of suitable size as required, complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing first aid fire hose reel equipment conforming to IS : 884-1969 (with upto date amendments), finished with post office red spray paint and complete with and including 20 mm dia 36 metres long hose tubing of approved make conforming to IS:444, swinging type hose guide fixing bracket assembly, 25 mm dia gate valve, 5 mm outlet gunmetal nozzle with shut off valve as required complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing 63 mm dia 15 metre long Non-percolating Reinforced Rubber Lined (RRL) Type 'A' ISI marked (IS-636), woven jacketed hose pipe tested to bursting pressure 32 Kg/Sq cm with and including gun metal male & female instantaneous type coupling approved by fire authority, ISI marked (IS:903), machine wound with GI wire with the pipe complete in all respects, all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing fire hose cabinet of size 2100 x 900 x 600 mm, weather proof, fabricated from 16 gauge MS sheet of fully welded construction with hinged double front door, partially glazed with 4 mm thick glass with locking arrangement duly painted with two coats of synthetic enamel postal red point over a coat of red oxide zinc chromate primer with "Fire Hose Box" written on front, suitable to house 2x15 metre (two lengths) of canvas hose with couplings, branch pipe, One fireman's axe, first aid fire hose reel and hydrant outlet complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing standard short size stailness steel SS-304 branch pipe with gunmetal nozzle 16 mm dia outlet with standard male instantaneous spring lock type 63mm dia coupling (Branch pipe and nozzle shall be ISI marked with (IS : 903-1985) complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing standard fireman's axe with heavy insulated rubber handle conforming to IS : 926 complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing gunmetal two way collecting head with 63mm dia instantaneous type inlet and 150mm dia flanged outlet with built-in check valve, ISI marked (IS : 904) complete with bolts, nuts and rubber insertions including necessary supports complete in all respect for fire brigade connection to underground tanks and wet risers complete all as specified and as directed by Project Manager
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing 4.5 Kg capacity portable carbon-di-oxide (CO2) type fire extinguishers consisting of welded M.S cylindrical body, squeeze lever discharge valve fitted with pressure indicating gauge, internal discharge tube, high pressure discharge hose of not less than 10 mm dia, 1 metre long, discharge nozzle, suspension bracket, conforming to IS : 2878 finished externally with red enamel paint and fixed to wall with brackets complete with initial charge with CO2 gas conforming to IS:307-1966 filled to a filling ratio of not more than 0.667 complete all as specified and as directed by Project Manager for the following:-(Note: - 1. The body of fire extinguisher shall be CCE approved with IS:2878 marking and showing the filling/validity date)
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing 9 litres capacity portable chemical fire extinguisher water (gas pressure) type with gun metal cap consisting of welded M.S cylindrical body, squeeze lever discharge valve fitted with pressure indicating gauge, internal discharge tube, high pressure discharge hose, discharge nozzle, suspension bracket, conforming to IS : 940 finished externally with red enamel paint and fixed to wall with brackets complete with initial charge complete all as specified and as directed by Project Manager for the following:- (Note: - 1. The body of fire extinguisher shall be CCE approved with IS:940 marking and showing the filling/validity date).
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Supply installation and testing C.I. Dual plate wafer type non-return valves (PN 1.6), of under mentioned sizes ductile iron disc, 416 SS stem, EPDM lining, Stainless Steel spring complete with 2 Nos. matching flanges, rubber insertion, nuts, bolts and washer etc. complete all as specified and as directed by Project Manager for the following:-
(a) 100 mm dia for work in portions of buildings upto four storeys height.
SCH "A " SECTION - XI FIRE FIGHTING Supply installation and testing cast iron wafer type Butterfly valves Class (PN 16) SS 304 Disc, Nitrile / EPDM / Neoprene lining (lever operated upto 150 mm and gear operated for 200mm and more) of under mentioned sizes complete with 2 Nos matching flanges, rubber insertion, nuts, bolts and washers etc. complete all as specified and as directed by Project Manager for the following:-
(a) 150 mm nominal bore
(b) 100 mm dia
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing forged brass Ball valve 25 mm dia with SS ball and PTFE teflon seats and seals, full bore spindle type, M.S. plate handle, with PVC sleeve, confirming to I.S. 9890 class 125, female BSP threads, suitable for 15 kg/sq cm. complete in all respects complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing dial type pressure gauge with 20 mm dia ball valve and pipe at hydrant station, complete in all respects, Dial dia 100 mm, calibration 0-15 kg/sq cm (valve shall be paid separately) complete all as specified and as directed by Project Manager for the following: -
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of electrical motor driven Fire Pumping Set suitable for automatic operation consisting of and including the following as per the specifications for providing at the locations / portions of the buildings mentioned in sub items (a) & (b) of this item given here-under:-
i) Horizontally mounted, centrifugal type single/ multi stage fire pump having cast iron body, bronze impeller,stainless steel shaft SS 410, grease lubricated bearing, end suction, mechanical seal & capable of delivering 900 LPM against a total head of 35 M complete with necessary pressure gauge with GM cocks on the delivery side including bypass arrangement (with 50 valve and upto 5M G.I. medium grade pipes) for periodical testing of the working of the testing of the working of the pumping set .
ii) Squirrel cage induction motor totally enclosed fan cooled type suitable for 415 Volts +_ 15%, 3 phase, 50 Hz A.C.supply, 15.0 H.P. or as required for the above pump coupled with flexible copuling including earthing as per relevant Indian Standard & specifications. Cubical type floor / wall mounted Fire Pump Control Panel
iii) Common bed plate for mounting Pump and Motor fabricated of Motor fabricated of suitable M.S.Channel as per manufacturer's recommendations.
iv) Suitable RC.C Pump-Foundations as per manufacturer's design and 4 nos. Dunlop (cushy foot) heavy duty Antivibration mounting pads. (for each motor).
For work in portions of buildings upto terrace level.(Note - The individual rates quoted for sub item shall include for all the provisions given under ser item nos 88.01 to 88.04 separately for the sub item and nothing extra shall be admissible on this account)
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing C.I. “Y” suction strainer with stainless steel perforated sheet screen, flanged ends iner installed outside water tanks complete all as specified and as directed by Project Manager for the following: -
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing double flanged vertical air vessel fabricated shell from 8 mm thick & dished ends 10 mm thick M.S.plate, 250 mm dia and 1.50 m high common for fire terrace pump complete with pressure switches to operate the pump at drop of pressure finished with two coats of Red enamel paint of first grade over one coat of primer externally & two coats of epoxy coating inside complete all as specified and as directed by Project Manager for the following:-
(a) For work in portions of buildings upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Providing and fixing reselient rubber neoprene lined single arch vibration eliminators of under mentioned sizes suitable for raw water upto 45 deg. C. temperature, working pressure 7 kg and test pressure 14 kg per sq. cm. complete all as specified and as directed by Project Manager for the following:-
(a) 150 mm dia
(b) 100 mm dia
SCH "A " SECTION - XI FIRE FIGHTING SUPPLY & FIXING OF ISI marked (IS:13849) Portable Stored Pressure ABC Powder type Fire Extinguisher, Capacity 5.0 kg. M.S. seamless body, forged brass valve body , neck ring discharge hose, pressure gauge complete in all respects including initial fill and wall suspension bracket. Make: (Minmax / Cease fire / or equivalent)
Upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING SUPPLY & FIXING OF ISI marked (IS: 10204) Portable fire Extinguisher, Mechanical Foam (AFFF) type Cap. 9 ltrs. CRCS sheet body, Neck ring, brass plunger, spring loaded piercing device, syphon tube fitted with top dome, foam aerating nozzle mounting bracket Make: (Minmax / Cease fire / or equivalent).
Upto terrace level
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of microprocessor based UL/EN54 compliant analog addressable intelligent fire alarm control panel (2) loop complete with central processing unit. Network communication card RS-485 port, 80 Characters LCD display with primary power supply at 230V with 24/36 volts. Sealed maintenance free (SMF) batteries backup (as per IS) complete with solid state boost/trickle automatic battery charger. The panel shall support Graphics package for central monitoring of all field devices.
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of microprocessor based UL/EN54 compliant analog addressable intelligent fire alarm control panel (6) loop complete with central processing unit. Network communication card RS-485 port, 80 Characters LCD display with primary power supply at 230V with 24/36 volts. Sealed maintenance free (SMF) batteries backup (as per IS) complete with solid state boost/trickle automatic battery charger. The panel shall support Graphics package for central monitoring of all field devices.
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of hard addressable type manual call point, 1 stage with in-built LED, lighting up automatically to confirm its actuation complete as per specification as required.
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of UL/EN listed wall mounted hooter with strobe (100 dba) complete as per specification as required.
SCH "A " SECTION - XI FIRE FIGHTING Supply, installation, testing and commissioning of addressable input/output control module for shutting down AHU's, lift pressurization fans and ventilation fans etc. including power supply for driving the control module as per requirement.
SCH "A " SECTION - XI FIRE FIGHTING Supplying, laying, testing and commissioning of point wiring for following sensors and devices with 2 x 1.5 sq.mm FRLS PVC insulated multi-stranded single core copper conductor wire in M.S. conduit with conduit accessories including loop circuit from main fire alarm panel located at ground floor in fire control room complete as required. Wiring for Input/Output modules. Wiring for manual call point.
SCH "A " SECTION - XI FIRE FIGHTING Supply, laying and testing of under noted sizes of CONTROL CABLE copper conductor XLPE insulated PVC sheathed & sleeved armoured and overall PVC sleeved 1.1 KV grade power distribution cables conforming to relevant IS code and as per specification in ground (in existing trenches) through pipe or on wall / racks cable trays including termination, all glands, dressing and clamping the cable with MS zinc passivated clamps etc. as required.
2 x 1.5 sq.mm
SCH "A " SECTION - XI FIRE FIGHTING Supplying, laying, testing and commissioning of point wiring for hooters with strobe circuits with 2 pair 1.5 sq.mm copper conductor flexible wire (1 pair shielded and 1 pair unshielded) including loop wiring from MFCP in M.S. conduit with conduit accessories complete as required.
Notes applicable for Sch- "A" Sec- XI:- 1. All quantities in this schedule are PROVISIONAL. 2. The Rates for all items are for supplying, fixing/ laying, connecting up wherever required and testing complete all as specified except where stated otherwise in this schedule . 3. Earthwork and excavation shall be measured and paid for separately under appropriate items of Schedule"A" Section XIV, unless mentioned otherwise in the description of the items of this schedule i.e. Schedule- XI.
SCH "A " SECTION - XIII CRADLE ( FAÇADE ACCESS SYSTEM )
(1) Design, fabrication, assembly shop testing painting, supply and installation of façade Access equipments as per following description under Sr. No. (103.02 to 103.16)
(a) Electrically operated double suspended working platform (cradle)suitable for 250kg SWL of size 2.0 meters(length) x 0.60 meters(width) consisting of the following:
(i) Body of the platform shall be fabricated out of standard Aluminium Sections such as tubes, angles, channels, strips, sheets etc. with guard rails and toe guard and 1.2mm thk perforated Aluminium Sheet Cladding in appoxy paint Finish. The flooring of the cradle shall be 3 mm thick Aluminium chequered plate. (1No.)
(ii) Platform supporting stirrups fabricated out of M.S. Section in epoxy paint finish.(2Nos)
(b) 0.8 Ton Capacity ‘Dee’ Shackles fabricated out of forged steel as per IS6132-1987 duly hot dipped galvanized finish(4Nos)
(c )Requisite length and Nos. of special steel wire rope of 8mm diameter having 6x19F construction wire of Usha Martin or equivalent make of Primary and secondary wire ropes(wire rope shall have capacity of minimum 1 Ton Safe Working Load). One end of wire rope will be duly tapered and fused and other end will be spliced(4Nos)
(d) Rope climbing machine suitable for minimum of 700 Kg. capacity, having a climbing speed of 9 m/min.(consisting of 1.5 KW motor, 3 phase, 415 VAC, 4Amp. Rated current) fitted with Electromechanical Fail Safe Device type brakes, suitable gear box, rope conveying mechanism with centrifugal brakes for emergency descent at controlled speed in case of power failure.(2Nos)
(f)Double door control panel of weatherproof construction made out of MS sheet (2mm thick) with contractors. Overload relay (Havell’s or L&T Make), single-phase preventor (Minilec make), SD transformer(Y.K. or equivalent make) push buttons(L&T make), MCB (havell’s make), Terminal Block (Elmec or equivalent Make) etc complete duly finished in epoxy paint finish. (Schematic drawing of the panel to be provided for approval before manufacture of the same)(1No) Cable Collection bin made out of Aluminium duly finished in epoxy paint (1m height) made of 1.2mm Aluminium sheet clamped to the cradle with guard rail (1 No.)
(g) Safety Belt (ISI marked) (2 Nos)
(h) Soft rubberized Guide Rollers of 100mm (minimum) diameter and 240mm(minimum) length with telescopic bar and bracket (2nos)
(j) Main Electrical Cable for supply of electricity from socket fixed at terrace to Control Panel on the cradle, of 2.5sqmm, 4 core flexible cable Havell’s/Rajdoot make and required length. (1 length)
(k) Heavy Duty Castor wheels of 150Kgs.(minimum) capacity of 100/150mm diameter base width 50mm (minimum) made out of Polymer/Ultra Hi Polymer with castor brackets.(4Nos)
(l) Polymer Rollers (50mm diameter X 40mm thick) with MS brackets for guide rope (2nos per platform) / on to suit as per platform. Having suitable provisions to carry glass/double glass unit for replacement of glass in façade.
2. Safety Devices: The Cradle shall be equipped with the following safety devices: (i) Anti-fall bolc-stop safety device for secondary wire rope(2nos) (ii) Overload limiter with limit switches(inbuilt in Rope Climbing Machine) (iii) Buffer plate.(2nos) (iv) Limit switch to avoid over hoisting(2nos) (v) Single phase preventor fitted at control panel. (vi) Manual Descending (during power failure) at controlled speed with the help of centrifugal brake (integrated with rope climbing machine). (vii) Emergency control button integrated with control panel. (viii) Soft rubber guide rollers with telescopic bar and bracket(2nos)
3. Movable Suspension jib (4 Nos) These shall be made out easily dismountable elements mainly telescopic square pipes. Counter weights shall be kept on rear side of the jib. All jibs shall be resting on 4nos castor wheels, which can be shifted by pushing manually. The same is consist of : 2.25 mtr long Jib Front height adjustor Mobile counter weight cross bar Mobile front cross bar Rear height adjuster Reinforcement brace With 500kg counter weight
Note : All above equipments is one set for quoting the rate per set
Notes applicable for Sch- "A" Sec- XIII:- 1. All quantities in this schedule are PROVISIONAL. 2. The Rates for all items are for supplying, fixing/ laying, connecting up wherever required and testing complete all as specified except where stated otherwise in this schedule . 3. The tenderer is to get the cradle(façade access system) designed from one of the approved manufacturers, mentioned in the tender. The tenderer shall submit full dimensioned working drawing of the equipment offered together with detailed technical specifications therEof and illustrative & descriptive literature to enable full technical appreciation of the offer.The tenderer shall also submit drawing showing showing foundation details equipment,layout of plant /equipment/accessories and electrical wiring diagram Any change in specifications of the system if any from the Schedule 'A' be highlighted through a separate letter to assess the cost of changes.
SCH "A " SECTION - XVI BALANCE WORK OF HANDED OVER/ NEAR COMPLETION BUILDING
Marking of block number (at two places in a particular block) as well as marking of DU number for all DUs (at one place in a particular DU) of that particular block with numbered ceramic tiles of size 8” x 8” for each alphabet / number separately for numbering of each block and of size 6” x 6” for each alphabet / number separately for numbering of each DU over 15 mm thick plastered surface in CM 1:4 as directed by the Project Manager Chiloda AF) :-Pocket- 1 Block- A, Pocket- 2 Block- C-3, C-10, S-1, W-4, W-8 ( Chiloda AF) Gandhinagar:- Block OR-I (Arun Vihar)
Providing & fixing of Fire doors shall be provided in the openings where shown on drawings. Fire doors shall be 44mm thick steel fire rated doors of 120 minutes fire rating fabricated with 2 nos. 1.0mm thick galvanized sheet with infill of fire rated proprietory insulation filler and both faces of sheet with lock seam joints at stile edges and internal reinforcement at top, bottom and stile edges for fire rating. The door frames shall be manufactured from 1.6mm thick galvanized steel sheet pressed form of single rebate profile of size 100mm X 50mm (nominal). The door frames and door shutters shall be primed with etch primer and finished with PU/Powder coating. Prototype Test certificate for a test carried out at WarringtonU.K. for fire rating of doors, shall be attached along with manufacturer’s test certificate for all fire doors. Provisions for fixing all fixtures shall be built in on the doors prior to the supply. The fire doors shall be complete with and including all accessories, SS hinges, door closer, mortice lock, panic bar, pull type handle, SS tower bolt, vision panel complete as per design in all respect. Chiloda AF) :-Pocket- 1 Block- A Pocket- 2 Block- C-3, C-10, S-1, W-4, W-8 ( Chiloda AF) Gandhinagar:- Block OR-I (Arun Vihar)
To check validity of guarantee, the following information will be inscribed on each building on a plate/ Board of 450 mm x 300 mm size prepared by plastering on the plastered surface with 20 mm thick in cement and sand mortar (1:4) at such a place and in such a manner as approved by the PM. Date of expiry of guarantee shall be calculated or computed from the physical date of completion of the buildings as certified by the PM. Chiloda (AF):-Pocket- 1 Block- A Pocket- 2 Block- C-3, C-10, S-1, W-4, W-8 Pocket -3 Block A & B (G+1) Gandhinagar:- OR-1 (Arun Vihar) Ahmedabad:- Pocket- 2 Block- 2,4 & 5 ,Pocket- 6 Block- 10,11,14,15 & 16 Pocket- 8 Block- 1 to 6, Pocket- 9 Block- 2,3,4,6 &11 , Pocket- 10 Block- 4 to 8
Providing and fixing to the inlet mouth of rain water Upvc pipe length 450mm Chiloda (AF):-Pocket- 1 Block- A Pocket- 2 Block- C-10
Supplying & fixing of 8 mm thick glass with 3 mm deep 50 mm long grinded groove, all complete as per dierction of Engineer in Charge. Chiloda (AF):-Pocket- 1 Block- A
Supplying & fixing of 30 x 40 x 1.5 mm S.S. Bracket for glass shelves Pocket- 1 Block- A ( Chiloda AF)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of grith upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Providing & fixing M.S. Grills of Required Pattern in Frames of Windows etc.with M.S. flats, square or round bars etc. all complete.
Notes applicable for Sch- "A" Sec- XVI:- 1. All quantities in this schedule are PROVISIONAL. 2. The Rates for all items are for supplying, fixing/ laying, connecting up wherever required and testing complete all as specified except where stated otherwise in this schedule . 3. Earthwork and excavation shall be measured and paid for separately under appropriate items of Schedule"A" Section XIV, unless mentioned otherwise in the description of the items of this schedule i.e. Schedule- XVI .
SCH "A " SECTION - XV SCHEDULE OF CREDIT
M/S GIRDHARI LAL CONSTRUCTIONS PVT. LTD.
Kamladityya Construction Private Limited
COMT CONSTRUCTIONS PVT LTD
IRON TRIANGLE LIMITED
RDS PROJECT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.08 MB
Download all tender documents and submit your bid