| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | ₹2.2 L | L1 | Accepted-Finance L1 admitted |
| 2 | L2₹2.5 L+₹25,146.79 (11.2%)Accepted-Finance RIYAS MANZIL VELICHIKALA PO KOLLAM | ₹2.5 L+₹25,146.79 (11.2%) | L2 | Accepted-Finance L2.Kept in abeyance till the execution of agreement by the first bidder |
| 3 | L3₹2.5 L+₹28,085.87 (12.5%)Accepted-Finance | ₹2.5 L+₹28,085.87 (12.5%) | L3 | Accepted-Finance L3.Kept in abeyance till the execution of agreement by the first bidder |
| 4 | L4₹2.5 L+₹28,787.84 (12.8%)Accepted-Finance GOPIKA BHAVAN MARUTHAMONPPALLY POOYAPPALLY P O | THIRUVANANTHAPURAM | KERALA | 695001 | ₹2.5 L+₹28,787.84 (12.8%) | L4 | Accepted-Finance L4.Kept in abeyance till the execution of agreement by the first bidder |
| 5 | L5₹2.5 L+₹29,385.55 (13.1%)Accepted-Finance KUMARAKOM VAIKOM | ₹2.5 L+₹29,385.55 (13.1%) | L5 | Accepted-Finance L5.Kept in abeyance till the execution of agreement by the first bidder |
| Sl No | Description | Qty | Unit | RENJITH G L4 | RAJEEVKUMAR S L3 | RIYAS H L2 | VISHNU L5 | HEMACHANDRAN NAIR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX 1-Rectification of Flume and canal lining | ||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 30 | sqm | 9 ₹270 | 9 ₹270 | 8 ₹240 Lowest | 9.27 ₹278.1 | 11.64 ₹349.2 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 28.96 | cum | 257 ₹7,442.72 | 255 ₹7,384.8 Lowest | 255 ₹7,384.8 Lowest | 257.63 ₹7,460.96 | 332.11 ₹9,617.91 |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 199.51 | sqm | 56 ₹11,172.84 | 51 ₹10,175.27 | 49 ₹9,776.24 Lowest | 56.51 ₹11,274.59 | 58.6 ₹11,691.58 |
| 1.00 | OD5129/2025-2026:Providing and laying in position cement concrete 1:2:4 using 6mm chips including cost of materials, labour, chipping ,cleaning the surface etc. complete as per the direction of departmental officers at site | 1.2 | cum | 9,213 ₹11,037.17 | 9,250 ₹11,081.5 | 9,200 ₹11,021.6 Lowest | 9,213.31 ₹11,037.55 | 9,200 ₹11,021.6 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.83 | cum | 9,235 ₹35,323.88 | 9,230 ₹35,304.75 | 9,230 ₹35,304.75 | 9,235.97 ₹35,327.59 | 8,460 ₹32,359.5 Lowest |
| 1.01 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 490.03 | sqm | 384.33 ₹1,88,333.23 | 385 ₹1,88,661.55 | 380 ₹1,86,211.4 | 385.28 ₹1,88,798.76 | 329 ₹1,61,219.87 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,354
Closing Date
20 Jul 2026, 3:00 pmClosed
Assistant Executive Engineer
OFFICE OF ASSISTANT EXECUTIVE ENGINEER KIP LB Subdivision No 19 Kottiyam
GENERAL Rectification Works KIP LB Rectification of Flume and Open Canal of Mukhathala Distributory between Ch 80 m and 200 m General Civil Work
2026_Irrig_860242_1
IRR/PII/TR/2803/2025_5_3_2/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Kannanalloor
Please refer tender documents
7 documents required · 7 mandatory
₹560
₹6,354
Yes
17 Sept 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX 1-Rectification of Flume and canal lining | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1 | sqm | - | - |
| 1.004 | OD5129/2025-2026:Providing and laying in position cement concrete 1:2:4 using 6mm chips including cost of materials, labour, chipping ,cleaning the surface etc. complete as per the direction of departmental officers at site | 1 | cum | - | - |
| 1.005 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1454706.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1454706.xls
BOQ • 0.30 MB
AffidavitForm.pdf
Additional Documents • 0.26 MB
SBDNIT.pdf
Tender Documents • 2.80 MB
EPAYMENTFORM.pdf
Additional Documents • 0.01 MB
FormofTender.pdf
Additional Documents • 0.02 MB
IntegrityPact.pdf
Additional Documents • 0.01 MB
PreliminaryAgreement.pdf
Additional Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .