| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technical specification found not ok |
Tender Value
Refer Docs
Closing Date
1 Nov 2023, 3:00 pmClosed
SE EDC BHADOHI
SE EDC BHADOHI
Construction 11 kv Line and Installaion of Distribution Transformer and LT line Shifting in various places under Deposit scheme 2023-24 in jurisdiction of EDD I bhadohi
2023_PVVNV_843136_2
58/EDC(BH)/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
BHADOHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD I BHADOHI
4 Nov 2023
17 Oct 2023
2 Nov 2023
17 Oct 2023
1 Nov 2023
17 Oct 2023
Construction of 11 kv Line with intallation of T/F And LT Line shifting in the juridiction of EE EDD I Bhadohi under Deposit Scheme.
Carriage of 8.5 mtr PCC Pole From Store to site (according to estimate) with lodding and unloding.
Errection of 8.5 mtr PCC Pole with all fitting as per respo according to estimate as per respo.
Carriage of ACSR Weasol Conductor from Store to site (according to estimate) with lodding and unloding and laying/sagging with all fitting as per respo.
Carriage of 10 kva T/f from store to site (according to Estimate) with lodding and unloding and Installation of 10 kva T/F connecting with 11 kv line and energasation with all fitting as per respo.
Carriage of 100 kva T/f from store to site (according to Estimate) with lodding and unloding and Installation of 100 kva T/F connecting with 11 kv line and energasation with all fitting as per respo.
Receive Back 10 kva T/F from Site to Store as per Estimate.
Some Centralised Materials carriage from Store to Site(according to estimate) with lodding and unlodding and Errection with all fitting where required as per Estimate. 1 No of 11 kv V Type cross arm, 12 No of 11 kv pin insulator with pin, 06 no. of 11 kv disk insulator with fitting, 02 No of T off channel with clamp, 02 No of Top channel, 3 No of Earthign rod, 2 No of Dropper channel, 4 No of S/S base, 9 no of stay rod complete, 1 No of Distribution box.
Concreting of Pole with all fitting as per respo
Concreting of Stay with all fitting as per respo
Decentralised materials which is provided by the contractor and Errection with all fitting where required as per Estimate. Claimp for Distribution box 02 Nos. Dead & Clamp 02 Nos. LT shacle insulator 20 Nos. LT CLAMP with Nut & Bolt 20 No F Breacket with Nut & Bolt 1 Nos. Claimp for channel 22 Nos. Cross arm clamp with nut&bolt 1 Nos.
M/S HARI OM ASSOCIATE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .