CHIEF ENGINEER (G)
Repairing & Renovation of Boiler lifts of Unit 3, 4 & 5 from 0.00 mtr. to 58.00 mtr. at GTPS
363512
EW-371
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹2,950
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹1.4 L
11 Nov 2026
11 Nov 2026
11 Nov 2026
1 Dec 2026
11 Nov 2026
Safe Maintenance Procedure
EW-371 PUR-F-006 RFQ-79155
ACKNOWLEDGEMENT OF TENDER FEE
TENDER NOTICE
EW-371 PUR-F-006 RFQ-79155
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
e- Tender for the
-“Repairing & Renovation of Boiler lifts of Unit # 3, 4 &
5 from 0.00 mtr. to 58.00 mtr. at GTPS.
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________
1. The undersigned reserves the right to reject any or all tenders without
assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money
Deposit will be accepted in form of Demand Draft or Bank Guarantee of any
bank as prescribe in ANNEXURE- I drawn in favour of “GUJARAT STATE
ELECTRICITY CORPORATION LTD.” payable at Gandhinagar TPS
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Tender Notice No: GSECL/___/ __/ For Civil works
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of -
“Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from 0.00 mtr. to
58.00 mtr. at GTPS..
Tender Papers & Specifications may be down loaded from Web site
https://gsecl.nprocure.com(For view, down load and on line submission) and GUVNL /
GSECL web sites www.gsecl.in (For view only).All tender documents are to be upload (Notarized
/ self-attested copies of original – as specified in tender document) through online only
(mandatory) on (n) procure portal excluding Tender fee and EMD Tender fee and EMD are to be
submitted physically by Registered Post A.D. or Speed Post addressed to: CHIEF ENGINEER
(GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL POWER
STATION, GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE OR HAND DELIVERY”
will be accepted.
Tende Time E.M.D.
Name of Work Estimated Fee Rs.+
r No. Limit Rs.
amount Rs. G.S.T 18%
EW- “Repairing & Rs. 48,00,581.97
371 Renovation of (In words: - (Eleven) Rs. 2500+ 450 Rs.
Boiler lifts of Fourty Eight lakhs Months (18% GST) =
Unit # 3, 4 & 5 Five hundred from the Rs. 2950/- (Rupees One
from 0.00 mtr. Eighty One and (Rupees Two Lakh Forty
Ninety Seven written Thousand Nine Four Thousand
to 58.00 mtr. order to Hundred Fifty Eighteen)
At GTPS. commence (Non Refundable)
180 Days [From the opening of
1 Validity of Tender
Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank
Guarantee / Online payment reference for Tender Fee and
3 As per Tender Notice
EMD only up to 15:00 Hrs Through RPAD or Speed Post
Date of opening of online Technical Bid, all relevant
documents submitted through online process, Cover for
4 Tender fee and EMD at 15:30 Hrs (Online technical bid As per Tender Notice
will be opened for Bidders who have submitted Cover for
Tender Fee and EMD)
Tentative date of on-line opening of price bid (if possible) Party has to be in touch with
at 15.30 hrs. website www.nprocure.com and
also with e-mail sent by above
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
1) Only following listed documents must be upload in n-process online only. No physical documents
are to be submitted except tender fee and EMD cover. Price Bid shall not be submitted in Hard
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through RPAD/Speed post
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of company. The
bidder, who does not possess such separate P.F. code, shall not be considered for acceptance of
tender. The contractor has to submit attested copy of such certificate showing P.F. code along with
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. Details of equipment, tools and plants immediately available with the tenderer for use of this work.
10. Details of technical personnel.
11. Undertaking duly Notarized as per attached Declaration Form
12. Any other documents required to verify technical, financial capability of the bidders & other
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender Fee and EMD
details cover. Otherwise the offer will not be considered and no any further communication in the
matter will be entertained.
2) In case any deviation is found in Data / Details / Documents uploaded on N-procure online offer
(e-tendering) documents then such tender will not be considered and no any further
communication in the matter will be entertained. Tenders must be un-conditional. Conditional
Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid i.e. Schedule-B
on line only and not to submit the Technical bid and price bid in physical form expect Tender Fee
and EMD details cover. This is mandatory. If Technical bid document and price bid is submitted in
physical form expect Tender Fee and EMD details cover, same will not be opened and only on-line
Uploaded/submitted Technical bid document and price will be considered for evaluation. The
bidder is requested not to upload/submit the by online (n)procure while bid submission on in
(n)procure tender document, condition of the contract, specification & other relevant
documents, except documents as stated here above. Instead of the same, the bidder shall
upload on (n) procure scan copy of the duly Notarized Undertaking as stated below declaration
form on the stamp paper of Rs. 300/-. However, bidder may download tender document &
preserve with them in Hard Copy for their future reference. Later on, L1 bidder shall be
asked to collect the tender documents from the tender inviting authorities for the purpose
of contract agreement execution and place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) and
uploading on (n) procure in scheduled time. Tender documents submitted in physical form will not
be accepted and considered expect Tender Fee and EMD details cover. Also, all bidders shall
submit required Physical documents as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of containing the
Tender Fee and EMD.
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an Officer
nominated by the Purchaser in the presence of such of the bidders who wish to be present. Any
technical questions, information and clarifications that may be required pertaining to this tender
should be referred to the CHIEF ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid meeting
(if arranged) the same may please be discussed
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the
product which they are manufacturing / service which they are providing and have
Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the
Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
Commission(K.V.I.C)or Commissioner of Cottage Industries.
EW-371 PUR-F-006 RFQ-79155
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds, dumb and
deaf, disabled, mentally disabled persons;(ii)women's self-help group recognized by
Gujarat Livelihood Promotion Company; which participate directly in tendering process
for the product which they are manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering process as
Manufacturers or Service Providers, and holds a valid Udyam Registration, are eligible
for exemption from payment of Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar
categories (i.e. other than Manufacturers/Service Providers) are not eligible for EMD
3. Migration period for Reclassification of MSMEs: - ln case of an upward change in terms
of investment in plant and machinery or equipment or turnover or both, and
consequent re-classification, an enterprise shall continue to avail of all non-tax benefits
of the category (micro or small or medium) it was in before the re-classification, for a
period of three years from the date of such upward change.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
DECLARATION FORM CUM UNDER TAKING
TO BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW-371 PUR-F-006 RFQ-79155
(To be uploaded on (n) procure online process duly notarized on Rs. 300/- Non
– Judicial Stamp Paper)
DECLARATION FORM
Name of Work: “Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from 0.00 mtr.
to 58.00 mtr. at GTPS.
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed
on the WEB site and conditions of contract, specifications and other documents
of this work mentioned in the tender and abide by the same. Also, I/We hereby
agree to execute the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies
of the conditions of contract, specifications and other documents of this work of
otherwise I/we will get copy of the same from the office of the tender inviting
authority and the same will be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be
entertained by the tender inviting authority.
4. I/We hereby declare that I/We have visited the work site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other
factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical
& commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the
terms-conditions and provision of the Tender and Contract for Works as
applicable and default thereof, to forfeit and to pay to the Gujarat State
Electricity Corporation Limited the sums of money due.
EW-371 PUR-F-006 RFQ-79155
7. The full value of the “Earnest Money Deposit” paid herewith should be
absolutely forfeited to the Corporation, should I/ we do not execute / commence
the work after issuance of date of commencement by GSECL.
8. If, I fail to submit all required documents with application or tender copy ( in
each tender ) then my tender will be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same
terms, rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do
hereby also declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-
Contractor of M/s. ______ ) worked as contractor at GSECL,
___________Thermal Power Station for the nature of work of ______ against work
Order No. ______ Dt. ______., I have complied with the provisions of all laws as
applicable. I have paid the wages for the month/s of my contractual period
which is / are not less than the minimum rates as applicable, to all my
employee/s and no other dues are payable to my employee/s.
b) That I have covered all the eligible employee/s under the Employees’
Provident Funds and Miscellaneous Provisions Act, 1952 and deposited the
contributions under my PF Code No. ______, place: ______ for the month/s of
my contractual period and as such no amount towards contribution whatever
c) I further declare and undertake that in case any liability pertaining to
any of my worker, labour, employee/s is/are to be discharged by the principle
employer i.e. Gujarat State Electricity corporation Limited, ___________Thermal
Power Station due to my lapse, I undertake to reimburse the same or the
principle employer is authorized to deduct the same from my dues as payable.
d) I further declare and undertake the legal consequences which may arise
in future under the said work order awarded, and I bond myself to resolve the
same at the risk and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
their proprietor / any partner / any directors of the firm is not stop deal and /
or banned for business dealing and / or black listed by GUVNL and / or their
any subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL /
PGVCL as well as Government and / or Semi Government company /
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company’s Seal
EW-371 PUR-F-006 RFQ-79155
e- Tender for the work of “Repairing & Renovation of Boiler lifts of Unit # 3, 4 &
from 0.00 mtr. to 58.00 mtr. at GTPS.
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW-371 PUR-F-006 RFQ-79155
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY CORPORATION
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated at a
distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of daily :- 350 C
Max. Temperature (
2] Maximum dry bulb :- 450 C
Temperature ( In 0C)
3] Minimum dry bulb :- 8.60 C
Temperature ( In 0C)
1] Average annual rainfall (In :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity (In :-
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In %) :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Ambient temperature :-
Other Data :-
EW-371 PUR-F-006 RFQ-79155
SCOPE OF WORK AND SITE CONDITIONS
The main scope of the work is “Repairing & Renovation of Boiler lifts of Unit # 3, 4 &
5 from 0.00 mtr. to 58.00 mtr. at GTPS.
The item work shall be carried out as per item specification and as directed by E.I.C.
includes all required materials, tools, tackles, and required safety precautions for
success completion of work.
Under the scope of this tender the agency has to carry out the subject work as per all
items of Schedule B and as per detail technical specification items. The quantities
taken under individual items are very tentative. However the agency has to carry out
the works as and when required & as per the Company’s requirements.
The agency has to carry out the works as per the priority & schedule given by EIC
time to time even in on or off working hours of the office. The agency will take
complete care and will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security
norms, with all risks including scaffolding, strutting, shoring, etc up to any height
irrespective of quantum of the work.
Contractor has to make arrangement for workable site condition with the co
operation of departments of company and agencies, all necessary arrangement to get
work permit is to be made by contractor. Day to day cleaning is required after
completion of job. The removed materials and any other unwanted materials are to be
transported and taken away as instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The scope of work to be carried out by the Contractor shall also include Clearance of
the site, Disposal of debris etc as directed by EIC to complete the work.
The major works involvement generally mentioned as per schedule-B.
The scope of work to be carried out by the Contractor shall also include Clearance of
the sump, Disposal of debris etc,
The major works involvement generally mentioned as here under---
Dismentalling of sheet roofing including ridges,..
Providing and fixing colour coated 0.5 mm (TCT) thick Galvalume sheet…
Prov ridges or hips 600 mm overall in plain G.I sheet class - 3 fixed with G.I J or L
Steel work welded in built up sections framed work including cutting, hoisting,…
Painting two coats (excluding primer coat) on new steel and…
Demolition of Brick work and Stone masonry including stacking of servicable
Brick work using common burnt clay building bricks having crushing strength…
Providing 15mm thick cement plaster in single coat on Rough (similar) side of
Providing cement vata (10cm X 10cm size) quarter roind…
EW-371 PUR-F-006 RFQ-79155
Erection of Temporary Approach scaffolding from available Firm platform/Ground…
Removing dry or oil bound distemper by a washing and scraping and sand
Dismentling doors, windows, ventilators etc. (wood or steel)shutters…
Providing and applying two coat of Acrylic Wall Putty up to required thickness…
Providing and applying one coat of water based cement interior primer…
Providing and applying two coats of washable interior emulsion paint…
Providing and fixing PVC Printed pain colour false ceiling with grid type…
Providing and fixing window having extruded aluminum Colour anodized section
Any item of R & B / GSECL(GEB) SOR …
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com. For
registration following documents are required and mail to [email protected]
and [email protected]. After registration vendor have to upload the invoice in
the VMS system for smooth functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
EW-371 PUR-F-006 RFQ-79155
SPECIAL NOTE FOR PRE-QUALIFICATION
Name of work: “Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from
mtr. to 58.00 mtr. at GTPS.
The tender documents are of two separate bids i.e. technical and price bids. Bidder is requested to
submit the technical bid with the following credentials for post-qualification.
1. Bidder should produce evidence of having experience of successfully completed of similar
works as defined hereunder, carried out in Central & State Government / Semi-Government
/ GSECL / GETCO / DGVCL / MGVCL / UGVCL/PGVCL during the last seven years ending
last day of the month previous to the one in which tender is invited. Bidder should submit
self-attested copies of documentary evidence, preferably photo copies of work completion
certificate, certificate regarding works on hand progressing satisfactorily along with
certificate of amount of work done, work order with Schedule-B, etc. from the respective
department. The amount of work completed should be either of the following:-
a. Three similar completed works each costing not less than the amount equal to
b. Two similar completed works each costing not less than the amount equal to
c. One similar completed works each costing not less than the amount equal to
Similar work means: General Civil construction / maintenance works/ Fabrication work.
2. Contractor has to submit satisfactory work completion certificate of the client. Experience
certificate of work executed with private firm shall not be accepted. Experience as a
joint venture or sub-contractor is not allowed and price bid of such bidders will be
3. Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less than Rs. 14.40 Lakh during the
preceding three (3) financial years as one date of Techno-Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up share capital as on the
last day of the preceding financial year. In case the Bidder meets the requirement of Net worth
based on the strength of its Subsidiary (ies) and/or Holding company and/or Subsidiaries of its
Holding Companies wherever applicable, the Net worth of the Bidder and its Subsidiary (ies)
and/or Holding company and/or Subsidiary (ies) of the Holding Company, in combined manner
should not be less than 100% of their total paid up share capital. However individually, their
Net worth should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are individual net worth
which shall not be less than 75 % of the respective paid up share capitals and y1, y2, y3 are
individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements on stand-alone entity
basis, the unaudited unconsolidated financial statements of the bidder can be considered
acceptable provided the bidder further furnishes the following documents for substantiation of
its qualification.
Copies of the unaudited unconsolidated financial statements of the bidder along with
copies of the Audited consolidated financial statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that the unaudited
unconsolidated financial statements form part of the Consolidated Annual Report of the
EW-371 PUR-F-006 RFQ-79155
4) In cases where audited results for the last preceding financial year as on the date of techno-
commercial bid opening are not available, the financial results certified by a practicing
Chartered Accountant shall be considered acceptable. In case, Bidder is not able to submit the
Certificate from practicing Chartered Accountant certifying its financial parameters, the audited
results of three consecutive financial years preceding the last financial year shall be considered
for evaluating the financial parameters. Further, a Certificate would be required from the
CEO/CFO, stating that the Financial results of the Company are under audit as on the date of
Techno-commercial bid opening and the Certificate from the practicing Chartered Accountant
certifying the financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth Certificate in support of
Financial QR, duly certified and verified for authenticity from Independent Statutory Auditor of
their company / Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party Inspection
Agency ) empaneled approved by GSECL, along with copy of Annual Audited Accounts of last
Note for point No.1, 2, 3&4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning ascribed to them as
per Companies Act of India, in vogue.
Net worth means the sum total of the paid up share capital and free reserves. Free reserve means all
reserves credited out of the profits and share premium account but does not include reserves credited
out of the revaluation of the assets, write back of depreciation provision and amalgamation. Further,
any debit balance of Profit and Loss account and miscellaneous expenses to the extent not adjusted or
written off, if any, shall be reduced from reserves and surplus.
4. To pay EMD in form of DD OR in form of B.G. given by bank as described in the Annexure – I.
All the bidders will be required to pay Tender Fees plus 18% GST and EMD as mentioned in the
Tender Document either in Demand Draft, Pay Order or Bank Guarantee (only for EMD) in favour of
Gujarat State Electricity Corporation Limited payable at Gandhinagar, Gujarat. The scanned copy
of original document shall have to be uploaded online with the bid and RPAD or Speed Post only
addressed to The Chief Engineer (G), Gujarat State Electricity Corporation Limited, Thermal
Power Station, Gandhinagar-382041.
5. Tender Fee: The tender fee shall be accompanied in the form of DD.
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the product
which they are manufacturing / service which they are providing and have Udyam registration
for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up
India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the tender,
from Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or
Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured
5. State Government recognized organizations like(i) organizations for blinds, dumb and deaf,
disabled, mentally disabled persons;(ii)women's self-help group recognized by Gujarat
Livelihood Promotion Company; which participate directly in tendering process for the product
which they are manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering process as
Manufacturers or Service Providers, and holds a valid Udyam Registration, are eligible
for exemption from payment of Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar
categories (i.e. other than Manufacturers/Service Providers) are not eligible for EMD
3. Migration period for Reclassification of MSMEs: - ln case of an upward change in terms
of investment in plant and machinery or equipment or turnover or both, and
EW-371 PUR-F-006 RFQ-79155
consequent re-classification, an enterprise shall continue to avail of all non-tax benefits
of the category (micro or small or medium) it was in before the re-classification, for a
period of three years from the date of such upward change.
Vendor Registration with GSECL is not compulsory for submitting this tender.
(1) If any Bank Guarantee submitted against EMD/security deposit/PBG, same should be valid
one year from the date of expiry of BG. Bank Guarantee should be confirmed through
Structured Financial Messaging system (SFMS). SFMS allows intra/interbank message transfer
system of banking. Our bank details are as under.
ACCOUNT NAME GSECL
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
5. The Last three-year Audited Annual Accounts, Positive Net worth certificate, and Average Annual
Turnover certificate certified by charted accountant as Per Qualification Requirement.
6. Separate employee’s provident fund code number towards registration of firm with
Regional P.F. Commissioner.
7. Attested copy of relevant document duly signed and sealed on each and every page shall be
8. Declaration form in original duly notarized on stamp paper of Rs. 300/- (As referred in Tender
9. Attach copy of GST Registration.
10. Bidder shall have to submit the PAN card No for Income Tax with documentary proof.
11. Details of the partnership deed.
12. Details of Tools, tackles, equipment and personals available with firm relevant to the job/subject
13. Copy of the updated valid labor contract license from the appropriate authorities and updated
workman group insurance policy covering labor engaged.
14. The tenderer shall have to produce the document of last three years annual account, i.e. profit &
loss account and balance sheet, if the estimated cost of tender is more than 50 lakhs along with
15. Details of skilled/semi-skilled persons presently employed by the contractor having sufficient
knowledge of similar jobs.
16. TPI should be mandatory to submit as per cl no.5 of Section B (i.e General
Instruction to the bidders).
The above documents will be analyzed and after satisfaction, the price bid will be opened. GSECL
may verify the documents, experience certificates from authority who have issued such certificates
On opening of Technical Bid, if any required attested documents are missing in technical bid
submitted by the bidder, and tender inviting authority is in the opinion that in absence of these
documents sufficient competition is not possible, in that case to have fair competition, the tender
inviting authority may inform only once by Registered post to bidder/bidders to submit the
missing required documents within stipulated time limit and failing which bidder/bidders
will be declared technically disqualified for not submitting the required documents along
with technical bids without any further notice. However, document will be considered valid only
if it is for the period of last day of month previous to the one in which tenders are invited.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents as
prescribed in tender notice along with tender fee & EMD. Bidder shall have submit Tender
Fee and EMD cover only, All other require document to be upload on online (n)procure
Note: - If attested copies of qualifying documents stated as prescribed in tender notice
are not found in on-line Technical bid, but same should be submitted by mail during
scrutiny will be treated as final to consider the bid for pre-qualification. Any missing
documents, if required will be asked from the bidder as mentioned in this tender
elsewhere. If party has not submitted tender in online is liable to be ignored.
“Please note that the Notarized / self-attested copies of original required documents
should be invariably uploaded in n-procure portal before due date and time in pdf form
(Scanned copy). This is mandatory. No physical documents are required to be
submitted except tender fee and EMD.
The price bid shall have to be submitted online only. The percentage rates and price shall be
written both in words, and figures and the units in words. In case of any ambiguity or
mistakes, the unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and
lifts, Supervision, setting out works, Machinery and equipment with its mobilization /
demobilization, transportation charges, Clearing of the site both prior to commencement and
after completion of work. Consumables such as, but not limited to petrol, oil, diesel,
lubricants, drill bits, pipes, ropes etc. Construction facilities such as scaffolding, tarpaulins,
wind break, etc., Overheads / profits of Contractor for due performance of the work under
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable
unless otherwise mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must be
clearly specified with valid declaration and certificate from department. In the event of
withdrawal/ cessation of the supplier from composition scheme during the tenure of the
contract, the rate(i. e. price) mentioned in the price bid shall be final and any additional GST
will have to be borne by the tenderer himself, In no case additional amount towards GST or
otherwise will be paid/reimbursed to supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the bidder
intends to supply the goods/services, meaning there by the bidder has to supply the
goods/services from the relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately
indicate the GST rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO. (copy
of PAN to be enclosed) Tenders submitted without GSTIN No by the firms, the offer will be
rejected without entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer,
GSECL, GTPS. But it must be clearly noted that the tenders must be received complete in
every respect by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any
discrepancy, whatever written in words shall prevail.
EW-371 PUR-F-006 RFQ-79155
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be
entertained. Any ignorance for this shall not relieve the contractor from his contractual
liability arising as per tender documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/
raw materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to.
The work is to be completed in time limit from the date of issue of written order to
commence the work by the Chief Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender and
if withdrawn, the Earnest Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by “Tender
and contract for Works” booklet appended herewith except where conditions specified in
this specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per G.S.E.C.L
rules on a stamp paper of Rs.300/- and necessary stamp duty charge shall be borne by the
contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and scope
of work, Tender and contract for Works booklet, General Conditions, Instructions to bidder
& Technical specifications. All these sections are complimentary to each other. The
particulars and requirements contained herein shall cover the execution of the works
covered under these specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions regarding
availability of approach road during all seasons and other matters affecting the above works
before submitting the tender.
x. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the work
to be done and of conditions and local conditions and other factors bearings on the
execution of the works. GSECL will not therefore after acceptance of contractor's rate pay
any extra charge for any other reason; in case the contractor is found later on to have
misjudged the site condition.
xi. GSECL’s authorized officers who accepts tender, shall have the right of rejecting all or any
of the tenders and will not be bound to accept the lowest offer nor to assign any reason
whatsoever for the rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the owner.
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent
Practices issued by the Govt., the list of black listed Contractors announced by GSECL
(erstwhile GEB) Govt. of Gujarat or its Public Sector undertakings or the contractors who
are under stop dealing in GUVNL and /or their any subsidiary company viz.
GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed
with the name of Firm / company which will be legally binding on all partners / parties.
xv.If the application is made by an individual, it shall be signed by the individual above his
full typed written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor above
his full typed written name and the full name of his firm with its current address.
xvii.If the application is made by a partnership firm, it shall be signed by all the partners of
the firm above their full type written names and current addresses or alternatively by
partner holding power of attorney for the firm in which case a certified copy of the power
of attorney shall accompany the application. A certified copy of the partnership deed, full
names and current addresses of all the partners of the firm shall also accompany the
xviii. If the application is made by a limited company or a Corporation, it shall be signed by
the authorized person holding power of attorney for signing application in which case a
certified copy of the power of attorney shall accompany the application. Such
Limited company or Corporation may be required to furnish satisfactory evidence of its
EW-371 PUR-F-006 RFQ-79155
existence before the pre-qualification evaluation. They should also furnish Articles of
Memorandum of Association. If the application is made by group of companies, it shall be
signed by the authorized person. The authority letter shall be accompanied with the
1. SECURITY DEPOSIT
It should be mandatory to submit security deposit as per cl no.7 of Section C (i.e General
condition of contract). In cases where selected agency (successful L1 bidder) is not willing
to pay SD in advance, either EMD may be converted to SD or SD may be deducted from 1 st or
subsequent invoices/RA bills with consent from the bidder.
2. MAINTENANCE:
The contractor shall be responsible to make good and remedy at his own expense any defect
which may develop or may be noticed before the period mentioned hereunder from the
certified date of completion. The same shall be attended within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the Engineer-in-charge may rectify
or remove or re-execute the work at the risk & cost of the contractor. The Engineer-in-charge
shall be entitled to appropriate the whole or any part of the amount of security deposit
towards the expenses, if any, incurred by him in rectification, removal or re-execution. The
defects liability period shall be as under,
a) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put to
tender), the period shall be 06 months from the certified date of completion OR one
monsoon, whichever is later.
3. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 11 (Eleven) calendar months
from the date of issue of letter to commence the work. However extension in time limit will be
granted by GSECL for the genuine reasons only as per terms of the contracts.
4. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL’s general procedure and submission
of bill by the agency. Also, 75% payment shall be made immediately within a week period on
receipt of recorded bill by Account Section without checking of detail bill and compliance of
queries & statutory requirement. However, remaining balance 25% amount shall be released
only after through checking of detail bill and compliance of various quarries, statutory
compliance etc. The above payment term is applicable to all the bills of general civil works &
ARC/BRC works, provided the bills are recorded regularly and submitted to Account Section
within Ninety [90] days. If the contractor fails to submit the bills regularly in such a way so
that the same cannot be recorded and submitted to account section within Sixty [60] days,
ad-hoc payment as stated above, may not be released and payment will be released as per
GSECL’s general procedure. The period of Sixty [60] days shall be considered from the date of
receipt of last R.A. Bill by Account Section.
5. METHOD OF PAYMENT:
The payment for the work done will be made by running bills every month after
taking joint measurement within 30 days. Final bill will be paid within reasonable
time after settlement of material account by you and after recording of joint
6 “All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm
along with a certificate regarding verification of authenticity of documents as per the format
placed at Appendix 1. All the documents submitted by the bidder in support of meeting
EW-371 PUR-F-006 RFQ-79155
Technical QR only shall be digitally signed by the Specified Third-Party Inspection Agency
(TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.
The verification and certification of authenticity of documents is acceptable from any of
the following TPI As:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The Bidder shall be responsible to get their documents/ credentials verified & certified by
the Specified Third- Party Inspection Agency (TPIA) or Statutory Auditor of their Company
or Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party
verification and certification (including those by statutory auditors) shall be borne by the
Bidder. GSECL shall have no liability (financial or otherwise) towards the same and shall
not be liable for any claim/ dispute between the bidder and the Specified Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
EW-371 PUR-F-006 RFQ-79155
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at ……………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the list
mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents, which
are also attached with this letter. The same has been verified from the Original Documents
and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have any
conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
The rights and liabilities of the contractor shall not be assigned or transferred by them
without the consent in writing of the GSECL to any other person, firm or organization.
2. The successful Bidder, on receipt of letter of intent will submit within a week's time
his planning / programme of works, for scrutiny of the GSECL in a Bar Chart format,
clearly indicating GSECL's inputs also. Contractor will plan his works such that
EW-371 PUR-F-006 RFQ-79155
simultaneous work should progress in such a way that entire job is completed in scheduled
time limit on all the fronts released by GSECL.
3. The successful bidder will have to depute his authorized representative to attend
progress review meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
4. The Contractor will be responsible for complying with all rules and regulations and
labour laws applicable to him and the GSECL will not be responsible for any lapses
committed by them. If there is any claim from any Government authority pertaining to the
contract, the same amount will be deducted from the Contractor's bill.
5. The time limit for completion of work is stipulated as in the tender will be adhered to.
6. The Contractor's rates should be firm and no variation clause is to be quoted by the
Contractor and GSECL will not accept the same, during contractual period including
extended time limit if any.
7. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as
a guide to the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for
himself all the data, information and particulars required for the satisfactory execution of
the work under this tender. The submission of a bid by Bidder implies that he has fully
read the specifications, bid drawings, instruction to the bidder along with Contract
Document and Conditions of Contract, applicable labour laws, safety norms etc., and has
made himself aware of the scope and the specifications for the work to be performed and
local conditions and other features which have a bearing on the cost and execution of the
work. This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not intended to cover minute
details. The work shall be executed in accordance with the best modern practice and to the
complete satisfaction of the Purchaser. Special techniques approved by the Purchaser shall
be used if and where found necessary. This specification shall have precedence if anything
contrary to this is stated elsewhere in the contract documents. The Purchaser’s decision
shall be final and binding on the contractor on any issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all
information required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of Transport
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL’s security checks.
All materials brought to site only after making entries in security register at Control
c) These factors are likely to affect the satisfactory completion of work and or cost
thereof. The submission of a bid by the Bidder will be construed as evidence that such
an examination was made and any later claims/ disputes in regard to rates quoted
shall not be entertained or considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities
including cash, arising out of the site visit shall be at the bidder’s account.
e) Contractor’s scope of work shall also include making all necessary arrangements for
access to work sites, stores and site offices etc. from the nearest approach road to
facilitate transportation of man power, machinery and equipment duly considering the
existing site conditions. No extra claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors &
shall take into account &consider all the factors such as lead, lift haulage of materials,
sequence of construction, etc. & shall allow for all such information / data in the rates
EW-371 PUR-F-006 RFQ-79155
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor
claims, after acceptance of contract to have misjudged the site condition. Ignorance of
the intents and contents of the specification document and site conditions shall not be
accepted by the Owner as basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as sub-surface conditions, water records, access to
site, communication, transport, right of way, the type and number of equipment and
facilities required for the satisfactory completion of work, the quantity of various items
of the work, the availability and rates of material, local working conditions,
uncertainties of weather, obstructions and hindrances that may arise etc. which may
affect the work or cost thereof, before submission of his bid. Ignorance of site
conditions shall not be accepted by the ENGINEER IN CHARGE as basis for any claim
for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations of
the Engineer in Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit on online in n-procure with their offer without any deviations
in general terms and conditions of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be
accepted. Once the offer is submitted by bidder before due date of submission, the
bidder shall not be allowed to submit revised/ additional/ modified offer even before
due date and time of submission of tender. However, if the date of issue and/or
submission of tender are extended by the Corporation due to any reason, the bidder
may submit if their wishes the revised/additional/modified offer before extended due
date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons thereof.
Tenders deferring from the technical specifications or the method of bidding in a
radical manner may also be rejected.
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour
conditions & in general all the necessary information and data etc. pertaining to and
need for the work.
n) This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not intended to cover
minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques
approved by the Purchaser shall be used if and where found necessary. This
specification shall have precedence if anything contrary to this is stated elsewhere in
the contract documents. The Purchaser’s decision shall be final and binding on the
contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an
engineering construction firm or an association of firm or firm which has successfully
carried out large works of this nature and has adequate organization and experienced
personnel to handle this type and magnitude of work. Information should also be
given regarding the constitution of the firm; it’s authorized, subscribed & paid up
capital, the date & place of registration, the place of business, the names of the
directors and other relevant information.
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification
documents in the final ‘Contract’. BIDDERS are required to review these documents
and clearly state in their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped
and dated in ink by the BIDDER as a token of having examined the same. Any
correction in price and the rates entered in the Schedule of Price shall also be signed
and dated by the BIDDER in ink, before submitting the bid. Non-compliance with this
condition will make the bid liable for rejection.
EW-371 PUR-F-006 RFQ-79155
r) All safety measures as required to be adopted as per the Statutory Regulations and the
Safety Rules of the Plant shall be strictly followed by the Contractor during the
execution of the Contract. The Contractor shall set up a suitable safety organization of
his own in this regard.
s) In connection with the execution of the Contract, the Contractor shall comply with all
applicable statutory Rules & Regulations including employment of labours at site.
t) The Contractor shall carry out any and all such works, as may be required, for civil
work to be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he
shall direct the Contractor to depute more numbers of supervisory personnel/workers
to meet the completion schedules as per the Contract. Upon receiving such direction,
Contractor shall deploy additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the
work executed, found not in accordance with the specifications/ instructions. No extra
claims shall be entertained for re-executing or altering of such work.
8. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including
existing structures during execution of the contract. Safety measures shall be followed
during operations of equipments/machinery being used. No separate payment shall be
made for the safety measures and the quoted rates shall include the cost for all safety
9. COMPLETENESS:
Any technical services as set forth here in above and which might not have been
specifically mentioned in this Contract relating to the work or in the specifications and
which are not expressly excluded therefore but which are necessary for the
performance in accordance with the specifications as an integral part of the painting
and misc. Civil works shall be rendered by the Contractor without any extra cost.
10. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
11. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower
by cheque A/c payee only, as per minimum wages & prevailing applicable rules on
or before 7th day of next month.
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal
Officer (Estt.) GSECL, Gandhinagar TPS.
12. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State
Electricity Corporation Ltd.'s rules on stamped paper and the necessary stamp duty
charges shall be borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the
tenderer who would be responsible for taking instructions from the Engineers of the
GSECL shall be communicated to Chief Engineer (Gen.) Gandhinagar Power Station,
Gujarat State Electricity Corporation Limited.
13. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory
then GSECL will take such action to get the work done through the other agency at
agency’s risk and cost with 15% supervision charges and same will be recovered from
14.The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 &
L3 till the successful contractor pays the Security Deposit as mentioned in tender
document or after the expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security
Deposit for the tender work. If he fails to furnish the SD, his EMD shall be forfeited
and the tenderer will not be allowed to participate in the tenders invited by this office
EW-371 PUR-F-006 RFQ-79155
for a period of ONE Year in respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date
of submission of the tender.
15. Effect and validity of Bid: The submission of bid with these documents and specification
shall constitute an agreement that bidder shall have no cause of action or claim against
the GSECL for rejection of his bid. The GSECL shall always be at liberty to reject or accept,
split any bid or bids at its sole discretion and any action will not be called into question
and the bidder shall have no claim in that regards against the GSECL.
16. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and
unless it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the
same is issued by the company within the validity period and as per agreed terms
and conditions,
Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time
scheduled / as per company’s time limit, as mentioned in the LOA, if the Letter of
Acceptance (LOA) is placed subject to submission of type reports / documents to the
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not
returned or has short returned or has unauthorisely disposed of materials /
documents / drawings / tools or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and
Has unauthorisely obtained official company information or copies of documents, in
relation to the Tender / Contract.
Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the
company given to the firm only for its use (in discharge of its obligations against an
order) to any third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to
deal with the Firm
In case the state Government directs the Company to place a firm in stop dealing /
banned for business dealing / blacklisting.
Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders for particular quoted item.
Such conflict of interest can lead to anti-competitive practices to the detriment of
Procuring Entity's interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) They have proprietor/partner(s)/Director(s)in common; or
b) They receive or have received any direct or indirect subsidy/financial stake from
any of them; or
c) They have the same legal representative/agent for purposes of this bid; or
EW-371 PUR-F-006 RFQ-79155
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on
the bid of another bidder, or
e) bidder participates in more than one bid in this bidding process. Participation by a
bidder in more than one Bid will result in the disqualification of all bids in which
the parties are involved. However, this does not limit the inclusion of the
components/ sub-assembly/ assemblies from one bidding manufacturer in more
f) In cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorise only
one agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;
2. Indian/foreign agent on behalf of onIy one principal.
g) A Bidder or any of its affiliates participated as a consultant in the preparation of
the design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/ management,
only one unit should quote. Similar restrictions would apply to closely related
sister companies. Bidders must proactively declare such sister/common
business/ management units in same/ similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition act,
as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder
shall not have conflict of interest with other bidders for particular quoted item, as
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR
EW-371 PUR-F-006 RFQ-79155
GENERAL CONDITIONS OF CONTRACT
EW-371 PUR-F-006 RFQ-79155
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof,
together with the documents referred to therein or individual work order in the case
of term contract, including these conditions, schedules and/or additional
conditions attached to the form of tender or individual works, order, rate schedule,
the specifications and the drawings and all these documents, as applicable, taken
together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the
contractors for the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall,
unless there be something in the subject or context repugnant to such construction
means, the works or the work contracted to be executed under or in virtue of the
contract whether original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated
or not, undertaking the words and shall include his or its legal personal
representatives, successors and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the
“Accepting Officer” means the Officer who is authorized to sign and signs the
contract on behalf of the “Corporation”.
(f) The letter “EE” means Executive Engineer who in the case of measurement and
lump sum contract, direct the contract and the letters “SE” means Superintending
Engineer and “GM” means General Manager who administers and in the case of the
term contracts, directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the
General Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer
(Gen), Gandhinagar TPS to Superintending Engineer or the person deputed by him
for the particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution.
“A.S.” means the “American Standards” as issued by the American Standards
Institution, and “I.S.” means the “Indian Standards” as issued by the Indian
Standards Institution. Wherever the above-mentioned abbreviations are referred to,
in the specifications and/or work orders, they mean the addition with all
amendments current at the date of issue of tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those
contained in Gujarat State Electricity Corporation Ltd. scheduled together with any
amendments etc. embodied in the tender documents. “Drawing” refers to those
incorporating the tender documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance
with the prices accepted in the tender and/or the contract rate as payable to the
contractor for the full and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part
of the works set out or ascertained in accordance with the individual work orders
and the tender documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders
in subsequent exchange of correspondence, the conditions of contract shall be
binding on the Contractor and any change or variation expressed or implied,
however made in the said conditions, shall not be valid or operative unless
expressly sanctioned by the Corporation. The Contractor shall be deemed to have
fully informed himself and to have special knowledge of the provisions of the
conditions of the Contract herein contained.
EW-371 PUR-F-006 RFQ-79155
B. The contractor shall be deemed to have carefully examined the work and site
conditions, the general conditions, the special conditions, specifications, schedules
and drawing and shall be deemed to have visited the site of the works and to
have fully informed himself regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any
other matter concerning the contract, he shall in good time before submitting his
tender, send for the particulars thereof and submit them to the Engineer-in-charge
in writing in order that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one
certified copy of accepted tender.
The drawings which form part of these specifications show the work to be done in as
much detail as is possible at the present stage. They will be supplemented by such
additional detailed drawings as may be necessary as the work progresses. The
contractor shall perform the work on these features and in accordance with these
additional or revised drawings as the case may be and at the applicable rates as per
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The
contractor shall not take advantages of errors or omissions of any kind in the
drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall be
given at one mutually agreed point at work site free of cost by the GSECL. Further
extension for construction site as well as bore well site for using construction water
will have to be carried out by the contractor as per requirement at their cost. The
necessary electric charges will be paid by the contractor as per rates prevailing from
time to time in the respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of GSECL's
staff, then GSECL will consider allotment of quarters on rent as per GSECL's rule.
2. The contractor will have to make their own arrangement of water for
construction work as well as for their labourers at his own cost. If possible,
water for construction purpose only at one point as decided by EIC and
recovery for water charges shall be affected at the 2 % of the item of which
water is used or by quantity measured by meter reading of water meter
installed by contractor, rate of water supply will be charged at prevailing
purchase rates of GSECL, for water supplied by GSECL is used as certified by
EIC. In case of agency is installing bore well and pumps at his cost, after
completion of work agency will hand over the bore well in good condition with
pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week
of the date of contract, a layout plan of construction plant and equipment for
the execution of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive
Engineer for approval, plans in triplicate showing the location of Major plant
shop and storage buildings, storage yards, offices, contractor's power house
including its services and housing facilities which he proposes to put up at site and
also indicate the programme of the work.
The successful bidder on receipt of letter of intent will submit within a week's time
his planning/programme of works for scrutiny of GSECL in a PERT/Bar chart
format, clearly indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit.
EW-371 PUR-F-006 RFQ-79155
No change in the approved layout shall be carried out without specific written
approval of the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall be
made to the Executive Engineer whose elucidation and elaboration shall be
considered as authoritative. The contractor shall be held responsible for any error
that may occur in the work thorough lack of such reference and precautions.
7. SECURITY DEPOSIT:
SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder) security
deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Exempted 3% of Order Value
Organization which are
exempted from paying
Tender Fee & EMD
For all other Enterprises 5% of Order Value 5% of Order Value
Note: Security Deposit will be collected from the successful tenderer at the rates
mentioned above. This may be recovered by deduction through running bills of the
contractors and / or by treating the Earnest Money Deposit (Bid Security) paid at
the time of submission of the tender.
After issue of Work order and Date of commencement, if successful bidder failed to
start the work then, RPAD notice will be issued to the successful bidder
mentioning that on failing to start the work within next 07 days from the date of
issue of RPAD Notice the EMD will be forfeited and he will not be allowed to
participate in the tenders invited from Gandhinagar TPS office for the period of
The security deposit of the contract value shall be released on finalization of final
bill / successful completion of maintenance period / work.
All damages, costs, charges, expenses and other sums which may be or may
become due or payable by the contractor to the Corporation under the terms of the
contract, may be deducted from the cash in the proceeds of sale of the
securities/bank guarantee so deposited (which the officer or person to whom the
same may be endorsed as aforesaid is hereby authorized to sell/to encase for that
purpose) or from the interest of any such securities or from any sums due or
which may become due to the contractor by the Corporation or from the whole or
the balance unpaid as aforesaid of the encase securities so deposited being repaid
or transferred and returned as the case may be, to the contractor on finalization of
final bill OR after 06 (six) months of successful completion of the work, whichever
later OR on furnishing of the Performance Bond amounting to 5% of contract value
against the defect liability period as mentioned in this document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be
remain valid during the contractual period and such bank Guarantee should not
be reduced on the basis of the work actually done.
8. USE OF LAND:
The land required for office, godowns and for labour camp if not available with
GSECL, then the contractor has to arrange the same at his cost. GSECL will give
the land only if the spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of
this contract free of cost. The contractor shall be permitted to use for the bonafide
EW-371 PUR-F-006 RFQ-79155
purpose of execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for
the necessary approach, road, for transport of their materials and be
responsible for the compensation on account of damage to crop etc. and shall
till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every
acre or part thereof, for the construction of temporary hutments and his store
yard. However area required for such purpose may be clearly indicated in this
All areas of operation, including those for his staff and labour colonies handed
over to the contractor shall be cleared and handed over back in good condition
to the Engineer except areas under works as per this contract or those for
which specific approval has been obtained from the Engineer. The contractor
shall make good to the satisfaction of the Engineer any damage or alternation
made to areas which he has to hand over back or to other property land handed
over to him for purpose of this work.
Temporary structures may be erected by the contractor for storage sheds,
offices, residence etc. for noncommercial use on the land, handed over to him at
his own expense and with the permission of the Engineer. These structures
shall comply with the regulation that may be in force and/or specified by the
Engineer with regard, thereto. In any circumstances for constructing temporary
structures for contractor's use, GSECL's free supply materials shall not be used.
If it is found that GSECL's free supply materials are used for other than
approved project drawings work, same will be recovered at
penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent
to the sites which do not interfere with the construction as determined by the
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be
felled and to structures under construction, or to workmen, and shall be
responsible for any damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and
shall be stocked at the place specified by the Engineer. No claim shall be made
for such cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush
wood, grass or other vegetation nor shall set fire there to without the written
permission of the Engineer. When such permission is given, the contractor shall
take necessary measures to prevent damage or to prevent fire spreading to
surrounding property, and shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in
Charge immediately after the completion of the work under this contract. Also
no land shall be held by the contractor longer than the Engineer shall deem
necessary and the contractor shall, on due notice by the Engineer, vacate and
return the land which the Engineer may certify as no longer required by the
contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with
the written authority or instructions of the Executive Engineer or his subordinate
in charge of the work, failing such the contractor shall have no claim to ask for
measurement or payment for work and shall be responsible for any claims or
damages that may arise due to such unauthorized commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order
to commence work is given to the contractor. The work shall throughout the
stipulated period of contract be proceeded with all due diligence (time being
EW-371 PUR-F-006 RFQ-79155
deemed to be the essence of contract) and for delay, the contractor shall pay
compensation, an amount equal to ½ (half) percent per one week for the contract
amount or part thereof, including taxes & duties ( i.e. End cost of contract amount
including taxes & duties) and maximum up to 10 % of the order value, including
taxes & duties ( i.e. End cost of contract amount including taxes & duties) or such
smaller amount as per the decision of the Competent Authority of the GSECL The
penalty will be invariably deducted from the bills of the contractor and no refund
will be given unless the competent authority approves the reduction. The reasons
for delay, attributable to GSECL as well as to party will be brought out clearly
while putting the proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor
shall have tendered himself to pay compensation amounting to the whole of his
security deposit (whether paid one sum) or in the case of abandonment for the
work owing to serious illness or death of the contractor or any other cause, the
Executive Engineer on behalf of the Corporation, shall have powers to adopt (a)
below and any of the following courses under (b) and (c) as he may deem best
suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence
and in that case the security deposit of the contractor shall stand forfeited and
absolutely at the disposal of the Corporation. To employ labour paid by the
Corporation, to supply materials, to carry out the works or any part of the work
debiting the contractor with the cost of the labour and the price of the materials (as
to the correctness of which cost and price, the certificate of the Executive Engineer
shall be final and conclusive against the contractor) and crediting him with value
of the work done in all respects in the same manner and at the same rates as if it
had been carried out by the Contractor under the terms of this contract and in
that case the certificate of the Executive Engineer as to the value of the work shall
be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part
thereof, as shall be unexecuted, out of his hands and to give it to another
contractor to complete, in which case, any expenses, which may be incurred in
excess of the sum, which would have been paid to the original contractor, if the
whole work would have been executed by him (as to the amount of which excess
expenses, the certificate in writing of the Engineer-in-charge shall be final,
conclusive and shall be borne and shall be paid by the original contractors and
shall be deducted from any money due to him by the Corporation under the
contract or otherwise from his security deposit of his proceeds sale thereof or a
sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him by
reason of his having purchased or procured any materials or entered into any
engagements or made any advances on account of or with a view to the execution
of the work or the performance of the contract. And in case the contract shall be
rescinded under the provision aforesaid, the contractor shall not be entitled to
recovery or be paid any sum for any works thereof actually performed by him
under this contract unless and until the Executive Engineer shall have certified in
writing the performance of such work and the amount payable to him in respect
thereof and he only be entitled to be paid the amount so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as
per the opinion/observation of the Executive Engineer (whose decision shall be
final) in charge that the general progress of work is not satisfactory, then
Executive Engineer in charge shall be entitled to take action under clause 11 (c)
after giving the contractor ten days’ notice in writing and the contractor will have
no claim for compensation for any loss sustained by him owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
EW-371 PUR-F-006 RFQ-79155
In any case in which any of the powers conferred upon the Executive Engineer by
Clauses 11 and 12 hereof shall have exercisable and the same shall not have been
exercised, the non-exercised thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall not withstanding be exercisable in any
further case of default by the contractor of which, by any clauses hereof, he is
declared liable to pay compensation amounting to the whole of his security deposit
and liability of the contractor for past and future compensation shall remain
unaffected in the event of the Executive Engineer taking action under sub-clause
(a) or (c) of Clause 11, he may if he so desires, take possession of all or any tools,
plants, materials, and stores in so upon the work or the site thereof belonging to
the contractor, or procured by him and intended to be used for the execution of
the work of any part thereof paying for allowing for the same in account at the
contract rates, or in the case of a contract rates not being applicable of current
market rates to be certified by the Executive Engineer whose certificate thereof
shall be final. In the alternative, the Executive Engineer may by notice in writing to
contractor or his clerk of works, foreman or other authorized agent, require him to
remove such tools, plant, materials or stores from the premises within a time to be
specified in such requisition, the decision to the contractor failing to comply with
any such requisition, the decision of the Executive Engineer as to the expense of
any such removal and the amount of the proceed and expense of any such sale, be
final and conclusive against the contractor
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the
work on the ground of his having been unavoidably hindered in its execution or on
any other ground, he shall apply in writing to the Executive Engineer and the
Executive Engineer may, if in his opinion there are reasonable grounds for
granting extension, recommend such extension as he may think necessary or
proper. The decision of the competent authority in this regard shall be final, and
binding to the contractor. Any delay attributed to Corporation, shall be thus
compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion
Certificate by the Executive Engineer. No such certificate shall be given nor shall
be the work considered to be completed until works are taken over and/or duly
tested and put to operation as the case may be, nor until the work shall have been
measured by the Engineer-in-Charge or where the measurement have been taken
by his subordinates until they have received the approval of the Executive
Engineer the said measurement being binding and conclusive against the
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till
after the whole of said work shall have been completed and a certificate of
completion given. But in the case of works estimated to cost more than Rs.1,000,
contractor shall on submitting a monthly bill thereof, be entitled to receive
payments. Proportionate to the part of the work then approved and passed by the
Engineer-in-Charge, whose certificate of such approval and a passing of the sum
so payable shall be final and conclusive against the contract. All such intermediate
payment shall be regarded as payment by way of advance against the final
payment only and not as payments for work actually done or completed and shall
not preclude the Engineer-in-charge from requiring bad, unsound, imperfect or
unskillful work to be removed and taken away and reconstructed or re-erected nor
shall any such payment be considered as admission of the due performance of the
contract or any part thereof in any respect of the occurring of the claim nor shall
conclude, determine or effect in any way the powers of the Engineer-in-Charge as
to the final settlement and adjustment of the accounts otherwise or in any other
way, vary or affect the contract. The final bill shall be submitted by the contractor
within one month of the date fixed for completion of work; otherwise the certificate
EW-371 PUR-F-006 RFQ-79155
of the Engineer-in-charge of the measurement and of total amount payable for the
of the Engineer-in-charge of the measurement and of total amount payable for the
work shall be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1, 000 agreed
to within shall be valid only when the item concerned is accepted, having been
completed full, in accordance with the sanctioned specification. In case, where the
items of the work, are not accepted, as so completed, the Engineer-in-charge, may
make payment on account of such items at such reduced rates, as he may
consider reasonable in the preparation of final or running accounts bills and it will
be binding to the contractor.
The Bill Shall be submitted by the contactor each month on or before the date
fixed by the Engineer-in-charge, for all works, executed in the previous month and
the Engineer-in-charge shall take or cause to be taken the requisite measurement
for the purpose or having the same verified and the claim so far as it is admissible,
shall be adjusted, if possible, within Fifteen days from the presentation of the bills.
If the contractor does not submit the bill, within the time fixed, as aforesaid, the
Engineer-in-charge may depute a subordinate to measure up the said work in the
presence of the contractor or his duly authorized agent, whose counter signature
in the measurement shall be sufficient warrant and the Engineer-in-charge may
prepare a bill from such list which shall be binding on the contractor in all
respects. In case if contractor/ representative does not remain present on specified
date for taking measurement than EIC may take the measurement one sided and
the same shall be binding to the contractor irrespective whether he has signed or
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
If the specification of the estimated work provides for use of any special
description of material to be supplied from the Corporation’s stores or if it is
required that the contractor shall use certain stores to be provided by the
Engineer-in-charge, (such material and stores and the prices to be charged thereof
as hereinafter mentioned being so far as practicable for the convenience of
contractor but not so as in any way to control, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed). The
contractors shall be supplied with such materials and stores as may be required
from time to time be used by him for the purpose of the contract only and the
value of the full quantity of materials and stores so supplied shall be set off or
deducted from any sum due or thereafter to become due to the contractor, under
the contract or otherwise or from the security deposit or the proceeds of sale
thereof if the deposit is held in government securities the same or a sufficient
portion thereof, shall be sold for the purpose. All materials supplied to the
contractor shall remain the absolute property of the Corporation and shall on
account be removed from the site of work and shall at all times be open to
inspection by the Engineer-in-charge. Any such materials unused and in perfectly
good condition at time of completion or determination of the contract shall be
returned to the Corporation’s store if the Engineer-in-charge so requires by notice
in writing given under his hand but the contractor shall not be entitled to return
any such materials except with such consent and he shall have no claim for
compensation on account of any such materials supplied to him as aforesaid but
remaining unused by him or for any wastage in or damaged thereto. The
contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWING, ORDERS ETC.
EW-371 PUR-F-006 RFQ-79155
The contractor shall execute the whole and every part of work in the most
substantial and workman like manner and both as regarding materials and in
every other respect in strict accordance with the specification. The contractor shall
also confirm exactly, fully and faithfully to the designs, drawings and instructions
in writing relating to the work signed by the Engineer-in-charge and lodged in his
office and to which the contractor shall be entitled to have access for the purpose
of inspection at such office, or on the site of the work during office hours and the
contractor shall, if he so requires, be entitled at his own expense to make or cause
to be made copies of the specification and of all such designs, drawings and
instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions to
the original specification, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out the work in accordance with any instruction in this connection
which may be given to him in writing, signed by the Engineer-in-charge and such
alterations shall not invalidate the contract. Any additional work which the
contractor may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on same conditions in all respect on which
he agreed to do the main works and at the same rates as are specified in the
tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and
the specifications recommended by the contractor and accepted by the competent
authority, the alteration above referred to shall be within the scope of such
designs, drawings and specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE
OF THE CORPORATION
If the additional and altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Corporation or at the rate mutually agreed
upon between the Executive Engineer and the Contractor, whichever are lower. If
the additional or altered work for which no rate is entered in the Schedule of Rates
of the Division is ordered to be carried out before the rates agreed upon then the
contractor within seven days of date of receipt by him of the order to carry out the
work should inform the Executive Engineer for the rate which it is his intention to
charge for such class of work and if the Executive Engineer does not agree to this
rate, he shall be noticed in writing, be at liberty to cancel his order to carry out
such class of work and arrange to carry it out in such manner as he may consider
advisable provided always that if the rates shall have been determined as lastly
herein before mentioned then in such case he shall only be entitled to be paid in
respect of the work carried out or expenditure incurred by him prior to the date of
the determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Executive Engineer in the event of disputes, the decision of the
General Manager of the Corporation will be final.
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR
The time limit for the work shall be extended in the proportion that the increase in
its cost occasioned by alterations or additions bears to the cost of the original
contract work and the certificate of the Engineer-in-charge as to such proportions
shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO
If at any time, after the execution of the contract documents, the Engineer-in-
charge shall, for any reason whatsoever, requires the whole or any part of the
work, as specified in the tender, to be stopped for any period or shall not require
the whole or part of the work to be carried out at all or to be carried out by the
contractor, he shall give notice in writing of the fact to the contractor who shall
EW-371 PUR-F-006 RFQ-79155
thereupon suspend or stop the work totally or partially as the case may be in any
such case, except as provided here under. The contractor shall have no claim to
any payment or compensation whatsoever on account of any loss in profit or
advantage which he might have derived from the execution, of the work in full but
which he did not so derive in consequence of the full amount of work not having
been carried out or on account of any loss that he may be put to on account of
materials purchased or agree to be purchased or for unemployment of labour
recruited by him. He shall not also have any claim for compensation by reason of
any alterations having been made in the original specification, drawings, designs
and instructions which may involve any curtailment of the work as originally
contemplated. Where, however, materials have already been purchased or agreed
to be purchased by the contractor before receipt by him of said notice, the
Executive Engineer provided they are not in excess or requirement and are of
approved quality and/or shall be compensated for the loss, if any, that he may put
to in respect of materials agreed to be purchased by him. The amount of such
compensation to be determined by the Executive Engineer, whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labour
charges during the period, during which the stoppage of work has been ordered
under this clause the contractor shall on application be entitled to such
compensation on account of labour charges as the Executive Engineer whose
decision shall be final, may consider reasonable provided that the contractor shall
not be entitled to any compensation on account of labour charges if, in the opinion
of the Executive Engineer, the labour could have been employed by the contractor
elsewhere for the whole or part of the period during which the stoppage of the
work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY
IN SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation
for the loss suffered by him on account of delay by Corporation in the supply of
materials entered in Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Any other reasonable cause beyond the control of Corporation, including shortage
of materials to be supplied by the Corporation and difficulties in time by reaching
at the site of any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstances of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as
final by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Corporation on any account unless the contractor has claimed
in writing to the Executive Engineer within one month of the cause thereof.
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall
appear to the Executive Engineer or his subordinate in charge of the work that
any work has been executed with unsound, imperfect or unskillful workmanship
or with materials of inferior quality or that any materials or articles provided by
him for the execution of the work are unsound or of inferior quality to that
contract for or are otherwise not in accordance with the contract, it shall be lawful
for Engineer-in-charge to intimate this fact in writing to the contractor and then
notwithstanding the fact that the work, materials, or articles complained of, may
have been inadvertently passed, certified and paid for, the contractor shall be
bound forthwith to rectify or remove and reconstruct the work so specified in
whole or any part, as the case may require or if so required shall remove the
materials or articles so specified and provided other suitable materials or articles
EW-371 PUR-F-006 RFQ-79155
at his own charge and cost, and in the event of his failing to do so within a period
to be specified by the Engineer-in-charge in the written intimation aforesaid the
contractor shall be liable to pay compensation at the rate of one percent on the
amount of the estimate for every day not exceeding ten days during which the
failure so continues and in the event of any such failure as aforesaid, the
Engineer-in-charge may rectify or remove or re-execute the work or remove and
replace the materials or articles complained of, as the case may be, at the risk and
expense in all respects of contractor should the Engineer-in-charge consider that
any such inferior work or materials as described above may be accepted, or made
use of, it shall be within his discretion to accept the same as such reduced rates
as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the
Engineer-in-charge or his subordinate in charge of the work feels that such work
has been executed with unsound, imperfect or unskillful workmanship or with
materials of inferior quality, he shall take sample tests at random, cost of which
shall have to be borne by the contractor and if after taking such test part of such
work is found to be defective in any respect or to have been executed with
materials of inferior quality then the contractor shall pay for the whole work such
amount as may be fixed by the office of the Engineer-in-charge on the basis of the
lowest quality of work found by him in such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE
AGENT TO BE PRESENT.
All works under execution or in pursuance of the contract shall at all times be
open to the inspection and supervision of the Executive Engineer and his
subordinate and contractor shall at all times, during the usual working hours and
at all other times at which reasonable
notice of the intention of the Executive Engineer or his subordinate to visit the
works shall have been given to the contractor, during which period either he
should be present to receive order and instruction, or have a responsible agent
duly authorized agent shall be considered to have the same force and effect as if
they had been given to the contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Executive
Engineer or his subordinate in charge of the work, before covering up or otherwise
placing beyond the reach of measurement of any work, in order that the same may
be measured and correct dimensions thereof, taken before the same is so covered
up or placed beyond the reach of measurement and shall not be covered up or
placed beyond the reach of measurement and work without the consent in writing
of Executive Engineer or his Subordinate in charge of work. If any work shall be
covered up or placed beyond the reach without such notice having been given or
consent obtained, the same shall be uncovered at the contractor’s expense and in
default thereof no payment or allowance shall be made for such work or for the
materials with which the same was executed.
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special
materials, if any as may be supplied from the Corporation stored in accordance
with the contract). Plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding and any temporary works which may be required for the proper
execution of the work, in the original, altered or substituted form and whether
included in the specification and other document forming part of the contract or
referred to in these conditions or not and which may be necessary for the purpose
of satisfying and complying with the requirements of the Engineer-in-charge as to
any matter on which under these conditions, he is entitled to be satisfied or which
he is entitled to require together with carriage thereof to and from the work. The
contractor shall also supply without any charge the requisite number of persons of
setting out works and counting, weighting and assisting in the measurement of
examination at the time and from time to time of the work or materials, failing this
the same may be provided by the Engineer-in-charge at the expenses of the
EW-371 PUR-F-006 RFQ-79155
contractor and the expenses may be deducted from any money due to the
contractor under the contract or from his security deposit or the proceeds of sale
thereof or of a sufficient portion thereof, the contractor shall provide all necessary
fencing and light required to protect the public from accident and shall also be
bound to bear expenses of defense of every suit, action or other legal proceedings
of law that may be brought by any person for injury sustained. Owing to
neglecting of the above precautions and to pay any damage and cost which may be
awarded in such suit, action or proceedings to any such person or which may with
the consent of the contractor be paid in comprising any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor’s
laborer, whether in or beyond the limit of Corporation’s property, shall be estimated
by the Executive Engineer or such other office as he may appoint and the estimates
of the Executive Engineer, subject to the decision of the Superintending Engineer,
on appeal, shall be final and the contractor shall be bound to pay the amount of the
assessed compensation demand, failing which, the same will be recovered from the
contractor as damages or deducted by the Engineer-in-charge from any sums that
may be due to or become due from Corporation to the contractor under this
contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing to
negligence of precautions for prevent the spread of fire and he shall also pay any
damage and cost that may be awarded by the court, if in consequence
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the
Engineer-in-charge and if the contractor assign, or sublet his contract, or attempt
to do so or become insolvent or commence any proceedings to be adjudicated as
insolvent or make any composition with creditors, attempt to do so, the Engineer-
in-charge may, by notice in writing rescind the contract. Also, if any bribe, gratuity,
gift, loan, perquisite, reward or advantage pecuniary or otherwise shall either
directly or indirectly be given, promised or offered by the contractor or any of his
servants, or agents, or any person to the employee of the Corporation in any way
relating to his office or indirectly interested in the contract, the Executive Engineer
may, by ten days’ notice in writing, rescind the contract. In the event of a contract
being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the disposal of the Corporation and the same
consequences shall ensure as if the contract has been rescinded under Clause
thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the
use of Corporation without reference to the actual loss or damage sustained and
whether any damage has not been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction
and subject to the approval of Superintending Engineer /Engineer-in-charge for the
time being who shall be entitled to direct at what point or points and in what
manner they are to be commenced and from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to
him by Corporation under the Corporation’s rules, then in force, the decision of the
Superintending Engineer/EIC for the time being shall be final, conclusive and
binding on all the specifications, designs, drawings and instructions herein before
EW-371 PUR-F-006 RFQ-79155
mentioned and as to the quality of workmanship or material used on or as to any
other question, claim, right matter or thing whatsoever in any way arising out of or
relating to the contract, designs, drawings, specifications, estimates, instructions,
orders or these conditions or otherwise concerning, the works or the execution or
failure to execute the same, whether arising during the progress of the work or after
the completion or abandonment thereof.
37. Dispute Resolution Mechanism: For works contracts and composite
Contracts, the arbitration mechanism shall be governed by the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy or
claim between the Parties arising out of or relating to this contract with reference
to the construction, interpretation, breach, termination or validity thereof
(hereinafter referred as "the Dispute") shall, upon the written request of either
Party be referred to the authorized representatives of the Disputing Parties for
resolution. The authorized representatives shall promptly meet and attempt to
negotiate in good faith a resolution of the Dispute within thirty days of the service
of the request.
sub clause 37(2) Arbitration : If the Parties fail to amicably resolve the disputes
or differences or contrary claims as indicated herewith in sub clause (1) of Clause
37 arising under or in connection with the present works contracts, whether
pertaining to works contracts alone or works and procurement both, the same
shall be referred to arbitration under the Gujarat Public Works Contracts Disputes
Arbitration Tribunal Act, 1992."
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY
WHERE MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
The contractor shall obtain from the Corporation stores, such articles as are
mentioned in schedule “A” which may be required for the work or any part of the
work or in making up any articles required therefore or in connection therewith,
unless he has obtained permission in writing from the Executive Engineer or
obtained such stores and articles from elsewhere. The value of such stores and
articles as may be supplied to the contractor by the Engineer-in-charge will be
debited to the contractor in his account at the rate shown in the schedule “A”
attached to the contract and if they are not entered in said Schedule, they shall be
debited to him at cost price which for the purpose of this contract shall include
cost of carriage and all other expenses whatsoever which may have to be incurred
in obtaining delivery of the same at the stores aforesaid and further overhead
The Contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation, even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his
property. The contractor shall be responsible for returning the residual materials
after completion of the contract and it fails to return, the balance materials
supplied to him by the Corporation, the cost of the residual materials will be
recovered from the contractor at the market rate or stock issue rate whichever be
higher at the time of materials account plus 15%.
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of
parts of the works the contractor shall be entitled to payment in respect of the
items of works involved or the part of the work in question at the same rates as
are payable under this contract or such items or if the part of work in question is
not in the opinion of the Engineer-in-charge capable of measurement the
Engineer-in-charge may at his discretion pay the lump sum amount entered in the
estimate and the certificate in writing of the Engineer shall be final and conclusive
against the contractor with regard to any sum or sums payable to him under the
provision of this clause.
40. LUMP SUM TENDERS
EW-371 PUR-F-006 RFQ-79155
Whenever lump sum tenders have been invited for buildings or other structures of
the same type, design, the contractor shall submit his bill stated in Clause No.
and the Engineer-in-charge not below the rank of work, Executive Engineer shall
certify by general measurement or by other method considered suitable to him, the
value of work done and the contractor shall be paid monthly a sum equal to 90%
of the total value the work so certified, since the last payment, after deducting a
part or whole of the secured advance if not already paid for the materials utilized
on the works. An additional secured advance for any fresh materials utilized on
the works. An additional secured advance for any fresh materials brought on site
will also be paid if certified by the officer not below the rank of Executive Engineer.
After the work is completed final bill would be paid on the certification of officer
not below the rank of Executive Engineer, that the work, is done according to
drawing and specifications attached to the tender. If any additions and alterations
have been carried out, detailed measurement in respect thereof shall be recorded
and extra payment or deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions
and alterations for which the contractor has not quoted a rate, the payment shall
be as per Clause 39 above
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is
mentioned, such work shall be carried out in accordance with the PWD and in the
event of there being no PWD specification, the work shall be carried out in all
respects in accordance with the instructions and requirements of the Engineer-in-
charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be entertained
for quantities of work actually executed, being either more or less up to any extent
than those entered in the tender or less than those entered in the tender or
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on
account of acquisition of land and in the case of clearance for works or any delay
in according sanction to estimates.
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on
account of water standing in borrow pits or compartment. The rates are inclusive
for hard or cracked soil, excavation in mud, sub-soil water or water standing in
borrow pits and no claim for any extra rate shall be entertained unless otherwise
expressly specified and mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who
shall be fully authorized to receive and comply with such instructions, as given by
the Executive Engineer. The contractor shall intimate the name of such Engineer
with his qualifications and experience. The Executive Engineer shall have the right
to demand the removal of any technical personnel, skilled or unskilled workmen,
who in his opinion are considered to cause bad workmanship in the execution of
works or to cause indiscipline.
46. Terms and Conditions regarding Labour Laws
During the entire period of the contract, the Contractor and his Sub-m Contractor
shall at all times comply with all applicable labour laws, rules, regulations,
notifications, and bye-laws issued by the Central Government, State Government,
or Local Authorities. This includes all existing laws as well as any amendments or
new notifications that may come into force during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following
EW-371 PUR-F-006 RFQ-79155
Act / statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment &
Conditions of Service) Act, 1996;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Acq 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
12. Maternity Benefit Act, 1961 ;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of
Service) Act, 1979;
14. The Building And Other Construction Workers' Welfare Cess Act,
17. The Carriage by Road Act,2007.
The above list is only indicative and not exhaustive. The Contractor shall remain
fully responsible for ensuring compliance with all other applicable labour and
welfare legislations, rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition
to other obligations prescribed under various labour laws, rules, and regulations
issued by statutory authorities such as the State Government or Government of
India from time to time, which the contractor shall strictly comply with during the
execution of the contract.
1) The Factories Act,
The contractor should not deploy worker below the age of 18 years and above
years for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the provisions
of the Factories Act,
Payment of Earned Leave should be made monthly together with wages for better
compliances of law. The contactor shall maintain Earn leave Register in Form No.
19 as per the provisions of the said Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to date and kept
ready for inspection at any time or submitted on-time to the concerned authorities
as per applicability of the Acts by contractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under Contract
Labour (Regulation & Abolition) Act from the appropriate authorities before
commencement of work. The contract tor shall maintain a valid labour license
under the Contract Labour (Regulation and Abolition) Act for employing necessary
man power to be required by contractor.
The contractor should not be allowed to engage fifty (50) or more contract
labourers without initiating to obtain the labour license under the Contract
Labour Act. (the said number i.e., fifty (50) or more includes Supervisor and other
EW-371 PUR-F-006 RFQ-79155
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through nearest Nationalized
Bank compulsory, preferably situated in the premises of TPS area in case of all
works contract. The Contractor shall supply copy of Bank Statement duly
stamped by the Concerned Bank as well as debited entry of amount displayed in
the contractors' own bank account as token of proof towards payment of Wages
through CLIM/prevailing system at relevant time.
Apart from Payment of wages through Bank, Contractors shall have to make all
other payments like Advances, Bonus, Leave Encashment etc. to their labours
through bank only and cash payment / entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions of
the license. The contractor shall have to pay wages to workers as notified by the
Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of
their right to minimum wages payment on or before 7th of each month shall be
dealt as per the provision of labour laws. Recurrence of the same may lead to
cancellation of awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /Agency
/Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are
covered under the provident fund scheme and employee's pension scheme and
their contribution must be remitted regularly to the concemed RPFC. The
photocopies of challan along with ECR in this regards should be submitted
regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement regarding
deductions against employees' provident fund and family pension scheme in
respect of each concerned employee' Provident fund and family pension scheme at
the rate of 12 %o of wages (or at the rates made applicable by the Government
time to time). The contractor's contribution and his workers contribution towards
provident fund and family pension scheme shall deposited by the contractor with
concerned PF Authorities.
5) Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the
Employees Compensation A ct before starting the work. Employee Compensation
Insurance shall be obtained for all the workers engaged for the execution of
awarded contract. If any of the work is sub-letted the contractor shall ensure that
the sub contractor take and provide workmen's compensation and Employer's
liability insurance for the labours engaged. Contract tor is liable to pay
compensation in case of accidental injury arising or.t of and in the course of
employment as per the said Act and shall bear medical expenses due to on duty
6) The Payment of Gratuity Act,
EW-371 PUR-F-006 RFQ-79155
For better compliance, contractor shall pay amount of gratuity on a monthly basis
along with the payment of wages, calculated on a pro-rata basis per month, which
is equivalent to 15 days' wages for each completed year of service for every worker.
(* applicable to ARC / BRC works contract only).
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an accounting year,
bonus, in accordance with the provisions of this Act, For better compliance, the
contractor should pay bonus amount on a monthly basis along with wages
calculated on a pro-rata basis per month. Contractor has to submit the paid
bonus details of its worker in Form No. C as per the provisions of the said Act as
and when required by the Govt. Authority as well as by GSECL.
8) The maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity
Leave and other benefits as per the provision of the said Act.
9) The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1Xd), happening
outside / inside the Factory premises the said act will be applicable and the
contractor or its sub-contractor shall be liable to comply with the provisions
framed there under.
10) The contractor shall give preference to existing or local contract workers for
engagement in the awarded contract and shall issue appointment orders to each
and every workers individually at the time of their engagement during the period
of contract and terminate the same at the end of the each contract.
Follow the mentioned procedure at each milestone for the execution of works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare Officer /
Industrial Relations Officer for all formalities related to labour law compliance
before commencement of the contract and onward Labour Law compliance
thereof, so that later no dispute will arise in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contractor's employees
maintain strict discipline as regards security, methods of safe working etc, and
not to cause any hindrance to smooth running of power station or in execution of
duties by GSECL staff Any lapse in this regard will be viewed seriously and if
lapse found, contact is liable to be terminated. If any of contractor's staff is found
unsuitable or not behaving properly, the contractor shall have to remove such
worker from the work-site on demand by EIC. To maintain harmonious industrial
relations amongst contact labours is solely the responsibility of contrac tor. Any
breach of the same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the
premises of GSECL, is to facilitate them for easy, efficient, effective management
of data, gate passes, attendances, medical records, Police Verification documents
etc related to their employees / workers deployed for various works and services
against work order of GSECL.
4. On receipt of LOA and before commencement of work, authorized
representatives of the agency shall login in the CLIMS online portal / prevailing
EW-371 PUR-F-006 RFQ-79155
system at relevant time and apply for registration of their employees / workers
uploading all information with required documents in digital form. Upon
completion of due verifications, clearance by EIC and HR departments,
contracting agency will obtain gate passes. GSECL will only consider documents
like wage sheet duly accepted and signed by individual workers, as per the
engagement/deployment duration/hours of individual worker duly certified by the
agency, being the employer, for the purpose of payment of bills and HR
Agency shall be solely responsible for maintaining accurate and upto- date data of
their workers in the portal/ prevailing system at relevant time. All statutory
compliances under prevailing laws shall remain the responsibility of the
contracting agency. The agency shall indemnit/ GSECL against any liabilities
arising from noncompliance of legal provisions or inaccuracies in the data
maintained by them in the digital portal of CllMS/prevailing system at relevant
5. The Contractor who intends to engage labours more than the specified limit
under law, then necessary - Form No. V under the Contract Labour (R& A) Act,
1970 or Form No. VI under the Interstate Migrant worker (employment regulation)
Act 1979 as applicable is to be obtained for the purpose of obtaining labour
License from the Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric
punching and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site for
daily supervision and for maintaining of various registers and records required
under the Labour laws and contracts. No payment for such supervision shall be
8. The gate passes obtained for any specific work order will be valid for that
specific work order only and contractor should not divert the man power for any
other work order. If any work or part thereof is desired/required to sublet, the
contactor shall obtain the necessary permission of EIC in black and white well in
advance which is mandatory for considering the statutory documents of agency
other than the agency who awarded work order.
12) During Contractual Work under the progress:
1. All C-ontrac tors shall have to make the payment of wages to the Contract
Labours engaged by them, on or before 7th of every month through Nearest
Nationalized Bank compulsory, preferably situated in the premises of power
The Contractor shall supply copy of Bank Statement duly stamped by the
Concerned Bank as a token of proof towards payment of Wages through CLIMS i
prevailing system at relevant time.
2. All C-ontra c tors has to comply & maintain statutory documents /registers
under the provision of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS, the
contractor shall have to obtain work order wise separate Gate Passes and submit
the same with the documents of statutory compliance that too work order wise
every month to the User Department to enable their onward billing clearance.
EW-371 PUR-F-006 RFQ-79155
(13) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every
member, officer and employees of the GSECL, also Engineer-in-charge and his
staff against all actions, proceedings, claims, demands, costs and expenses
whatsoever arising out of or in connection with the matter referred in above
clauses and elsewhere and against all actions, claims demands, cost and
expenses which may be made against the GSECL by any workman/ employees of
contractor or any sub- contractor and or from any liability any wise to any
workman/employees of the contractor or sub-contractor under any laws, rules or
regulation having in force of law including but not limited to claims against the
owner under employee compensation Act, 1923. The Employee's Provident Fund
Act.l952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any
accident or injury to any workmen or other person in the employment of the
contractor or his sub-contractor, and the contractor shall indemnify and keep
indemnified the GSECL against all such damage and compensation and against
all claims, demands proceedings costs, charges and expenses whatsoever in
respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the
labour laws as above-mentioned and keep the G.S.E.C.L. indemnified in respect
GSECL : shall be entitled /empowered to deduct directly from the bills, the
amount to be paid to engaged bonafide contract workers or the contract workers
engaged by Sub-contractor any sum or sums payable by main contractor / sub-
contractor and which sum/sums the Corporation is required to pay in capacity of
Principal Employer on account of the default of contractor in respect of all
liabilities incurred out of noncompliance regarding any provisions of Labour Laws
and same amount shall be recovered from the pending dues of the contractor with
15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at
present and that may be famed by the G S E C L from time to time in connection
with contracts will be binding and acceptable to contractor.
The above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from time to time from
Statutory Authorities like State Government / Government of India, which the
contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as provided to
EW-371 PUR-F-006 RFQ-79155
other statutory Government authorities and will be notified to Engineer In-Charge
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour
Laws and EPF in CLIMS / prevailing system at relevant time.
Required documents shall be uploaded by the contractor in existing portal
/prevailing system at relevant time invariably each month to Engineer In-Charge
for onward process and smooth clearance by HR Department.
List of documents required for gatepasses of contract workers through clims
/ prevailing system
Sr No Description of documents attached
01 Copy of Work Order
02 Copy of P. F. Code No.
03 Insurance Policy as per subject of work order under the Workmen
Compensation Act,1923
04 Contract agreements/ subletting work contract documents with
05 Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
06 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to
submit "Declaration cum Indemnity Bond" on Rs. 300/- Non-Judicial stamp paper
in prescribed Performa (Annexure- "B") with Agreement and Indemnity Bond
before the commencement of the contract.
EW-371 PUR-F-006 RFQ-79155
DECLARATION CUM INDEMNITY BOND
( On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at…………………….(mention location) by
M/S……………………………. having its Reg. Office at
(hereinafter referred to as "Contractor" which expression shall unless it be repugnant to the
context or meaning thereof, be deemed to mean and include their respective assigns,
successors, executors, subcontractors and / or administrators) of the ONE PART in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at
.......................Therma1 Power Station (hereinaffer referred to as the "Company" ), which
expression shall unless it be repugnant to the context or meaning thereof be deemed to mean
and include its assigns, successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of
under order No: …………………………………..dated…………………….”hereinafter called the
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall
comply with all the provisions of the Labour & Industrial Laws, as may be applicable from
time to time for the discharge and completion of the works and completion of the Works and
Services covered under said Contract Labour (R & A) Act 1970, Child Labour (Prohibition and
Regulation) Act 1986, The Employees Provident Funds & Miscellaneous Provisions Act,1952,
Employees State Insurance Act 1948, Minimum Wages Act,1948, Payment of Bonus
Act,l965,Payment of Wages Acl,1936, Employees Compensation Act.1923, Factories Act,1948
and other Labour Laws, Rules, Notifications and Codes which are at present applicable to the
contractor and which may be applicable during the tenure of the contract (hereinater referred
as the 'Laws').
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond
to this effect and has agreed to indemnify and Company, it's D ire c tors, Officers and
employees and representatives indemnified and hold harmless against all third party claims,
charges ,penalties, fines, expenses ,losses, damages costs, suits or any other levy against the
EW-371 PUR-F-006 RFQ-79155
Company and/or the management due to the failure of the Contractor to observe or follow all
applicable laws.
NOWTHIS DEED WITNESSETH AS UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse,
delays, misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors,
subcontractor and / or administrators shall be construed to be have been done by the
contractor and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to the
condition of execution of this Declaration cum Indemnity bon{ the Contractor declares and
represents to the Company that the Contractor has obtained all Statutory registrations,
Certificates, licenses and approvals required under the Laws enabling the Contra ctor to
execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of non-compliance of any 'Laws' of the land by
the Contractor in connection with the Performance of the contract the Contractor shall bear
all the resultant liability (ies) whatsoever, if any and that the company , its Directors, Officers
and employees, representatives, shall not be liable for any such liability(ies). The Contactor
undertakes to indemnify and keep the Company and its Directors, Officers and employees,
representatives indemnifies, defend and hold harmless, against all losses, costs, damages,
claims, penalties, interest, expenses, demands, fines, legal liability, causes of action, injury
to persons, suits etc., which may be suffered, incurred, undergone and / sustained by the
Company including the Costs and expenses that may be incurred in defending any such
liability(ies) claim(S), Proceeding ( S) etc. that maybe made or taken or taken or arise on the
same by any Person, body, authority, government, judicial / quasi - judicial authority due to
the failure or non-compliance of any such laws and rules there under (including any
amendments in acts, laws, statutes & rules there under) of whatsoever kind and nature
arising out of or in any way connected with, whether or not such acts or omissions are actual
or alleged, active or passive with regard to the discharge of the said Contract.
4. The Contractor further declares that in case of any suit / claim/ right / damages /
compensation / fine / levy / charges / expenses / losses / penalties / costs raised by the
third party, including contract labours engaged by the contractor, he shall join such
proceedings in such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims,
suits, demands, decrees, expenses that the Company may suffer to the fullest satisfaction of
the Company and if the Contractor fails to make good the same then the Company shall have
EW-371 PUR-F-006 RFQ-79155
the right to recover the same from and or any other loss sustained, without any restriction or
limitation, together with any
other incidental expenses, costs, and all incidental logistic expenses etc that may be suffered
by the Company from the Contractor and the Contractor hereby further confirms and
declares that this Declaration cum Indemnity Bond is irrevocable and shall be final and
binding on him, his heirs, executors, administrators, legal representatives, successors,
subcontractors and assigns, wherever the context applies. any claims, demands, shall be
adjusted against any amount due and payable to the Contractor and the Company shall have
the right to withhold any amounts due and payable to the
Contractor, till the settlement of such claims, disputes to the Contractor towards discharge
of such claims, obligations etc.
This Declaration cum indemnity bond shall be in accordance with the laws of India and any
dispute between the parties with regard to this Declaration cum Indemnity Bond shall be
resolved through the dispute resolution process mentioned in the General Conditions of the
Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year
first hereinabove written.
SIGNED SEALED AND DELIVERED By the within named *CONTRACTOR"
(Authorised Signatory)
Rubber Stamp of Firm/Company
In presence of Witness
Name & Address of Witness Signature
Residential Address:
Residential Address:
The labour codes recently implemented by the Central Government of India shall
EW-371 PUR-F-006 RFQ-79155
become applicable to this contract as and when the same are notified and brought
into force by the Government of Gujarat, along with the Rules framed thereunder.
The Contractor shall ensure full compliance with all such applicable provisions,
including any amendments issued from time to time, and shall be solely responsible
for adherence to statutory requirements under the said Labour Codes and Rules. Any
financial or legal liability arising out to due to non-compliance shall be borne
exclusively by the Contractor, and GSECL shall stand fully indemnified in this regard
To ensure the successful implementation and operation of CLIMS, the following
guidelines are hereby issued.
1. CLIMS is a web-based system that can be accessed by agencies from any
location using a desklop, laptop, or mobile device.
2. To begin using the system, agencies must register by entering their EPO
(EUrja Order) number. All other necessary details are automatically fetched
from the E-Urja system.
3. The issuance of gate passes for contract labour is managed entirely
through CLIMS. Agencies can generate and track gate passes within the
4. In order to enable gate pass issuance, agencies are required to input and
upload the necessary details of their contract labourers into the system.
5. Once the required information is submitted, the gate pass approval
process is initiated and managed through the system. The request
automatically moves through the predefined workflow levels. Agencies can
monitor the real-time status of their gate pass applications via CLIMS.
6. Upon completion of all required approvals within the system, the gate
pass is issued to the agency.
B. Attendance and wages of workers:
1. Once contract workers gate passes are approved in the system, they are
required to be registered in Bio-Metric/Tace Reader Punching machines by
2. The attendance of all contract workers can be monitored and maintained
through CLIMS by contractors.
3. Access to data of Bio-Metric is given to agencies. It should be the duty of
agencies or his supervisor to ensure the supply of specified number of
manpower and to ensure their Bio-Metric punching and reporting at the
location of work.
4. Attendance register and wage register of the worker will be generated by
CLIMS from the login of agency only.
C. Compliance to various labour laws:
l. All the contractors have to comply various labour laws and they shall
submit the attached Declaration-cum indemnity Bond before staring of
work. This Bond may also be made part of ensuing tenders/contracts.
2. Contractors shall upload the CLIMS generated previous month
EW-371 PUR-F-006 RFQ-79155
attendance sheet, wage register duly signed by workers, wage bank
statement, ECR copy, PF Challan and Remittance slip.
3, The said submined documents in CLIMS will go to user department,
after verification of completeness of documents, user department will
forward it to HR Department for further verification and approval.
4. If the documents are complete, HR Department will approve in CLIMS
and send to Account Department for further process of bill.
5. If non-compliance is found in submitted documents, it will be returned
to user department in CLIMS with specific remarks and user department
will forward it to contractor for compliance. In such cases, 7 5Yo of the bills
may be released subject to a maximum ceiling of 20Vo of the contract
values. Such system of payment shall be allowed only for 3 monthly
Running Accounts (RA) bills (Maximum cumulative amount up to 20%o of
the contract value) of the contractor in a period contract (AMC) of
months or 6 RA bills in a period contract (BMC) of 24 months if there is
non-compliance. All other RA bills and specifically final bill shall not be
processed if the previous & current compliances are not made by
contractor. No such relaxation will be granted for non-periodic, one time or
overhauling type contract.
D. Special Case:
In case of work order issued for expert services to PSU or OEM/OES
following procedure may be adopted.
I. If officers / specialized manpower / expert Engineers from Govt / Semi
Govt Companies / PSUs / OEM / OEs/foreign experts are deployed for
short-term, specialized, or ad-hoc technical / consultancy services (e.g.,
commissioning. maintenance, consultancy or inspections), concerned
Engineer In-Charge (EIC) shall certify the same.
2. The EIC must obtain following documents from the concerned Govt /
Semi Govt Companies / PSUs / OEM / OES etc:
(D Declaration cum undertaking (As per Annexure-A) that visiting experts
are their regular employees with documentary proof; and
(ii) Declaration towards compliance of applicable labour laws.
The above documents shall be submitted along with the bill / Invoices by
EIC to HR department.
EW-371 PUR-F-006 RFQ-79155
Declaration-cum- Undertaking
This is to certify and declare that Shri [Employee's Full Name],
son/daughter of [Father's Name], is a permanent/regular employee of
[Company Name], employed in the capacity of [Designation]. His/Her
Employee identity Card is attached herewith for reference.
It is further declared that his/her Universal Account Number (UAN) under
the Employees'Provident Fund and Miscellaneous Provisions Act, 1952, is
[UAN Number] as applicable.
We hereby undertake and declare that:
1. We have complied with all applicable provisions of all the labour laws,
including but not limited to the Employees' Provident Fund and
Miscellaneous Provisions Act, 1952; the Employees ‘State Insurance
Act, 1948; the Payment of Wages Act, 1936; the Payment of Bonus
Act, 1965; the Contract Labour (Regulation and Abolition) Act, 1970;
the Minimum Wages Act, 1948; and other relevant labour and
industrial legislations, in respect of Shri [Employee's Full Name] as
applicable to us.
2. We further undertake to produce, as and when required, all statutory
records, registers, challans, and returns as proof of compliance to the
Gujarat State Electricity Corporation Limited (GSECL) or any other
statutory/government authority.
3. We hereby indemnify GSECL in respect of any civil or criminal liability
which may arise due to any non-compliance of the law of the land in
respect of our above-mentioned employee.
This Declaration-cum-Undertaking is issued in good faith and to the best of
our knowledge and belief and shall be binding upon us.
Authorised Signatory,
For [Company Name]
[Authorised Signatory Name]
[Seal/Stamp of Company]
[contact Details]
EW-371 PUR-F-006 RFQ-79155
EW-371 PUR-F-006 RFQ-79155
EW-371 PUR-F-006 RFQ-79155
47. MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by
EIC at site. The Contractor shall make all necessary arrangements at site to
mobilize labour, operators, divers and materials and maintain necessary number
of machinery and equipment, barge, pontoons etc., to guarantee the agreed rate
of progress of work as per schedule.
b) A detailed work schedule showing how he proposes to carry out the work,
specifically mentioning time periods as well as date of commencement and
completion of each activity and such approved schedules must be strictly
adhered to by the CONTRACTOR. After the owner has agreed with the schedule,
the Contractor shall prepare detailed program of each work front/activity
breaking it down giving daily quantifiable/measure of progress. The schedules
are to be reviewed periodically with the OWNER / ENGINEER to ensure that the
completion date will be met or to institute corrective steps (at no extra cost to the
ENGINEER) to adhere to the completion dates. The OWNER reserves the right to
revise the schedule at his discretion in order to keep up to the completion date
and to suit the project requirement and such alterations shall not entitle the
CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed
time limit mentioning date of commencement, activity to be carried with its time
period, starting & finishing event for each activity, completion of total project in
critical path etc, shall be jointly fixed and approved by the GSECL. Such
approved schedules must be strictly adhered by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare
detailed program of each work front / activity breaking it down to daily
quantifiable measure of progress. The schedules are to be reviewed periodically
with the Owner / E.I.C to ensure that the completion date will be met or to
institute corrective steps (at no extra cost to the GSECL) to adhere to the
completion dates. The Owner reserves the right to revise the schedule at his
discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the Contractor to any extra
e) The GSECL reserves the right to delete any item of schedule-B for which
contractor shall not have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for
lay out of work, which shall be maintained without disturbance by the
CONTRACTOR during the tenure of the contract. CONTRACTOR shall establish
local bench marks as directed by the ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the
written permission of the Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS or
his authorized representatives.
h) During the execution of the work if it is found that the work is not progressing as
per the scheduled program approved by the GSECL & planned by the contractor,
due to the reasons attributable to the contractor, suitable action shall be taken
as per Clauses in this tender elsewhere & other relevant clauses appearing in the
section of “Terms & condition of tender & works contract, Legal conditions of
works contract” of tender document. And the GSECL may also take such action
as it may deem fit to ensure that the work is completed in time at Risk and Cost
of the contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed
by the EIC, as and when required for review, discussion, coordination etc.
Attending these meetings shall be obligatory on the part of the Contractor, at no
cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no
damage is caused to the existing, pumps, existing works, service road, or any
other structure etc. For any damage to the existing structures of the GSECL, the
Contractor shall be held responsible and he will have to rectify the damage
immediately up to the satisfaction of Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site
clearance arranged according to the progress of work at site. Therefore, the
contractor has to organize & coordinate the work to suit these circumstantial
conditions. In the event of any delay due to the above or due to any other reason
EW-371 PUR-F-006 RFQ-79155
not attributable to the contractor, reasonable extension in completing the work
may be given at the discretion and as decided by the GSECL but no
compensation or idle charges will be payable to the contractor on this account or
any site conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any
circumstances. The corporation will not pay any type of advances including
mobilization advance
48. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of
GSECL or any public property due to negligence of contractor or any other
reasons attributed to contractor, the decision of E.I.C. regarding the amount of
recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the
time frame given, the GSECL shall get the work done through any other
contractor at the risk and cost of the contractor and the cost of execution of such
work along with 15% overhead charges shall be deducted from contractor’s
monthly bill over and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the
one in which the bill is prepared shall be made from bills approved for payment
every month or at other periods when the bills are prepared, for the various
items in the following order of priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any, to
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor’s behalf in labour
or materials in full.
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of
shortages found in balance or excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work in
full or the installment due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation’s rules.
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the Corporation
n) Other recoveries. (If any)
49. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-
The contractor shall proceed with the work with diligence and expedition and
the whole of the work herein specified as well as the mode of execution shall
be under the supervision and direction and shall be carried on to the entire
satisfaction of the Engineer-in-charge, who shall have full power to order the
contractor to alter, enlarge or diminish the form, dimensions, positions, or
quantities of any of the work or to make use of material and workman-ship of
different descriptions and qualities from this herein specified.
The whole of the works, together with any temporary works, associated
therewith, shall be carried on in the most substantial proper and mannered
workman like manner, with the best materials and workmanship and to the
entire satisfaction of the Engineer-in-charge and in such order of time as he may
direct. The contractor shall attend to and execute without delay all orders and
instruction which may from time to time be issued by the Engineer-in-charge.
50. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and
workmanship of best quality and strictly in accordance with the specifications
and with the drawings, or with such other drawings or written instruction as may
from time to time be furnished to the contractor, in accordance with terms of
this contract and shall be completed in every respect with all materials and
workmanship implied and necessary according to the fair interpretation and
meaning of the same and should there be any discrepancy between the drawings
and specifications or any difference or disputes as to the dimensions to be
worked to or the quality of the materials to be used, or the mode of doing
periodical quantity of the work to be executed or with respect to any subject
EW-371 PUR-F-006 RFQ-79155
arising out of this contract, the decision of the Engineer-in-charge shall be final
and binding on all parties. Rejected material shall be so disposed off as to obviate
any possibility of their use on works. The place, method and period of disposal
shall be as directed by the Engineer-in-charge.
51. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor
to the Engineer-in-charge in good time before the use of such material for
inspection and permission of testing if required. The samples shall be properly
marked to show the name of the material, manufacture, place of origin, and
place where to be used etc. Failure of any sample to pass specified tests will be
sufficient cause for the refusal to consider any further sample from the same
52. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified,
be responsible for the proper fencing, guarding, lighting and taking of the
necessary safety measures for all works comprised in the contract and or the
proper provision of temporary roadway, footways, guards fences, caution
notices etc. as far as the same may be rendered necessary by reasons for the
work for the accommodation and protection of workman foot passenger or
other traffic and of the owners and occupiers of adjacent property and of the
public and shall remain responsible for any accidents that may occur on
account of his failure to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be
maintained by the contractor throughout the tendency of the contract till
physical taking over of the work by the department.
53. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and
protect the work, and plant, and materials placed at his disposal or acquired
for him by the Corporation, from injury by exposure to the weather, or any
cause what so ever and shall take every reasonable proper timely and useful
precaution against accident or injury to the same from any cause and shall be
and remain answerable and liable for all accidents, or injuries thereto which until
the same be or be deemed to be, taken over by the Corporation, may arise or be
occasioned by the acts or omissions of the contractor or his workmen of
sub-contractors, and all losses and damages to the works or such plant or
material arising from such accidents or injuries as aforesaid shall be made good
in the most complete and substantial manner by and at the sole cost of the
contractor and to the reasonable satisfaction of the Engineer-in-charge. If the
contractor fails to make good such losses & damages within the time given by the
Engineer-in-charge, the Corporation shall be at liberty to recover the amount fixed
by the Engineer-in-charge for such losses or damages or any part thereof by
deducting it from any sum due by the Corporation to the contractor under this
contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant
and equipment that he may himself have procured for the execution of the work.
All reasonable requests of the Engineer-in-charge to enclose or especially protect
any of the above shall be expeditiously compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not
sufficiently protected by the contractor, he shall be entitled to arrange for such
protection at his unfettered discretion and recover the cost thereof from the
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor
shall also be liable for and shall be deemed to have indemnified the Corporation in
respect of all damage or injury to any person or any property of the Corporation or
of others, occasioned by the negligence of the contractor or his workmen, or his
sub-contractor, or by defective design, work or materials.
54.EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored
strictly in accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper
magazines which are required for the storage of explosive and arrange for proper
storage facilities for oils, fuels etc. for use in connection with the work.
EW-371 PUR-F-006 RFQ-79155
iii) The contractor shall at his own expense obtain such license or licenses as may be
necessary for strong and using explosives, oils, fuels etc. The department shall not
take any responsibility whatsoever in connection with the storage or use of
explosives on the site, or any accident or occurrence whatsoever in connection
therewith. All operation of the contractor in which or for which Explosives are
employed shall be at risk of contractor and upon his own responsibility.
55. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon
the site for the purpose of the work shall from the time of their being so brought
shall be deemed to be the property of the Corporation in its possession to be
used for the purpose of the work and for that purpose only and shall not on any
account be removed or taken away by the contractor or any other person
without the written permission of the Engineer-in-charge but the contractor
shall nevertheless be solely liable and responsible for and loss destruction
thereof or damage thereto. The Corporation shall have a lien on such
materials, tools and tackle for any sum of sums which may at any time prior to
the completion of the works be due or owing to the Corporation by the
contractor, under in respect of and dispose of any such materials, tools and
tackle in such manner as the Corporation may think fit and to apply the
proceeding in or towards the satisfaction of such sum or sums so due or owing
as aforesaid but subject to such lien and power of sale and disposal such
surplus materials, tools and tackle shall belong to the contractor and may be
removed and disposed off by him as he may think fit.
56. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit
from time to time enter upon any lands which may be in the possession of
the contractor under this contract, for the purpose of executing any work not
included in this contract and may execute such work not included in this
contract by agents, or by other contractors at his option and the contractor shall
in accordance with the requirements of the Engineer-in-charge, afford all
reasonable facilities for execution of the works including occupation of lands by
structure or otherwise for any other contractor employed by the Corporation
and his workmen or for the workmen of the Corporation who may be employed
in the execution on or near the site of the work not included in the contractor’s
any contract in connection with or ancillary to the works and in default, the
contractor shall be liable to the Corporation for any delay or expense incurred
by reason of such default. Provided always that if the exercise of those power
shall cause any damage to the contractor he may within fifteen days of such
damage arising make a statement of the same to the Engineer-in-charge who
shall from time to time assess the value in his Judgment of such damage and the
Corporation shall from time to time shall pay to the contractor the amounts (if
any accepted as justified) by the Engineer-in-charge. The contractor shall not
however, on account of any such modified, new or extra work executed by or for
the same of the Corporation be entitled to claim relief from the obligation to
execute other works.
57. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full
power to inspect the works, wherever in progress, either on the site, on the
contractor's premises or at the premises wherever situated, of any firm or
Corporation where work in connection with this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit
entry on site of work, any person except authorized agents of the Corporation of
the Engineer-in-charge or the contractor's staff and labour directly engaged on
and in connection with the work.
The contractor shall, during working hours, maintain supervisors having
sufficient training and experience to supervise the various items and operations
of the work and the said supervisors shall remain present during the inspections
of the Engineer-in-charge. All orders and directions given to such supervisors or
other staff of the contractor shall be deemed to have been given to contractor.
Further the Engineer-in-charge may be due notice, desire a higher ranking
EW-371 PUR-F-006 RFQ-79155
members of the supervisory staff of the contractor to be present on any specified
inspection and the contractor shall comply with such direction.
58. CLEANING UP
The contractor shall at all times keep the construction area and his power house
and storage areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from
and about the premises, and all tools, scaffolding, equipment and materials which
are not part of permanent structure. The premise will be left in a manner fully
satisfactory to the Engineer-in-charge, thereafter only the completion certificate
will be issued.
59. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials
temporary rolling stock, plant purchased or hired for use of employment or for
any of the purposed for this contract and such inventory or a copy thereof shall
at all times be available for inspection by the Engineer-in-charge. A complete
and up to date copy of the inventory shall be submitted to the Engineer-in-
charge in the beginning and once a year; thereafter changes in the interim
period, if any shall be communicated on every three months.
60. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all
appliances, materials, and plants which may have been loaned or hired to him
by the Corporation and make good all damages which may have occurred to
them, except such as shall be caused by fair wear and tear in execution of the
61. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer of
the order to start the work, a progress schedule in quadruplicate indicating the
date of start the weekly progress expected to be achieved and the anticipated
completion date of each major items of work to be done by him, also indicating
dates of procurement and setting up of materials, plant and machinery. The
schedule should be such as is practicable of achievement towards completion of
the whole work in the time limit and of the particular items on due dates
specified in the contract and shall have the approval of the Engineer. Further, the
dates for the progress as in this schedule shall be kept up-to-date. In case it is
subsequently found necessary to alter this schedule, the contractor shall submit
in good time a revised schedule incorporating necessary modifications proposed
and get the same approved by the Engineer. No revised schedule shall be
operative within such acceptance in writing.
Detailed schedules for each week showing the progress proposed to achieve
shall be submitted to the Engineer and got approved. The Engineer is further
empowered to ask for more detailed schedule or schedules any week by week, for
any items or items, and the contractor shall supply the same as and when asked
ii) The Engineer shall have, at all times the right without in any way vitiating this
contract, or forming grounds for any claim to alter the order of the works or any
part thereof and the contractor shall after receiving such direction proceed in the
order directed. The contractors shall also revise the progress schedule
accordingly and submit four copies of the revised schedule to the Engineer within
seven days of the Engineer's direction to alter the order of works.
iii)The contractor shall furnish sufficient plant equipment and labour and shall
work such hours and shifts as may be necessary to maintain the progress on the
work as per the approved progress schedule. The working and shift hours shall
comply with all GSECL's regulations in force and shall be such as may be
approved by the Engineer. They shall not be varied without the prior approval of
iv)The contractor shall from time to time as may be required by the Engineer,
furnish the Engineer, with a statement in writing of the arrangement he proposes
to adopt for the execution of this contract and the Engineer may if he considers,
necessary at any time advise alteration in the same, which the contractor shall
adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms,
EW-371 PUR-F-006 RFQ-79155
statement and/or reports as may be approved by the Engineer. Further, the
contractor shall submit four copies showing the progress of work in forms and
charts etc. at periodicals intervals as may be specified by the Engineer.
62. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works
and hand over them to the Corporation on or before the date specified in the
tender document including "Special Conditions" and save as herein provided, in
no circumstances whatever shall extend or alter the date for the completion of
works. Provided always that if in the opinion of the Engineer-in-charge the
completion of the works shall be delayed by any change of original design or
by the order of the Engineer-in-charge, of any altered, modified substituted or
additional works or materials omitted or by strikes, lock outs or stoppages of
labour, or revolution, riots, civil or political disturbance or by causes directly
due to war or by the contractor not being given possession of the site or any part
there-of or by the Corporation taking possession of and using the site or any
part thereof or the works or any part thereof, whether any nonperformance of
work under the powers herein contained or otherwise or by any
nonperformance of work or non-supply of materials to be performed or
supplied by the Corporation or by the contractor not receiving any orders,
drawings, instructions or directions in time or by the suspensions of the
works or by fire, flood exceptionally bad weather tempest, storm, or by from
unforeseen circumstances (and whether the same shall be due to any act or
omission of the Corporation or its agents or those in their respective service or
not) the Engineer-in-charge may, if in his unfettered discretion, he thinks fit
either forthwith or at any later time and from time to time not withstanding
that the prescribed or extended time for completion has expired or that the
work have been completed, by writing under his hand, extend the time for the
completion of the works to such date as he shall appoint. Provided always that
unless the contractor makes a written application to the Engineer-in-charge
within one month of the cause of delay and unless the time is extended by the
Engineer-in-charge, the prescribed time shall not be extended notwithstanding
delays from the aforesaid foregoing or any other causes of whatsoever kind.
63. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being
given over to responsible sub-contractors but Corporation shall under
no circumstances recognize these sub-contractors and the responsibility of
executing the work in the accordance with the conditions of contract will
entirely rest on the main contracts. The main contractors will therefore always
have the very responsible member, preferably a technical hand present on
the works with power to sign all work orders issued on the site of work and to
take requisite actions in the interest of very efficient execution of work.
However, the subletting of the contract can be made only with the prior approval
of the competent authority of the Corporation.
64. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR
CURTAILMENTS OF WORK
If during the tendency of the contract the Engineer-in-charge shall for any
reasons (which shall be unquestioned) whatsoever require the whole or any
part of the work as specified in the contract to be suspended for any period or
shall not require the whole or any part of the work as specified in the
contract to be carried out at all by the contractor, he shall give notice in writing
of the fact to the contractor who shall thereupon suspend or stop the work
totally or partially as the case may be. In any, case, except as provided
hereunder, the contractor shall have no claim to any payment or compensation
whatsoever on account of any profit or advantage which he might have derived
from the execution of the work in full but which he did not so derive in
consequence of the full amount of the work not having being carried out, or
on account of any loss that he may be put to on account of materials
purchased or agreed to be purchased or for unemployment of labour recruited
by him. He shall not also have any claim for compensation by reason of any
alterations having been made in the original specifications, drawings, designs
and instruction which may involve any curtailment of the work as originally
EW-371 PUR-F-006 RFQ-79155
contemplated. Where, however, materials have already been purchased or
agreed to be purchased by the contractor, before receipt by him of the
aforesaid notice, the contractor shall be paid for such materials at the rate
determined by the Engineer-in-charge, provided they would have been useful
for the work curtailed or stopped are not in excess of requirements, are of
approved quality and cannot be used on other contract works or otherwise by
the contractor and/or shall be compensated for the loss if any, that he may be
put to, in respect of materials agreed to be purchased by him, the amount of
such compensation to be determined by the Engineer-in-charge, whose decision
shall be final.
The Engineer-in-charge may grant extension of time for the execution of any item
or items of work affected by such suspension of work. The decision for the
Engineer-in-charge, regarding the granting of extension and the period thereof
shall be final. The Engineer-in-charge may order the contractor to suspend any
work on account of bad weather; rain or storm and such other adverse climate
conditions and the contractor shall comply with the same.
The contractor shall not be entitled to an compensation for such suspension of
work, concrete lining at the junctions of the different works under different
contract shall be done with particular care regarding forms, construction joints,
interconnecting reinforcement etc. If any and the joint planning of such work
shall be with prior approval of the Engineer-in-charge.
65. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be
simultaneous going on either departmentally or through agencies inside or
outside the power house. Each contractor or agency shall co-operate with
others to the fullest extent and shall allow to each other every facility and
co-ordination for execution of their works simultaneously and satisfactorily,
during their action of machinery or execution of any other co-ordination works of
the power house, the contractor will have to work only at places as directed
by the Engineer-in-charge. He will have some time to suspend his work partially
or totally in the interest of the work at large.
In such cases and at such time, he will be informed from time to time and
directed by the Engineer-in-charge where to work. He may also be required to
remove the scaffolding or to erect the scaffolding and shuttering in such a
manner as to be of little obstruction and inconvenience for erection of machinery.
In such cases he shall not be given any compensation on account of reduction or
stoppage or labour force or removal and reinstatement of scaffolding shuttering
etc. It will be seen that contractor is not put to unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each
contractor shall take into consideration the needs and requirements of the other
constructors, if any working in the vicinity. Further no contractor shall take or
cause to be taken any stops or action that may cause disruption, discontent
or disturbance to the work, labour of arrangements etc. or other contractors in
the neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his unquestioned
discretion may consider as infringement of the above code, would be considered
as a breach of the contract conditions and the Engineer-in-charge may take
such action as he may deem fit against the contractor and the action taken
shall be considered as final and binding.
66. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the
latest operative progress schedule but the Engineer-in-charge may at any time
with sufficient notice in writing direct the contractor to slow down any part or
the whole of the work for any reason (which shall not be question whatsoever,
and the contractor shall comply with such orders of the Engineer-in-charge.
The compliance of such orders shall not entitle the contractor to any claim or
67. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS
EW-371 PUR-F-006 RFQ-79155
All documents, correspondence, decisions and other matter concerning the
contract shall be considered as of confident and restricted nature by the
contractor and he shall not divulge or allow access there to any unauthorized
persons of any kind.
68. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the
actual cost for execution of any particular item of work of supply of plant or
material shall direct the contractor to produce the relevant documents such
as pay rolls records of personnel, invoices of materials and any other data
relevant to the item or necessary to determine its cost etc. and the contractor
to the aforesaid items in the mode and manner that may be specified.
69. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of their
bills or arrears whatsoever because of delay in payment by the Corporation.
Similarly they shall not be entitled for any interest on amount of bank
guarantees given by them. Non-payment of interest by the Corporation therefore,
shall not cause breach of contract.
70. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies
made, shall be subject to adjustment or final measurements. In case of
disagreement between such intermediate and final measurements, the latter
shall prevail. All works shall be measured, met by standard measure and
according to rules and custom and usual in the use in Gujarat State Electricity
Corporation Ltd., and no proposal to adopt alternative method will be accepted,
the Executive Engineer’s decision as to what is “the usual method in use in the
Gujarat State Electricity Corporation Ltd.” shall be final.
71. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the
agreements contained herein, shall annul this contract or discharge the
contractor from the observance and performance thereof, or of any part
thereof, but on application by the contractor and in the unfettered discretion of
the Engineer-in-charge an extension of time may be given to the contractor
in respect of such breach or non-observance by the Corporation.
72. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding machinery
equipment materials, labour personnel and other matters as may be specified by
the Engineer-in-charge. He shall further, submit returns of Performa and
details as may be specified by the Engineer-in-charge from time to time.
All local laws in force at the time of entering into the contract and those enacted
thereafter shall be binding on the contractor and he shall abide by the same.
All import duties, sales tax and other local taxes shall be borne by the
contractor and they shall be deemed to have been covered by this quoted
74. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on
emergency of the work with prior approval of Eng. - in- charge. 0n Sunday or any
other holidays work shall be continued in order to maintain progress with prior
permission of Eng.-in -charge. Such works shall not form any grounds for
complaint, compensation or extension of time limit.
If on the other hand, the Engineer-in-charge directs that the work shall be
proceeded with on days and during hours which are not permissible under
this contract, the contractor shall proceed with the work as directed without in
any way vitiating this contract or forming any grounds for compensation of
The contractor shall in his dealing with labour, atall times, during the period of
this contract, have due regard to local festivals and religious and other customs.
EW-371 PUR-F-006 RFQ-79155
A working day shall consist of two shifts each of eight hours, a working day shall
constitute any day on which in the opinion of the Engineer-in-charge, work can
be carried out in one or more shifts.
Final payment to the contractor shall not be made until the contractor shall
deliver to the purchaser or receipts in full in lieu thereof, and in either case, an
affidavit that so far he has knowledge or information the releases and receipts
include all the labour and material for which in lien could be filed. If any lien
remains unsatisfied after all payments are made, the contractor shall refund to
the purchaser all moneys that the latter may be compelled to pay in discharging
such a lien, including all costs and a reasonable attorney's.
76. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications
given in this document, the stringent specification shall be followed and under
such circumstances, the decision of the EIC shall be final and binding to the
2. The Notice inviting tender, general instruction to bidders and all other documents
of this tender shall form part of the contract
3. No receipt for any payment alleged to have been made by a Contractor in regard
to any matter relating to tender of the contract shall be valid and binding on the
Corporation unless it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at the
applicable rate.
5. Agency has to note that the extension of Time limit/excess saving in the works if
required to approve, than it shall be processed as per the provision of DoP and
will take time for process the same.
6. The contract is inclusive of the cost of materials required to complete the work in
7. It will be absolutely incumbent on the contractors to have on the site of work
only such of the materials as have been duly passed by the Engineer-in-charge.
Materials that have been rejected must on no account be allowed to remain on
the site, and in spite of written order to do so, any such rejected materials is on
the site beyond a period of 48 hours’ notice, the Engineer-in-charge shall have
the right to remove it, at the risk and cost of the contractors and even to destroy
8. It must be distinctly understood that conditions of contract and of claims in
respect of extra work, will not be allowed unless the works to which they relate
is clearly without the spirit and meaning of the specifications or unless such
works are ordered in writing by the Engineer-in-charge and claimed for in
specified manner.
9. Contractor will be asked to present the sample of materials, and the approved
samples will be preserved at the site of work, and no change in the approved
sample will be allowed, without the written permission of the Engineer-in-
10. The department reserves the right to make any change in the design and the
plans of the works. The contractor shall be bound to carry them out at the rates
tendered. No claim or compensation will be allowed on this account.
11. The contractor shall keep instruction book on site, for taking site instructions
from time to time. This book shall be made available on site whenever asked for.
12. Above construction equipment brought to site shall be allowed to be taken out
only after the work for which it has been brought is over. The equipment shall be
taken out only with the specific permission in writing from the E.I.C. Only the
equipment required for the work and in fit condition shall be brought to the site.
The Contractor shall ensure that proper documentation is followed at entry gate
of GSECL's premises for such items which shall be carried back by Contractor
after completion of work.
EW-371 PUR-F-006 RFQ-79155
13. The Contractor shall provide all temporary ladders, scaffolding materials,
platforms, supports and other necessary facilities required for trimming &
cutting of trees. The Contractor shall provide sufficient, strong and safe staging
so as to ensure safety of the laborers.
14. The Contractor shall provide sufficient fencing, notice Corporations and lights to
protect and warn others as may be considered necessary by the GSECL and
safety authority.
15. The GSECL may during the progress of work, order the removal of part or whole
of the work executed, found not in accordance with the approved drawings,
specifications/ instructions. No extra claims shall be entertained for re-
executing or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess
materials, scraps, debris, if any shall be removed and dumped by the Contractor
at place/places as designated by the GSECL. The Contractor shall also
dismantle and remove the staging and other temporary facilities like stores,
offices, labor camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to
normal routine requirement of own office. The records to be maintained shall
include but not limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as stipulated
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the
register and signed by the Site Engineer of the GSECL as well as
contractors' representative at site.
(j) Measurement Book.
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act has also
made works contract subject to Sales Tax. However works contract tax shall be
liability of the contractor and shall be born by the contractor. More ever you shall
also have to submit form No 702 as prescribed by Gujarat Sales Tax act while
submitting invoice.
More ever the purchaser will not pay any composite tax/turnover tax/works
contract tax which contractor has to pay as per act. Hence the incidence of sales
tax or such type of taxes shall not be payable by the purchaser in any case even
if such taxes are levied on the party/contractor at a future date.
Chief Engineer (Gen)
Signature Of Contractor
EW-371 PUR-F-006 RFQ-79155
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW-371 PUR-F-006 RFQ-79155
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred as
“Corporation”) of the work specified in the underwritten memorandum within the time
specified in Schedule B (memorandum showing items of work to be carried out) and in
accordance, in all respect, with the specifications, design, drawings and instructions in
writing and as per annexed conditions of contract and agree that when the materials for
works are provided by the Corporation, such materials and rates to be paid for them shall
be as provided in Schedule A hereto.
(a) General description of work : “Repairing & Renovation of Boiler lifts of Unit #
3, 4 & 5 from 0.00 mtr. to 58.00 mtr. at GTPS”
(b) Estimated amount Rs. : Rs.
(c) Earnest money : Rs.
(d) Security deposit : As per cl no.7 of Section C (i.e. General condition
(e) Time allowed for the completion of work from date of written order to commence.:
11 (Eleven) Months
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and
provision of the conditions of contract annexed hereto as applicable and in default thereof
forfeit and pay to the Corporation, the sums of money mentioned in the said conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. in respect of the sum of
Rs____________________________________. (The amount to be specified in figures and
words) is herewith forwarded representing the earnest money (the full value of which is to
be absolutely forfeited to the Corporation, should I / we do not execute / commence the
work after issuance of date of commencement by GSECL.
Signature of the Contractor:
Address of the Contractor:
Signature of Witness:
Address of the Witness:
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity
Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW-371 PUR-F-006 RFQ-79155
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory
like Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the
following Safety Rules. Concern principle contractors are responsible for informing &
observance of these rules by their supervisors/contract workers as well as the
owner/supervisors/ workers of sub-Contractors engaged, if any, by them for the work
contract awarded to them. Prior to commencement of the work, Contractor shall have to
submit a written assurance on their letterhead to the concerned Sectional Head / Engineer-
in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their sub contractor and will strictly observe the said Rules while
execution of work under work contract awarded to them. They will have to indemnify the
company for any loss or damage / accident / injury to the company’s property / employee
or employee of their own in default of non - observing these rules.
(01) Cont rac tor shoul d i ssue photo gat e pass for thei r wor kers fr om GS ECL
Factor y M anag er as per Gujarat Fact ories rul es , 1963 & det ail s sh all be
fill ed up in GSECL gat e pass f ormat as per Aa dh ar c ard /El ect ion car d i d
proof & t o f ol low t he ga te pass issue proc edure throu gh concern department
EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy.
Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer
only for three days with prior permission of Factory Manager only. More than three
days, Permanent photo gate pass procedure shall be completed by contract agency for
their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33
of Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for
all contractor workers before commencement of work & examination responsibility
shall be taken by contractor as well as concerned Head of Department .Pre-
employment & Periodical medical examination of contractor workers shall be carried
out in form no.32 from GSECL Factory Medical Officer after every six (06) months of
contractor with their contractor workers. Contractor shall be fulfilled all health
requirements before commencement of work. After completion of medical examination
in form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker
gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation
movie & Training record is to be maintained in IMS/OHSAS training format by TK
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked
the issue PPE to contract workers as per nature of job, Form no.10 of lifting tools and
tackles, Driving license, Electrical contractor license, Electrical trade qualifications,
Safety induction training, SOP, supervisor qualifications etc. After fulfillment of all
Safety compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract
worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is
awarded the work order. Subletting of contract shall be allowed only if prior approval
of Power station chief before execution of work. Contractor/agency shall be submitted
the entire subletting contract documents with gate pass application through concern
department EE & SE, LWO/DGM, Safety Officer/Dy.Safety Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
1956, Valid Electrical contractor License shall be submitted to concern electrical
department EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the
time of apply gate pass by agency/party with latest renewal from Chief Electrical
Inspector, Gandhinagar- Gujarat. Electrical License photocopy shall be checked by
Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety Officer/
Safety Officer/Factory Manager.
(08) As per natu re of jo b/work, qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by
contract agency & qualification certificate with experience certificate shall be submitted
EW-371 PUR-F-006 RFQ-79155
to concern EE/SE/LWO/IRO/DGM/ Dy.Safety Officer /Safety Officer/Factory Manager
at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry
out the work on electrical lines and Apparatus, Contract person/worker possesses a
certificate of competency or electrical work permit, issued by the Appropriate
Government. That means, Electrical trade Qualification of contract worker/person like
ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect)
shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety
Officer/Factory Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling
work /24X7 round the clock work/major shut down work, Qualified Safety
Officer/Manager/Supervisor (BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in
Industrial Safety) shall be engaged by contractor during dangerous
operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness programme, SOP preparation with hazards
& its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of
vehicles & to follow the Motor vehicle Act,1988, the Central Motor Vehicles
(Amendment) Rules,2016 as well as Gujarat Motor Vehicles rules,1989 & driver
license shall be checked every day by security shift in charge before entry in the
Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent
person as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years
experiences. SOP will review & approve by concern JE/DE/EE/SE/Elect. Safety
Officer/Dy. Safety Officer /Safety Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per
the job requirement. Do not work without use of required P.P.Es. Contractor is
responsible to provide standard make (ISI/DGMS/CE/EN/ANSI approved) & to
checked standard/make in PPE issue format by concern JE/DE/EE/SE/Safety
Officer/Factory Manager. Personal Protective Equipments / Safety Gadgets suitable to
give sufficient protection against hazards involved in their work / job to their staff, as
per the job requirement and insist / enforce their workers to put on the same while at
The ongoing work is liable to be stopped at any time if your contract workers/staffs
found working without P.P.Es. Following is the list of various P.P.Es (as per
ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety
Shoes, Safety Helmet, Safety goggles, Mask & Reusable Ear plug to their
workers/supervisor compulsory & it will check by concern section HOD & Dy.Safety
Officer /Safety Officer at the time of gate pass procedure.
Industrial Safety Helmet For protection of head against falling objects or during
fall of person from height. Yellow Colour helmet is
used for contract worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp
edged objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects, sharp
with edged objects, heat, hot metals/objects, electricity etc..
Oil/Chemical/water/heat/
Electrical resistance etc.
EW-371 PUR-F-006 RFQ-79155
Safety Belt(full body For fall prevention while working at heights or in depth,
hardness with double working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from 01 (one)
feet distance before starting the any electrical work .
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding visor
EN 12941:1998, class TH2 to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit provides
a constant airflow independent of filter combinations
and clogging. The unit can also be equipped with a gas
filter (for example A1B1E1). The unit supplies air to the
head top via the connecting breathing tube. The airflow
creates a slight positive pressure which together with
the sealing to the face prevents particles and other
contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and allotment
of PPE list shall be submitted to Safety Officer, Dhuvaran on his letter head as per
below mentioned format by Contractor before commencement of work through
concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desig Name of Name of PPE IS Make Qty Un Date Receivin
no. of natio Section :Code of it of g
worke n under no. of PPE issu signatur
rs work PPE e e
Safety Helmet No
Safety goggles No
Reusable Ear Pai
EW-371 PUR-F-006 RFQ-79155
Safety Shoes Pai
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety
Helmet of all contractor workers at entry gate of Factory Premises & shall entered
contractor workers with Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all
contractor workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should
always remain present at work site. Concern JE/DE of GSECL shall be supervised the
contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc measuring
/testing equipments/instruments which are used during contract work shall be
submitted before starting the work & shall be checked by concern JE/DE/EE before
starting work & it’s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of
work on dangerous substances, machineries or area at which cautionary notice is
displayed and obtain “Line Clear” or “Work Permit” through the concern Department /
Section JE/DE and shall be informed to concern section JE/DE for closed/ returned
after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern
JE/DE regarding hazards of specific work, risk & it’s control measure (mentioned in
HIRA) before starting the job work and records shall be maintained for each & every job
(21) Display Safety instructions shall be strictly followed by all workers who are working in
factory premises.
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by
contractor & contractor workers from Concern EE/Chief Chemist before starting of
chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed
vessel, sump, tank, pit or opening in ground or in floor which, by reason of its depth,
situation, construction or contents ,is or may be a source of danger before starting the
work each & every days or after interval/recess. Contractor supervisor shall be
informed to concerned HOD regarding any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses,
mobile phone etc are to be strictly followed by all workers who are working in factory
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job,
remove all the inflammable material lying at or nearby worksite or cover it properly by
suitable protective covering. Also, special care shall be taken before carrying out such
job & see that all possible contributing factors to set fire shall be removed / vanished
prior to commencement of the work. Advance intimation shall be given to concerned
section / fire section to commence the work in fire prone areas. They should also keep
ready all the First Aid Fire Extinguishers / equipments & fire extinguishing media /
material like sand / water buckets or other appropriate equipment at such place.
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined
Space / Vessel Entry Permit” from concerned department prior to commencement of
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp
shall be used. For taking care of the persons working inside the confined space /
vessel, a supervisor / person capable to keep continuous watch on person(s) working
inside, assist them in case of emergency or arrange to get immediate outside help, shall
remain present at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants
/ passers etc shall remain available near entry point or the entry point shall be
cordoned by a barricaded tape with a cautionary notice. After completion of the works,
all the lids / covers / grills / grits opened, shall be re-fixed / re-placed in the original
EW-371 PUR-F-006 RFQ-79155
position as it were prior to commencement of the work and leave the work place in safe
condition in all respect, so as to prevent accident to fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading
to plans or its auxiliaries, on which there is traffic movements or possible traffic
movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of
passage, prior permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading
tape & display suitable caution notice or keep a person to restrict / divert the traffic on
this route through other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading
to plans or its auxiliaries, on which there is traffic movements or possible traffic
movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of
passage, prior permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading
tape & display suitable caution notice or keep a person to restrict / divert the traffic on
this route through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines /
gadgets like welding machine, hand grinder, hand drill etc, ensure for its safe operation
& use it only if it is found safe to use. Do not use defective, unsafe or improperly
maintained equipments.
The electrical power supply required to run such equipments shall not be taken
directly at their own but shall be obtained through concerned Electrical Maintenance
Departments or their authorized persons or under their observations / guidance only.
The Electrical Section shall provide temporary electrical connection up to contractor’s
Mains Board on which it is compulsory to install mains switch, ELCB & fuses of
adequate capacity. All such equipments shall invariably be earthed adequately to
prevent electrical shock, sparking, short circuit etc. Power cord to be used shall be of
adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord
for three phase power connections. The plugs, receptacles, pins, holders etc shall be of
adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used
during work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has specific
prescribed life span shall not be used in any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by
Electrical contractor for safe use in areas where hazardous, flammable, or combustible
vapors, liquids, dusts, or residues may be present in Gas Based power plant and list of
tools and tackles shall be submitted with technical bid. Non-Sparking Non-Magnetic
electrical hand tools and tool kits shall be checked by JE/DE before commencement of
Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift,
mobile crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye
bolts or any fixtures), it shall be checked and used only if found safe to use. Also,
ensure that these are tested, examined & certified in form no.10 by Competent Person
as per the Factory act-1948 & Gujarat Factories Rules and its validity do not expire.
Further, it shall be fixed properly and firmly prior to lifting the weight. Valid Test
certificate of all Lifting machines used by Contractor to be submitted to Dy.Safety
Officer/ Safety Officer before commencement of work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity.
Obtain the work permit when working at height. While climbing on such scaffolding or
working on any structure at height, use of full body safety belt /full body hardness
with double lanyard & Fall arrestor & Helmet is compulsory. It is also necessary to
fasten chinstraps of the helmet.
EW-371 PUR-F-006 RFQ-79155
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities /
works except the work assigned to them, shall not loiter in the areas other than their
work jurisdiction, as well as shall not temper / operate / touch the
machineries/equipments/auxiliaries with which they are not concerned. Also, the
contractor shall strictly instruct their staff for not to sit or take rest at/near/below
running plants, auxiliaries, systems or any place which is risky, hazardous & prone to
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking
due care. To handle / shift such cylinders a special trolley /cage meant for it must be
used but in no case it should be rolled.
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour
generated area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall
be provided on each vehicle by party/agency and it will check by shift security in
charge before entry of vehicles in the factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-compound
area like battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a
prime mover or of any transmission machinery while the prime mover or transmission
machinery is in motion. Examination or operation of motion machinery shall be made
or carried out only by a specially trained adult male worker wearing tight fitting
clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work
Permit through concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the Fire Station
Mobile No as well as Station Fire Officer or Emergency Control room no which is
displayed at prominent place of factory like Main Security Gate, All unit control room,
Canteen area, Safe Assembly points, Fire Station, All security gates, Occupational
(40) In case of any injury / accident while working, it shall immediately be reported to
Safety Department through concerned Sectional Head / Engineer. The prescribed
Form No. 21 & ANNEXURE may be obtained from concerned section or Dy.Safety
Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety
Officer through concern Sectional Head / Engineer. The prescribed Electrical accident
form no. A as per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat
Factories rules shall be filled up by concern department JE/DE with written consent
of contractor. The Form may be obtained from concerned Electrical section or Electrical
Safety Officer. Electrical accident investigation shall be carried out by Electrical Safety
Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate
of injured person with endorsement of GSECL factory Medical Officer to
LWO/Dy.Safety Officer/Safety Officer/Electrical Safety Officer then after injured
person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as
per GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss
(42) Safety penalty shall be imposed against violation by contract workers: if any contract
worker worked in a factory contravenes any provision of factories act or any rules or
orders made there under. Imposing any duty or liability on workers,
contractors/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
EW-371 PUR-F-006 RFQ-79155
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job Rs.1000/-per day
like mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles Rs.2000/- per
(like C.P.Bs., Hook chooks, winch, forklift, mobile crane, equipment
EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures) in Form
No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working Rs.3000/-per person
at Height work, work without anchoring in hook/line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard/ Rs. 500/- per
machine guard equipment/ per set
(b) Unsafe welding machine like open body. Knob
without insulation. Connection without plug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial plug.
(f) Use of damaged electrical wire for
lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. etc
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. safety
officer. Electrical safety officer , factory manager, if they will observed any safety
violations as per CO circular/statutory requirements then they must imposed safety
penalty through office note directly against contract workers/contract agency and
Office Note process through proper channel to concern sectional head and Account
head for recovery purpose. Photograph/CCTV Footage is to be put a with penalty note
by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during
execution of work, total damage cost will be recovered from party RA bill and recovery
Office note put up by concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod
pieces, scrap etc. are to be removed by contractor and scrap shall be deposited to scrap
yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident
& near miss accident will be considered. Steps can be taken to review the job
assignment up to cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the
provisions of The Factories Act-1948 & the Gujarat State Factories Rules-1963
(Amended up to date), The Electricity Act-2003 & rules, BOCW Act/Rules shall be
followed strictly. The contractor shall also obey the rules / regulations / instructions of
the local Competent Authority for safety & health requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor
/contractor workers may contact to the Dy.Safety Officer/Safety Officer/Electrical
Safety Officer in case of any ambiguity or needs further guidance in this regard.
EW-371 PUR-F-006 RFQ-79155
Chief Engineer (Gen)
Signature Of Contractor
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
EW-371 PUR-F-006 RFQ-79155
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of Tender)
We, Bank of ______________________________________________ hereby agree unequivocally
and unconditionally to pay immediately on demand in writing from the Gujarat State
Electricity Corporation Limited, or any Officer authorized by it in this behalf any amount up
to and not exceeding Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of________________ and shall not be terminable by notice or by change in the constitution of
the Bank or the firm of Contractors / Suppliers or by any other reason whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge or
consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL or Subsidiaries). Notice or invocation by any person such as assignee, transferee or
agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee
can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee
is restricted to Rs._______________ (Rupees
_______________________________________________________ only). Our guarantee shall remain
in force until _______________ (date of validity of the Guarantee). [Unless demands or claims
under this Bank Guarantee are made to us in writing on or before _____________ (date of
validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be
forfeited and we shall be released and discharged from all liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank’s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW-371 PUR-F-006 RFQ-79155
List of Banks for acceptance of Bank Guarantee as security deposit(SD)/ EMD :
As per Finance department GR No: FD/MSM/e-file/4/2025/2712/DMO dt: 01.04.2026
A) As per the Government Resolution issued by the Finance Department, Government of
Gujarat, Bank Guarantees accepted towards Security Deposit and Earnest Money
Deposit shall be from the institutions listed below.
B) Guarantees issued by the following banks will be accepted as SD/EMD for the period
up to March 31, 2027. The validity cut-off date in the GR is with respect to the date of
issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
2. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. Federal Bank
15. IDFC First Bank
16. Indusland Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnadu Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Operative Bank
29. Nutan Nagrik Sahakari Bank Ltd.
30. Rajkot Nagrik Sahakari Bank Limited.
31. Sarswat Co-Operative Bank Ltd.
32. SBPP Co-operative Bank LTD
33. SVC Co-Operative Bank Ltd.
34. The Cosmos Co-op Bank Ltd., Baroda
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Baroda Central Co-Operative Bank
39. The Panchmahal District Co-operative Bank
40. The Kalupur Commercial Co-operative Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercantile Co-operative Bank
43. Gujarat Gramin Bank
EW-371 PUR-F-006 RFQ-79155
EMD BANK GUARANTEE FORMAT
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm’s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender
Erection / Supply & Erection / Work) of __________________________________ (Name of the
material / equipment / work) for _________________________ Gujarat State Electricity
Corporation Limited and WHEREAS a Bank Guarantee for (hereinafter called the
“Beneficiary”) Rs. _____________ (Amount of EMD) valid till ____________ (mention here date
of validity of this Guarantee which will be 4 (FOUR) months beyond initial validity of
Tender’s offer) which is required to be submitted by the Tenderer along with the Tender.
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our
registered Office at _____________________ (Address of Bank’s registered Office) hereby give
this Bank Guarantee No. _________________dated ____________ and hereby agree
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited or any Officer authorized by it in this behalf
any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat State
Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-
submission of Security Deposit by the Tenderer within one month from the date of tender
or a part thereof has been accepted by the Gujarat State Electricity Corporation Limited
would constitute a default on the part of the Tenderer and that this Bank Guarantee is
liable to be invoked and encased within its validity by the Beneficiary in case of any
occurrence of a default on the part of the Tenderer and that the encased amount is liable to
be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive
of____________________ (mention here the date of validity of Bank Guarantee) and shall not
be terminated by notice or by Guarantor change in the constitution of the Bank or the Firm
of Tenderer or by any reason whatsoever and our liability hereunder shall not be impaired
or discharged by any extension of time or variations or alterations made, given, conceded
EW-371 PUR-F-006 RFQ-79155
with or without our knowledge or consent by or between the Tenderer and the Gujarat
State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL or Subsidiaries). Notice or invocation by any person such as assignee, transferee or
agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee
can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is
restricted to Rs. ________ (amount of EMD) (Rupees
________________________________________ (in words). Our Guarantee shall remain in force
till _____________ (date of validity of the Guarantee). Unless demands or claims under this
Bank Guarantee are made to us in writing on or before ___________ (date of validity of the
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW-371 PUR-F-006 RFQ-79155
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
To create an environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of goods
and services and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and from outside GSECL to influence its
professions. decision..
Ensure maximum transparency to Not to use intimidation, threat,
the satisfaction of stakeholders. inducement or pressure of any kind on
GSECL OR ANY OF it’s employees
under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement/contract and to consider fulfilling the contract, agreement, legal
objectively the view point. obligations.
To ensure regular and timely To provide goods and / or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
To ensure that no improper demand To abide by the general discipline to be
is made by employees or by anyone maintained in our dealings.
To give maximum possible To be true and honest in furnishing
assistance to all the information.
Vendors/Suppliers/Service Provider
and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information,
suppliers/contractors relating to business details available during the
contract / job which facilitate him course of business relationship to
to complete the contract / job others without the written consent to
successfully in time. GSECL.
To ensure minimum hurdles to Not to enter into carter / syndicate
vendors / suppliers / contractors in /understanding whether formal / non
completion of agreement / contract formal so as to influence the price.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
EW-371 PUR-F-006 RFQ-79155
On Firm’s Letter Head
CERTIFICATE - A
I / We ________________________________________________ authorized signatory of
M/s. _____________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
With Designation
Seal of the Firm
EW-371 PUR-F-006 RFQ-79155
GENERAL GUIDELINES RELEVANT TO I.S.
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
EW-371 PUR-F-006 RFQ-79155
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code i.e.
B.I.S. General relevant I.S. of B.I.S. shall prevail for all items including
materials, measurements etc.
The Item wise detailed specifications are intended for full description of items
covered by Schedule “B”. The specifications are not however intended to cover
every detail and the works shall be executed according to the spirit of the
specifications below and the best prevailing P.W.D. practice. The clarification to
any clause in detailed specifications shall be sought from the latest edition of
relevant I.S. specification and codes. Where these specifications are at variance
with the specification laid down in the I.S. Books stated above, the former will
be applicable. As regarded matters not covered by any of the above
specification, the decision of the Engineer-in-charge shall be treated as final
and shall be binding upon the contractor. The contractor is expected to get
clarified any doubt about specification, etc. before tendering by discussing with
Engineer-in-charge.
For detail technical specification, the item wise description along with above
general specifications shall hold good.
Chief Engineer (Gen)
Signature Of Contractor
EW-371 PUR-F-006 RFQ-79155
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – ‘B’ is inclusive of cement cost. Contractor has to
purchase fresh 43 grade cement confirming to as per IS 8112 Or PPC IS
(Part-I) or as per tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags
can be properly preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain
progress of work. The work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as
per item proportion.
5 To bring sufficient & timely cement at site is full responsibility of contractor.
Nothing extra will be paid on account of any reason to maintain progress of
work and to complete the work in schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with
every bills. In case of not submitting the same, bill will not be passed. Party
has to submit the copy of cement purchased bill and Challan/invoice along
with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then
prescribed as per R & B SoR OR Corporation/mix design and nothing will be
paid extra for over consumption.
8 Contractor is fully responsible for safety of cement at site; nothing will be paid
extra on account of safety.
9 If Corporation’s authorized representative wants to check cement stock at site,
contractor has to allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account
11 As far as possible, contractor has to maintain supply of cement of only one
brand & grade throughout the work and on account of closer/shortage of
approved brand, cement of other brand in accordance of condition No. (1) Will
be allowed by Engineer – in – Charge.
12 Minimum cement consumption considered for cement concrete having grade of
M–15 / M – 20 / M – 25 is 320 Kgs. / 375 Kgs / 400 Kgs. respectively.
Contractor has to use minimum cement as above. Contractor should not use
less than the prescribed quantities of cement even in the case of mix design
recommends lower quantity. For other items cement consumption shall be as
per provisions of SoR without any negative variation. Nothing will be paid extra
for over consumption.
13 Contractor will be allowed to carry out work only after physical verification of
cement brought at site.
14 Full cement bags brought by contractor shall be entered at IN GATE of
respective security cabin / gate at Gandhinagar, TPS.
Signature Of Contractor
EW-371 PUR-F-006 RFQ-79155
Approved Name of Firms of Manufactures of Civil Items Allowed to use being supplied
by contractors in civil works.
Sr. Name of approved Vendor List of Company & their Brand Name in
1 A.C.C. Cement A.C.C.
2 Ambuja Cement Ambuja
3 Ultratech Cement (L&T) Ultra-tech
4 Birla Cement Birla A-1
5 J.K. Cement J.K.
6 J.K. Laxmi Cement J.K. Laxmi
7 India Cement Corromandal King
8 Sanghi Cement Sanghi
9 Shree Digvijay Cement (SDCC) KAMAL
10 Wonder Cement Ltd., Rajasthan Wonder, Wonder Xtreme, Wonder
11 HI-BOND Cement Plus
12 Shree Cement Limited Shree/Bangur/Rock
Strong/Roofon/Bangur Power
13 Midland Concrete Pvt. Ltd., Rajkot SOLID
Construction Chemicals
1 RedWop Chemicals Rajkot
2 Samrock Chemicals Ahmedabad
3 MAPEI Construction Products India Pvt Vadodara
Krishna Conchem Products Pvt Ltd., Navi Mumbai
5 Ultra Tech Cement Limited, Mumbai, Wada
(Building Product Division).
6 Asian Paints Ltd. (Construction Chemicals Ankleshwar
7 Prashita Associates L.L.P.,Por, Vadodara FAIR MATE
Water Proofing &Wrapping Coating
1 Bitumag Industries Vadodara
2 A.R. Industries Vadodara
3 Tiki Tar Danosa (India) Pvt. Ltd. Halol
4 STP Ltd., Ankleshwar
1 Asian Granito Tiles Sabarkantha
2 Somany Kaloal
3 Simpolo Morbi
4 Varmora Morbi
5 Sunheart Morbi
7 Casagres Morbi
Astral Limited, Ahmedabad ASTRAL
1 Tata Iron & Steel Co. Ltd Bars TATA
2 Jindal JINDAL
3 Lloyds Lloyds
4 Essar Steel Ltd. Essar
EW-371 PUR-F-006 RFQ-79155
5 Steel Authority of India. SAIL
6 Parmeshwar Steel Pvt ltd. God TMT
7 Gallant Ispat Ltd. Gallant TMX
8 Aditya Ultra Steel Pvt. Ltd. KAMDHENU NXT & Kay 2 TMT
9 Mono steel India Ltd. MONO TMT
10 Aashiana Rolling Mills Ltd. Friends Steel
11 Electro Therm (I) Ltd. ET TMT
12 H.K. Ispat .Pvt. Ltd. Kothi
13 SRJ Peety steel Pvt. Ltd. SHREE OM TMT/SRJ
TMT/KAPILA PURE STEEL
14 Nilkanth Concast Private Limited Nilkanth
15 Shreeyam Power & Steel Industries Limited National
16 Utkarsh Bars Private Limited Utkarsh
17 Bhagyalaxmi Rolling Mill Pvt. Ltd POLAAD QST/TMT
18 Shri Khatu Shyam Alloys Pvt. Ltd., Khatu TMT
19 Steefo Steels LLP, Ahmedabad STEEFO TMT
20 Haq Steel & Metaliks Ltd.,Kutch GERMAN TMX
21 K.B. Ispat Private Ltd., Bhavnagar KB TMT
22 VMS TMT Private Ltd., Ahmedabad KAMDHENU NXT & Kay 2 TMT
23 Briskon Multimetals LLP, Briskon TMT
24 Kalika Steel Alloys Pvt. Ltd., Jalna KALIKA 500 TMT
25 Anjar TMT Steel Pvt.Ltd.,Anjar Welspun Shield
26 Shri Bajrang Power & Ispat Ltd. Goel TMT & Pipes
27 Rajuri Steels &TMT Bars Pvt. Ltd. Rajuri Steel
28 SMW Steel Sangam
29 Rathi Steel & Metal Pvt. Ltd. Icon Steel
30 Metarolls Ispat Pvt. Ltd. Metarolls TMT
31 Sai Bandhan Infinium Pvt. Ltd., BANDHAN TMX
32 Gajkesari Steels & Alloys Pvt. Ltd GAJKESARI TMX
33 Rudra Global Infra Product Ltd., RUDRA TMX
Varrsana Ispat Ltd.,Gandhidham VARRSANA TMT
35 N.N. Ispat Pvt. Ltd., West Bengal ULTRAMAX TMT
36 Jay Bharat Steel Corporation, Kutch JAY BHARAT TMX &
37 Jaideep Ispat & Alloys Pvt Ltd, Indore MOIRA CRS &TMT
38 R S VIRLA Pvt Ltd, Rajkot R S VIRLA TMT & R STMT
39 Bindra Steel Pvt. Ltd, Jalna ROOPAM TMT
40 Rashmi Metaliks Ltd, Kolkata, W.B. RASHMI TMT
41 Vinayak TMT Bars VINAYAK TMT
Pvt.Ltd.,Gandhinagar
42 MS Agarwal Foundries Pvt. Limited, AF STAR TMT
In addition to the above Approved Vendor List of GSECL, the approved vendor list of
GUVNL and its subsidiary company i.e. GSECL/GETCO/MGVCL /PGVCL/DGVCL &
UGVCL which are available on their website- in tender head including above mention
various manufacturers are also to be treated as Approved Vendors.
(Gen) Signature Of Contractor GSECL:
EW-371 PUR-F-006 RFQ-79155
GUJARAT STATE ELECTRICITY CORPORATION LTD
GANDHINAGAR THERMAL POWER STATION
GANDHINAGAR-388239
Name of Work “Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from
0.00 mtr. to 58.00 mtr. at GTPS.”
DEVIATION FROM BIDDER (IF ANY)
1. GSECL does not bind to accept the deviation offered by bidder for evaluation of tender.
2. If there is any deviation from bidder, it should be clearly mentioned on this page.
3. Deviation mentioned on other page should not be considered and order will be placed
according to the tender documents.
4. If there is no any deviation from bidder, than it must be clearly mentioned in this page
“NO DEVIATION OFFERRED”
Signature of the Contractor
EW-371 PUR-F-006 RFQ-79155
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Name of Work “Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from
0.00 mtr. to 58.00 mtr. at GTPS”
(UNDERTAKING IN REGARD TO STOP DEAL / BLACK
All Bidders will have to furnish the following Undertaking duly filled in, signed and
stamped for each quoted item of the Tender along with the Technical Bid.
Sub:- Undertaking in regard to Stop Seal / Banned for Business Dealing / Black List
Ref:- Tender No:
And their proprietor / any partner / any directors of the firm is not stop deal and/or
banned for business dealing and/or black listed by GUVNL and/or their any
subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL”.
Seal of the Firm.
Signature of the Tenderer.
EW-371 PUR-F-006 RFQ-79155
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAILED TECHNICAL SPECIFICATION.
EW-371 PUR-F-006 RFQ-79155
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as
directed”/”approved” by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it shall be
taken to mean as a reference to the latest edition of the same in force on the date of
03. In “Mode of Measurement” in the specification wherever a dispute arises in the absence
of specific mention of a particular point or aspect, the provisions on these particular
points or aspects in the relevant Indian Standards shall be referred to.
04. All measurements and computations, unless otherwise specified, shall be carried out as
05. The distance which constitutes lead shall be determined along the shortest practical
route and not necessarily the route actually taken. The decision of the Engineer-in-
charge in this regard shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth level.
09. Definite particulars covered in the items of work, though not mentioned or elucidated in
it, specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the items
of work is in the form of a designation containing the number of the specification of the
material and prefix ‘M’ e.g. ‘M-5’.
11. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on
site or materials used in the work found defective at a later date. The contractor shall
have no claim to any payment or compensation whatsoever on account of any such
materials being rejected by the Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-
14. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stored in such a manner as to prevent damage, deterioration or
intrusion of foreign matter and to ensure the preservation of their quality and fitness for
15. Cement, reinforcements bars & all other materials to be used shall be got approved from
EIC before starting of work. The cement, reinforcement steel & other materials to be
brought at site shall be entered at GANDHINAGAR, TPS main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in such a
way as to cause or lead to damage or overloading of the various components of the
18. All works shall be carried out in a workmanlike manner as per the best techniques for
the particular item.
19. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works during execution shall be kept in
sufficient numbers and in good working condition on the site of the work.
20. The mode, procedure and manner of execution shall be such that it does not cause
damage or over loading of the various components of the structure during execution or
after completion of the structure.
21. Special modes of construction not adopted in general Engineering practice, if proposed
to be adopted by the Contractor, shall be considered only if the contractor provides
satisfactory evidence that such special mode of construction is safe, sound and helps in
speedy construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer-in-charge shall not, however, absolve the
contractor of the responsibility of any adverse effects and consequences of adopting the
same in the course of execution of completion of the work.
EW-371 PUR-F-006 RFQ-79155
22. All installations pertaining to water supply and fixtures thereof as well as drainage lines
and sanitary fittings shall be deemed to be completed only after giving satisfactory tests
by the Contractor.
23. The contractor shall be responsible for observing the rules and regulations imposed
under ‘Minor Minerals Act’ and such other laws and rules prescribed by Government
from time to time.
24. All necessary safety measures and precaution [including those laid down in the various
relevant Indian Standards shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless recovery at
one percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves the
contractor of his responsibility for the correctness, soundness and strength of the
structure as the drawings and specification.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW-371 PUR-F-006 RFQ-79155
TECHNICAL SPECIFICATIONS
NAME OF WORK: ““Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from
mtr. to 58.00 mtr. at GTPS” .”
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved”
by the Engineer-in-charge.
02. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or aspects
- the relevant Indian Standards shall be referred to.
03. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
a. Length, width and depth (height) -----------0.01 Meter.
04. The distance which constitutes lead shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
05. Where no lead is specified, it shall mean “all leads”.
06. Lift shall be measured from plinth level.
07. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and prefix
08. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any payment
or compensation whatsoever on account of any such materials being rejected by the Engineer-in-
09. The contract rate of the item of work shall be for the work completed in all respects.
10. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
11. Collection of approved materials shall be done at site of work in a systematic & sequential
manner. Materials shall be stored in such a manner as to prevent damage, deterioration or intrusion
of foreign matter and to ensure the preservation of their quality and fitness for the work.
12. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
14. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory evidence
that such special mode of construction is safe, sound and helps in speedy construction and
completion of work to the required strength and quality. Acceptance of the same by the Engineer-in-
charge shall not, however, absolve the contractor of the responsibility of any adverse effects and
consequences of adopting the same in the course of execution of completion of the work.
15. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
16. The contractor shall be responsible for observing the rules and regulations imposed under
‘Minor Minerals Act’ and such other laws and rules prescribed by Government from time to time.
17. The testing charge of all materials shall be borne by the Contractor & reports of authorize
laboratory shall be submitted timely.
18. Approval to any of the executed items for the work does not in any way relieves the contractor of
his responsibility for the correctness, soundness and strength of the structure as per the drawings
and specification.
19. Due care at all the items shall be taken to see that no damage is caused to the existing setup of
GSECL. In case of any such damage is caused, it shall be restored by the agency at his own cost.
20. Schedule of working shall be so arranged that maximum outcome is achieved in working hours.
EW-371 PUR-F-006 RFQ-79155
DETAILED TECHNICAL SPECIFICATION
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS”
OF R. & B. DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION
FOR CIVIL WORKS” OF GSECL WILL BE AVAILABLE IN CIVIL OFFICE AT GANDHINAGAR
TPS FOR REFERNCE OF RELEVANT DETAIL SPECIFICATIONS OF ITEMS. SHALL BE
CONSIDERED & ADOPTED IN WORK.
NAME OF WORK: ““Repairing & Renovation of Boiler lifts of Unit # 3, 4 & 5 from
mtr. to 58.00 mtr. at GTPS”
GENERAL SPECIFICATIONS
27. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved” by
the Engineer-in-charge.
28. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
29. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points or aspects in the
relevant Indian Standards shall be referred to.
30. All measurements and computations, unless otherwise specified, shall be carried out as per Latest
31. The distance which constitutes lead shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
32. Where no lead is specified, it shall mean “all leads”.
33. Lift shall be measured from plinth level.
34. Up to “floor two levels” means actual height of floor up to 11.0 Mt. Above plinth level.
35. Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specification shall be deemed to be included therein.
36. Reference to specifications of materials as made in the detailed specification of the items of work is
in the form of a designation containing the number of the specification of the material and prefix
37. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used
in the work found defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the Engineer-in-
38. The contract rate of the item of work shall be for the work completed in all respects.
39. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
40. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter
and to ensure the preservation of their quality and fitness for the work.
41. Cement, reinforcements bars & all other materials to be used shall be got approved from EIC before
starting of work. The cement, reinforcement steel & other materials to be brought at site shall be
entered at Gandhinagar TPS main entry gate.
42. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
43. No materials shall be stored prior to, during and after execution of a structure in such a way as to
cause or lead to damage or overloading of the various components of the structure.
44. All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
45. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
46. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
47. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory evidence
that such special mode of construction is safe, sound and helps in speedy construction and
completion of work to the required strength and quality. Acceptance of the same by the Engineer-
in-charge shall not, however, absolve the contractor of the responsibility of any adverse effects and
consequences of adopting the same in the course of execution of completion of the work.
48. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
EW-371 PUR-F-006 RFQ-79155
49. The contractor shall be responsible for observing the rules and regulations imposed under ‘Minor
Minerals Act’ and such other laws and rules prescribed by Government from time to time.
50. All necessary safety measures and precaution [including those laid down in the various relevant
Indian Standards shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
51. The testing charge of all materials shall be borne by the Contractor unless recovery at one percent
towards using charges is separately made.
52. Approval to any of the executed items for the work does not in any way relieves the contractor of
his responsibility for the correctness, soundness and strength of the structure as the drawings and
SPECIFICATIONS OF MATERIALS
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other
deleterious material which will either weaken the mortar or concrete or cause efflorescence or attack
the steel in R.C.C Container for transport, storage and handling of water shall be clean. Water shall
conform to the standards specified I.S 456-1978.
1.2 If required by Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than 10 per cent in strength of mortar prepared
with water sample when compared with the results obtained with mortar prepared with distilled
water shall be sufficient cause for rejection of water under test.
1.3 Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be
free of elements which significantly affect the hydration reaction or otherwise interfere with the
hardening of concrete during curing or those which produce objectionable stains or other unsightly
deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
Potable water will be generally found suitable for curing mortar or concrete.
Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per
6.1 Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic
matter, loam, mica or other deleterious substance and shall be got approved from the Engineer-in-
charge. The sand shall not contain more that 8 percent of silt as determined by field test. If
necessary the sand shall be washed to make it clean.
6.2 Coarse Sand: The fineness modulus of coarse sand shall not be less than 2.5 and shall not
The sieve analysis or coarse shall be as under:
I.S. Sieve Percentage by I.S. Sieve Percentage by
Designation weight Designation weight
Passing sieve Passing sieve
6.3 Fine Sand: The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be
I.S. Sieve Percentage by I.S. Sieve Percentage by
Designation weight Designation weight
Passing through Passing through
M-8 Stone Grit:
8.1 Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall
generally be cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall
generally comply with the provisions of I.S. 383-1970. Unless special stone of particular quarries is
mentioned, grit shall be obtained from the best black trap or equivalent hard stone as approved by
the Engineer-in-charge. The grit shall have no deleterious reaction with cement.
8.2 The grit shall conform to the following gradation as per sieve analysis :
I.S. Sieve Percentage I.S. Sieve Percentage Passing
EW-371 PUR-F-006 RFQ-79155
Designation Passing Designation Through sieve
8.3 The crushing strength of grit will be such as to allow the concrete in which it is used to built up
the specified strength of concrete.
8.4 The necessary tests for grit shall carried out as per the requirements of I.S.2386 (Parts I to VII)
1963, as per instructions of the Engineer-in-charge. The necessity of test will be decided by the
Engineer-in-charge.
M-11. Cement Mortar:
11.1 Water shall conform to specification M-1. Cement :Cement shall conform to specification M-
Sand :Sand shall conform to M-6.
11.2 Proportion of Mix : 11.2.1 Cement and sand shall be mixed to specified proportion, sand
being measured by measuring boxes. The proportion of cement will be by volume on the basis of
Kg./Bag of cement being equal to 0.0342 Cu. M. The mortar may be hand mixed or machine mixed
11.3 Preparation of Mortar: 11.3.1 In hand mixed mortar cement and sand in the specified
proportions shall be thoroughly mixed dry on a clean impervious platform by turning over at least
times or more till a homogenous mixture of uniform color is obtained. Mixing platform shall be so
arranged that no deleterious extraneous material shall get mixed with mortar or mortar shall flow
out. While mixing, the water shall be gradually added and thoroughly mixed to form a stiff plastic
mass of uniform color so that each particle of sand shall be completely covered with a film of wet
cement. The water cement ratio shall be adopted as directed.
11.3.1 The mortar so prepared shall be used within 30 minutes of adding water. Only such quantity
of mortar shall be prepared as can be used within 30 minutes.
M-12 Stone Coarse Aggregate for Nominal Mix Concrete:
12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard,
strong, dense, durable, clean and free from skin and coating likely to prevent proper adhesion of
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular quarries
are mentioned aggregates shall be machine crushed from the best black trap or equivalent hard
stone as approved. Aggregate shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement concrete shall generally be as
per the table given below, However in case of reinforced cement concrete the maximum limit may be
restricted to 6 mm. Less than the minimum lateral clear distance between bars or 6 mm. Less than
the cover, whichever is smaller.
I.S. Sieve Percentage passing for I.S. Sieve Percentage passing for
Designation single sized aggregates of Designation single sized aggregates of
nominal size Nominal size
Note: This percentage may be varied somewhat by Engineer-in-charge when considered necessary
for obtaining better density and strength of concrete.
The grading test shall be taken in the beginning and at the change of source of materials. The
necessary test indicated in I. S. 383-1970 and I.S. 456-1978 shall have to be carried out to be
carried out to ensure the acceptability. The aggregates shall be stored separately and handled in
such a manner as to prevent the intermixing of different aggregates. If the aggregates are covered
with dust, they shall be washed with water to make them clean.
M-13.Blak Trap or Equivalent Hard Stone Coares.
13.1. Aggregate For Design Mix Concrete : Coarse aggregate shall be of machine crushed stone of
equivalent hard stone and be hard strong dense, durable clean and free from skin and coating likely
to prevent proper adhesion of mortar.
13.2. The aggregates shall generally be cubical in shape. Unless special stones of particular quarries
EW-371 PUR-F-006 RFQ-79155
are mentioned, aggregate shall be machine crushed from4he best, black trap or equivalent hard
stones as approved. Aggregate shall have no deleterious reaction with cement.
13.3. The necessary tests indicated in I.S. 383-1970 and I.S. 456-1978 shall have to the carried oat
to. ensure the acceptability of the material.
12.3 13.4. If aggregate is covered with dust it shall be washed with water to make it clean..
15.1 The bricks shall be hand or machine molded and made from suitable Flyash and klin-burnt.
They shall be free from crack and nodules of free lime. They shall have smooth rectangular faces
with sharp corners and shall be of uniform color.
The bricks shall be molded with a frog of 100 mm. X 40 mm. And 10 mm. To 20 mm. Deep on one of
its flat sides. The bricks shall not break when thrown on the ground from a height of 600 mm.
15.2 The size of modular bricks shall be 190 mm. X 90 mm. X 90 mm.
15.3 The size of the conventional bricks shall be as under :
15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall be
permitted in the conventional size adopted in a particular work.
Length : 1.8(3.0 mm.) Width : 1/6” (1.51 mm.) Height : 1/6” (1.50 mm.)
15.5 The crushing strength of the bricks shall not be less than 35 Kg./Sq. Cm. The average water
absorption shall not be more than 20 percent by weight. Necessary tests for crushing strength and
water absorption etc. Shall be carried out as per I. S. 3495 (Part-I to IV)
M-18. Mild Steel Bars
18.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S, 432 (Part-II) 1966 and §hail
be of tested quality.It shall also comply with relevant part of I.S. 456-
18.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose or thick
rust at the time ofplacing.
18.3 For the purpose of payment, the bar shall be measured correct upto 100 mm. length and
weight payable worked outat the rate specified below :
1. .6 mm. 0,22 Kg./Rmt. 8 20 mm. 2.47 Kg./Rmt.
M-19. High Yield Strength Steel Deformed Bars
19.1. High yield strength steel deformed bars be either cold twisted or hot/rolled, shall conform to
I.S. 1739-1966 andI.S.1139-1966 respectively.
19.2. Other provision and requirements shall conform to specification No. M-18.for Mild steel bars.
M-21 Mild Steel Binding Wire:
21.1 The mild steel wire shall be of 1.63 mm. Or 1.22 mm. (16 or 18 gauge) diameter and shall
conform to I. S. 280-1972.
21.2 The use of black wire will be permitted for binding reinforcement bars. It shall be free from
rust, oil paint, grease, loose mill scale or any other undesirable coating which may prevent adhesion
of cement mortar.
M-22 Structural Steel :
22.1 All structural steel shall conform to I. S. 226-1965. The steel shall be free from the defects
mentioned in I. S. 226-1975 and shall have a smooth finish. The materials shall be free from loose
mill scale, rust pits or other defects affecting the strength and durability. Rivet bars shall conform to
22.2 When the steel is supplied by the Contractor test certificates of the manufactures shall be
obtained according to I. S. 226-1975 and other relevant Indian Standards.
M-77 Selected Earth :
The selected earth shall be that obtained from excavated material from the borrow pit of GSECL
premises. The selected earth shall be good yellow soil and shall be got approved from the Engineer-
in-charge. In no case black cotton soil or similar expansive and shrinkable soil shall be used. It shall
be clean and free from all rubbish and perishable materials, stones or brick bats. The clods shall be
broken to a size of 50 mm. or less.
This part of the specification deals with requirements for repair & retrofitting of various quarters in
GSECL Colony GTPS.
Applicable Codes
EW-371 PUR-F-006 RFQ-79155
The provisions of relevant IS specifications for materials, respective items, published by BIS shall be
followed for all purposes shall be followed.
The Engineer will furnish indicative drawings wherever in his opinion such drawings are required to
show the areas to be repaired, sequence of priorities etc. The contractor shall follow such drawings
The specifications to be followed for this work are the specification for repairing of RCC structures
published by the BIS for relevant Items. This specification shall be supplemented by the technical
specification as given here under in this document and also the provision in the relevant IRC & IS
In case of any discrepancy or contradiction if any in the provision of above specification the order of
the precedence shall be followed.
2. IRC Provisions
3. IS Provisions
4. Technical Specification in this Volume
5. Sound Engineering Practice
6. Manufacture specification for special items
All work shall be carried out in confirmation with the above specifications. These specifications
broadly cover all major aspects of the work involved. Minor details may not be specified here however
if these are necessary for completion of work the contractor shall execute such minor items without
any additions to the costs.
All work shall be executed in accordance with good engineering practices. The Contractor shall
remain responsible for workmen’s compensation if any, when such case occurs.
The Contractor shall have to give site clean of all rubbish on completion of work and handover the
structure with final finishing as directed. All the rejected materials shall be removed from site by
Contractor at his risk and cost.
GENERAL DETAILS
All work shall be carried out in confirmation with these specifications. In general, provisions of
Indian Standard, Indian Road Congress codes and other national standards shall be followed unless
otherwise specified. These specifications are not intended to cover the minor details. The work shall
be executed in accordance with best modern practices & all latest codes and standards referred to in
these specifications shall be read in conjunction with the various other documents forming the
contract, tender specifications, BOQ, contract drawings and other related documents.
Measurement and payments
a) Mode of measurements:
The methods of measurement and payment shall be as described under various items and in Price
Bid. Where specific definitions are not given, the methods described in IS code will be followed?
b) Unacceptable work:
All defective works are liable to be demolished, rebuilt and defective materials replaced by the
contractor at his own cost. In the event of such works being accepted by carrying out repairs etc. as
specified by the engineer in charge, the cost of repairs will be borne by the contractor
Safety and Control
The Contractor shall take all necessary measures for the safety during construction / repair
activities and provide, erect and maintain such barricades, including signs, markings, flags, lights
etc. as may be required by the Engineer for the information and protection of persons approaching
or passing through the section of the plant under repair.
Scaffolding shall consist of double legged steel scaffolding with necessary bracing and planks. All
members before installations shall be checked for their strength and stiffness and other
requirements as per below described safe erection of scaffolding.
a) Erect metallic scaffolding including supply of all scaffolding material like pipes, planks, clamps,
pins, ladders etc.
b) In case of difficulties and to suit the site conditions, scaffolding may be modified as per
instruction of engineer in charge.
c) In case of site restrictions contractor have to carry out necessary improvements / alterations in
scaffolding wherever required keeping in mind the site conditions and safety requirements both.
d) All scaffolding shall be subjected to inspection and approval of engineer in charge after its
EW-371 PUR-F-006 RFQ-79155
Before taking up any construction /repair activities, an agreed phased program shall be drawn up in
consultation with the Engineer to facilitate smooth operation of the plant.
DETAILED SPECIFICATIONS
ITEM NO.1: Dismantling of sheet roofing including ridges, hips, Valleys, Gutters etc
stacking of serviceable materials and disposal of unserviceable materials with all lead
and lift. (1) GI Sheet roofing
1.0. Workmanship: 1.1. The relevant specification of item No.1 shall be followed except that
the G.I. sheet roofing shall be dismantled instead of Brick work.
2.0. Mode of measurements & payment :
2.1. The area of G.I. sheet roofing shall be measured in sq. meter. Ridge, hips and valley shall
be girthed and included with roof area. Corrugated and semi-corrugated surfaces shall be
measured flat and not girthed.
2.2. Supporting member such as rafters, purlins, beams, joints, trusses etc., Shall be measured
2.3. The rate shall be including disposal of unserviceable materials with all leads and lifts and
stacking the serviceable materials as directed.
2.4. The rate shall be for a unit of one sq. Meter.
Providing and fixing colour coated 0.5 mm (TCT) thick Galvalume sheet of approved colour
1060mm width and required length with 32 mm crests @ 250mm C/c with special
male/female side laps and ani-siphoning featured at male end to prevent leakages. The sheets
should be of high tensile strength, coated with an alloy zinc coating class AZ- 150 gram/Smt.
Top side epoxy primer 5-7 microns and top coat 18-22 microns of regular polyster paint.
Bottom side epoxt backers 7-10 microns of white / blue. The fed
material GI IS-3321 is to be manufactured out of 0.5mm (TCT) (Total coated thickness)
with Zinc-alluminum alloy of AZ-150, high tensile 550 mpa etc. complete as per
specifications. For slanted roof area including transportation, sheet should be fixed with
SDST screw and EPDM washer including all materials etc. complete with all required tools
and tackles, plants equipments, scaffolding at any height of depth performing safety
precautions as directed by EIC. (Payment shall be made for flat slping area without
overlap as per specifications) (a) 0.5 mm thickness
Work is to be carried out as per item description and as directed by EIC. Sample shall be got approved by EIC.
Make of Galvalume sheet is Jindal/TATA/Essar
The rate shall be for a unit of one sq. metre.
Mode of measurements & payment:
The measurements of the Galvalume sheet roof shall be taken for finished work in superficial area in general
plane (not girthed on the roof). The lapse between the sheets both at their ends and along the side edges shall
not be measured. The overlaps of C.G.I. sheets over the valley piece and their under lap under the ridge, hip
and flashing piece shall be included in the measurements. No deductions in measurements shall be made for
openings for chimney stacks, sky light etc. Of area upto 0.40 sq. Mt. nor extra be paid for extra labor in cutting
and for extra labor in cutting and for wastage etc. In forming such openings.
The rate of roof shall include the cost of all materials and labor involved in all operations described above. The
rate also includes the cost of provision, erection and removal of the scaffolding, benching, ladders, templates
and tools required for the proper erection and completion of the work. The rate includes the cost of purloins,
rafters and trusses.
The rate shall be for a unit of one sq. Meter.
Prov ridges or hips 600 mm overall in plain G.I sheet class - 3 fixed with G.I J or L hooks and
nuts 8mm dia G.I. limpet and bitumen washer complete.- 0.80mm Thick.
1.0 Materials : The G. I. Valley gutters and ridges shall conform M-23 A.
2.0 Workmanship :
EW-371 PUR-F-006 RFQ-79155
2.1 The relevant specifications of item No. 9 shall be followed except that the work shall be
carried out for ridges of hips. The overlaps for ridges and hips or either side over the C.G.I.
sheets and end legs shall be minimum 225 mm. Width of the ridges and hips shall be as
described in the item.
2.2 Ridges shall be fixed to the purlins with same 8 mm. Dia. G. I. Hook bolts and nuts and
bitumen and G. I. Limpet washers, which fix the sheets for the purline. Hips shall be fixed to
the roof members with the same 8 mm. Dia. G. I. Hook bolts and nuts and bitumen and G. I.
Limpet washers which fixed the sheets. At least one of the fixing bolts shall pass through the
end laps of the ridges and hips on other sides. If this is not possible, extra hook bolt shall be
provided. End laps of ridges and hips shall be jointed together by galvanized iron seam bolts
and G. I. Washers. There shall be at least two such bolts in each end lap.
2.3 Ridges and hips shall fit in squarely on the sheets.
3.0 Mode of measurements & payment :
3.1 The measurements of ridges or hips shall be taken for finished work in length along their
3.2 No laps shall be measured.
3.3 The payment for ridges and hips be made in a similar way as incase of C. G. I. Sheet
The rate shall be for a unit of one running meter
Steel work welded in built up sections framed work including cutting, hoisting, fixing in
position and applying a primer coat of red lead paint. (A) In beams and joists, channels angles
Tees, flats with connecting plates or angle cleats as in main and cross beams. Hip and jack
rafters, purlins connected to common rafters and the like.
Materials : The structured steel work shall conform to M-22. Red lead paint primer shall
conform to I.S. : 102-1962.
2.0 Workmanship :
2.1 The steel sections as specified or required shall be cut, square and to correct lengths as
per drawings and design. The cut Ends exposed to view shall be finished smooth. No two pieces
shall be welded or otherwise jointed to make up the required length of member, except as
indicated in the drawing or as directed. All straightening and shaping to form shall be done by
application of pressure and not by hammering. Any bending or cutting shall be carried out in
such a manner as not to impair the strength of the metal. All operations shall be done in cold
state unless otherwise directed/permitted.
2.2 Steel riveted or bolted up sections, frame work.
2.2.1 The steel structure as shown in the drawings or as per direction of the Engineer-in-charge
shall be laid out on a level platform to full scale and to full size or in parts. A steel tape shall be
used for measurements to ensure maximum accuracy.
2.2.2 Wooden templates 12 mm. To 19 mm. Thick or metal sheet template shall be made to
correspond to each connecting gussets plate and rivet holes shall be accurately marked on them
and drilled. The templates shall be laid on the steel members, and holes of the steel members
shall also be marked shall also be marked for cutting. The base of steel columns and the
position of Anchor bolts shall be carefully set out.
2.2.3 All stiffeners shall be formed by pressure and where practicable, the metal shall not be
cut and welded in making these. In major works or where so specified. Shop drawings giving
complete details and information for the fabrication of the component parts of the structure,
including location type size, length and details of rivets, bolts, or weld shall be prepared in
advance of the actual fabrication and as approved. The drawings shall indicate the shop and
field rivets and bolts. The steel members shall be distinctly marked or stenciled with paint with
the identification mark as given in the shop drawings.
The bars shall be thickened at the ends, so as to provide for screwed threads and gradually
tapered off to meet their normal section.
Great accuracy shall be observe in fabrication of various members, so that these can be
assembled without being unduly packed, strained or forced into position ad when built up,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-371_05_11_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .