| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 CrAdmitted-Finance | ₹36.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹37.1 Cr+₹1.1 Cr (2.99%)Admitted-Finance | ₹37.1 Cr+₹1.1 Cr (2.99%) | L2 | Admitted-Finance |
| 3 | L3₹37.2 Cr+₹1.2 Cr (3.27%)Admitted-Finance HO PLOT NO 11 1ST FLOOR LSC SECTOR B 1 VASANT KUNJ NEW DELHI 110070 | NEW DELHI | DELHI | 110070 | ₹37.2 Cr+₹1.2 Cr (3.27%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANNU PROJECTS LIMITED L3 | SAMEER ALI CT L2 | Radikale Engineering Pvt. Ltd L1 |
|---|---|---|---|---|---|---|
| 1.00Design, Construction, Testing and Commissioning of Sewage Network including sewer network, Manholes and Pumping Mains | ||||||
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 2,400 | sqm | 125 ₹3,00,000 Lowest | 136 ₹3,26,400 | 139 ₹3,33,600 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 6.6 | cum | 3,448 ₹22,756.8 Lowest | 3,672 ₹24,235.2 | 3,723 ₹24,571.8 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 57 | cum | 2,305 ₹1,31,385 Lowest | 2,517 ₹1,43,469 | 2,552 ₹1,45,464 |
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 7,762.26 | sqm | 405 ₹31,43,713.68 Lowest | 444 ₹34,46,441.66 | 450 ₹34,93,015.2 |
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 20,068.64 | metre | 26 ₹5,21,784.59 Lowest | 27 ₹5,41,853.23 | 28 ₹5,61,921.86 |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 54 | cum | 2,354 ₹1,27,116 Lowest | 2,542 ₹1,37,268 | 2,578 ₹1,39,212 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10,026.34 | cum | 256 ₹25,66,744.06 Lowest | 258 ₹25,86,796.75 | 262 ₹26,26,902.13 |
| 1.01 | OD286711/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 2nd depth | 2,287.64 | cum | 358 ₹8,18,976.91 Lowest | 389 ₹8,89,893.91 | 395 ₹9,03,619.78 |
| 1.01 | OD286708/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 3 rd depth | 849.41 | cum | 468 ₹3,97,522.94 Lowest | 520 ₹4,41,692.16 | 527 ₹4,47,638.02 |
Tender Value
₹35.4 Cr
EMD Value
₹5 L
Closing Date
3 Aug 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Project Planning Design and Implementation Unit Sewerage Circle Kerala Water Authority Kochi 11
AMRUT 2 Kochi Corporation Providing underground sewerage networks and allied works in the erstwhile Division 54 of Kochi Corporation for the newly proposed 5MLD STP at Elamkulam
2026_KWA_860229_1
RE - 04/2026-27/SE/PPD/KCH
Open Tender
Civil Works - Water Works
Item Rate
548 days
Elamkulam
Please refer Tender documents.
9 documents required · 9 mandatory
₹19,518
₹5 L
PPDIU and Sewerage Circle Kochi KWA
2 Sept 2026
13 Jul 2026
4 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026 - 20 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design, Construction, Testing and Commissioning of Sewage Network including sewer network, Manholes and Pumping Mains | |||||
| 1.001 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | sqm | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.003 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.004 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 0.4 | sqm | - | - |
| 1.005 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 0.2 | metre | - | - |
| 1.006 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 1.007 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.008 | OD286711/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 2nd depth | 1 | cum | - | - |
| 1.009 | OD286708/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - 3 rd depth | 0.2 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.53 MB
NITVol1.pdf
Tender Documents • 1.55 MB
NITVol2.pdf
Tender Documents • 10.15 MB
BOQ_1454677.xls
BOQ • 0.46 MB
AdditionalPGandLowquotedorderDLP.pdf
Other Document • 4.33 MB
Corrigendum1.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .