Loading…
Loading…
Tender Value
₹61.7 L
EMD Value
₹62,000
Closing Date
15 May 2026, 6:00 pmClosed
The Superintending Engineer, Project Implementation Unit
Providing & Erecting Grid Connected Solar Roof Top System at Various Sub center building in Ta.:- Bharuch, Ankleshwar,Hansot, Amod, Jambusar, Vagra, Jhagadiya, Netrang & Valia., Dist :- Bharuch. [Re-Invite 150/16]
303162
01/05 OF 2026/2027
Open
Solar Power Plants-Goods
Gandhinagar
10 documents required · 10 mandatory
₹2,400
PIU-General Fund A/c 11-114
₹62,000
8 May 2026
8 May 2026
8 May 2026
15 May 2026
8 May 2026
Name of Work : - Providing & Erecting Grid Connected Solar Roof Top System at Various Sub center building in Ta.:- Bharuch, Ankleshwar,Hansot, Amod,
Jambusar, Vagra, Jhagadiya, Netrang & Valia., Dist :- Bharuch.
Memorandum showing items of works to be carried out
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied
Solar Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy
Frame With Twin Wall Profile, Front Cover : High Transmission Low-Iron
Tempered Glass (AR Coated), High efficency and positive power tolerance
Pmax: 0/+5, Module Efficiency should be approx. 19.5%-22%, Normal
operating temperature 45'C, Junction Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass diodes, 100% Electroluminescence
test to ensure error free Modules, Thep. temp. co-efficient of the PV module
shall equal or better than -0.45%/degree C. Solar PV modules of minimum
fill factor 75% to be used. Unit Production:- More than 4.5 Unit /kw /day
(Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear
Power Warranty includes all mechanical and electrical parameters of the
Solar panel. Modules must be complied to the DCR(Domestic content
requirements). The Ration of AC to DC is 5:6 for the Installation capacity
1 which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency:
97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m) ≤4000, O/p
Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -
25~60°C, Integrated protection of Inverter are Anti-islanding Protection,
Input Reverse Polarity Protection, Insulation Resistor Detection, Ground
fault protection, Residual Current Monitoring Unit, Output Over Current
Protection, Output Short Circuit Protection, Output Over Voltage Protection,
PV array string fault Protection. Protection Degree: IP65, User Interface
LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor
Detection Integrated, Residual Current Monitoring Unit Integrated, Output
Over Current Protection Integrated, Output Short Circuit Protection
Integrated, Output Over Voltage Protection Integrated, Protection Degree:
IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-
Fi, Module Mounting Structure: The mounting (Rectangular pipe / square
pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be
Hot deep galvanized with minimum 80micron coating. The Rectangular /
square /circular hollow pipe section used for the structure should have a
minimum thickness of 2.0 mm. other than above, the material thickness
should be minimum 2.5 mm. A certificate of a structural engineer certifying
the strength and stability of the mounting structure to withstand the weight
and wind speed of 150 km/hour throughout the life span of 25 years of the
system, shall be submitted by the vendors. Hot Dipped Galvanized steel
coils. suitable arrangement for base plate for foundation , solar panel
mounting, the structure should be suitable for carry the load of solar
panel,wiring, sprinkler system etc. with necessary foundation work/wall
mount, j bolt, anchor fastner etc. the nut bolt used for installtion of stucture
should be (SS 304) quality.The ground clearance of the bottom most edge
of solar panel shall not be less than 300 mm to 1200 mm or as per site’s
technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM
Balane of System with necessary Swichgears (Suitabel size and protection
of ACDB & DCDB), inter connecting wiring, earthing system as per the
CEIG drawing approval, lightining arrester system as per the CEIG drawing
approval, all liasoning work with various gov. dipartment like state nodal
agency,DISCOM & CEIG is included in agency scope (Excluding All
charges namely GEDA Application fees, Solar connectivity Charges, Meter
connectivity Charges, Meter testing Charges and system
stability/strenthning charges.) (A) Grid Tied Solar Power System: 1 -
kW (Single phase)
As per location 5.31 kw x 23 nos. sub center = 122.13 kw
Rupees Forty Six
As per Attached measurement sheet.]
Thousand Six Hundred
Make Approved by Engineer In-charge Per Forty Eight And Paise
122.13 KW 46648.87 Eighty Seven Only
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Item Discripton Qty Unit Rate in Rs. Into Words Total amount
Providing & erecting Automatic solar panel cleaning system for solar power
projects which includes necessary plumbing work (UPVC pipes and
accessories) from source of water to project site (upto 30 meters),Suitable
Rupees Three Thousand
size of sub mercible/ open well motor, necessary wiring for motor and Per
2 122.13 3852.14 Eight Hundred Fifty Two
sprinkler system with safety, timer circuit for automatically on/off the KW
And Paise Fourteen Only
sprinkler system, necessary size oand number of nozzles/JET (minimum
Nozzle/Jet per module).(B) 5KW-10KW Cleaning System
Total Amount Rs.
Total Amount Rs.
Words Rupees Sixty One Lakh(s) Sixty Seven Thousand Six Hundred Eighty Eight Only
I / We am / are willing to carryout the all or any items of this work. at________________% below /above + / - _______________________% (should be
Note. All work shall be carried out as per specification attached and relevant I.S. standards
1 or as directed.
All the columns in schedule should be filled in by ball pan or ink and the total of the
entries in the last column should be stated by the contractor under his signature.
Rates quoted include clearance of site (Prior to commencement of work and at its closure) in all respects and held good for the work under all conditions, site, moisture, weather etc.
To be continued on additional sheets, if found necessary.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.SBD Book Solar.pdf
8.1. Schedule Solar Roof Top bharuch 23 SC.pdf
10. Revised Eligibility Criteria for solar work.pdf
6372 Make List_compressed_compressed (1).pdf
Measurement Sheet.pdf
Roof Top System-Tech Spec New.pdf
Standard Specification for Electrical Work (1) (1).pdf
TENDER NOTICE NO - 01 (2026-27).pdf
Download all tender documents and submit your bid