| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC CHEMBIL PADICHIRA PULPALLY WAYANAD KERALA | PULPALLY | WAYANAD | KERALA | ₹18.7 L Quoted ₹18.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.9 LRejected-AOC SULTHAN BATHERY WAYANAD | SULTHAN BATHERY | WAYANAD | KERALA | ₹18.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SANIL CR L1 | Shaji KC L2 |
|---|---|---|---|---|---|
| 1.00ADOOR WSS | |||||
| 1.01 | Supplying and installation of submersible pump set of suitable discharge at specific
head including all
accessories ,Erection of pump installed with proper switch board wiring as per IE
rules & KSEB standards
and completion of all the works including Main board fixing, wiring, earthing etc and
trial run. Submersible
pump set above 10HP | 35 | HP | 16,325 ₹5.7 L | 16,325 ₹5.7 L |
| 1.02 | Providing and fixing G.I. pipes complete with G.I fittings including trenching and
refilling etc. External work80 mm dia nominal bore | 30 | M | 1,084.27 ₹32,528.10 | 1,084.27 ₹32,528.10 |
| 1.03 | OD307518/2025-2026 Supply and fixing of Good Quality cable for Pump set | 20 | M | 130 ₹2,600 | 140 ₹2,800 |
| 1.04 | Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.)
trusses etc., including cutting, hoisting,fixing in position and applying a priming coat
of approved steel primer, including welding and bolted with special shaped washers
etc. complete | 100 | KG | 217.25 ₹21,725 | 217.25 ₹21,725 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½
coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 0.06 | M3 | 9,182.4 ₹587.67 | 9,182.4 ₹587.67 |
| 1.06 | Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths
up to 1.0m by cutting, removing and stacking the damaged portion from the existing
line without causing any damages to the remaining portion and specials and
conveying and replacing with G.I. Pipes of suitable size and jointing by three run
welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc., complete. | 5 | NO | 1,837.38 ₹9,186.90 | 1,837.38 ₹9,186.90 |
| 1.07 | OD333905/2025-2026 CI non return valve 125 mm | 3 | NO | 10,289.99 ₹30,869.97 | 10,289.99 ₹30,869.97 |
| 1.08 | perpendicular to the axis of pipeline without causing any damages to the remaining
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe into the trenches,
placing in position, aligning the pipe to line and level and jointing the new pipe with
the existing pipe with solvent cement or any available joint and testing the pipeline by
operating the valves concerned, and rectifying the defects if noticed and without
causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, charges for removing surplus soil from work site,
including hire for tools and plant, conveyance of tools and materials, bailing out
water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling
etc., complete as per the direction of Departmental officers including the cost of pipe
and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming
to relevant standards: All Socketed Jointing. | 5 | NO | 1,391.74 ₹6,958.70 | 1,391.74 ₹6,958.70 |
| 1.09 | Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the remaining
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe into the trenches,
placing in position, aligning the pipe to line and level and jointing the new pipe with
the existing pipe with solvent cement or any available joint and testing the pipeline by
operating the valves concerned, and rectifying the defects if noticed and without
causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, charges for removing surplus soil from work site,
including hire for tools and plant, conveyance of tools and materials, bailing out
water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling
etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming
to relevant standards: All Socketed Jointing. | 5 | NO | 1,437.79 ₹7,188.95 | 1,437.79 ₹7,188.95 |
Tender Value
₹22.3 L
EMD Value
₹50,000
Closing Date
4 Mar 2026, 6:00 pmClosed
Regional Project Director
2nd Floor, Bldg.No.3/253, Near AKG Hospital, Talap, Kannur
GENERAL-Jalanidhi Sustainaility Project 2025-2026-ADOOR r wss, DEVARADUKKA WSS, MANIYOOR wss In Delampady Grama panchyath Kasargod Dist.- General Civil Work
2026_KRWSA_839781_1
KRWSA-KNR/184/2025-2026
Open Tender
Civil Works - Water Works
180 days
Delampary Grama Panchayath Kasaragod Disrict
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,500
₹50,000
Regional Project Management Unit, KRWSA, Kannur
6 Apr 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
24 Feb 2026 - 4 Mar 2026
26 Feb 2026
ADOOR WSS
Supplying and installation of submersible pump set of suitable discharge at specific head including all accessories ,Erection of pump installed with proper switch board wiring as per IE rules & KSEB standards and completion of all the works including Main board fixing, wiring, earthing etc and trial run. Submersible pump set above 10HP
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
OD307518/2025-2026 Supply and fixing of Good Quality cable for Pump set
Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
OD333905/2025-2026 CI non return valve 125 mm
perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
Lettering with black Japan pint of approved brand and manufacture
OD336937/2025-2026 PSF filter change as per the direction of eng in charge
DEVARADUKKA WSS
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work- Exposed on wall50 mm dia nominal bore
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 50mm diameter nominal bore.
Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
Supply of PVC Pipe, 10kg/cm2, 40mm Dia.
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 40 mm nominal outside diameter pipes.
Supply of PVC Pipe, 10kg/cm2, 110mm Dia
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
Lettering with black Japan pint of approved brand and manufacture
MANIYOOR WSS
OD316063/2025-2026 Supplying and installation of submersible pump set of suitable discharge at specific head including all accessories ,Erection of pump installed with proper switch board wiring as per IE rules & KSEB standards and completion of all the works including Main board fixing, wiring, earthing etc and trial run. Submersible pump set above 10HP
Supply of HDPE Pipe PE 100 (IS 4984/1995), 16kg, 90mm Outer Di
Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes.
Supply of CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.6, Size 80mm.
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer in-charge. The product performance shall carry guarantee for 10 years against any leakage.For horizontal surface one coat @1.10 kg per sqm
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD323543/2025-2026 Additional ABC Cable for pumpset
OD323544/2025-2026 Supply and Fixing 110mm uPVC 90 degree Bend 12.5 kg/cm2
OD323545/2025-2026 Supply and Fixing 80mm uPVC 90 degree Bend 12.5 kg/cm2
Lettering with black Japan pint of approved brand and manufacture
Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat).
Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings with synthetic enamel paint of approved brand and manufacture and required colour over a priming coat of approved steel primer on new work.100 mm diameter pipes
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1415339.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BidDocumentDelampady.pdf
Tender Documents • 1.50 MB
ImplementationGuidelines.pdf
Additional Documents • 5.20 MB
BOQ_1415339.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid