Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 CrAdmitted-Finance 116 ROHINI COMPLEX MOTHER DAIRY ROAD SHAKARPUR EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | -34.20% | ₹8.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.6 Cr+₹73.1 L (8.25%)Admitted-Finance | -28.77% | ₹9.6 Cr+₹73.1 L (8.25%) | L2 | Admitted-Finance |
| 3 | L3₹9.9 Cr+₹1.0 Cr (11.7%)Admitted-Finance | -26.52% | ₹9.9 Cr+₹1.0 Cr (11.7%) | L3 | Admitted-Finance |
| 4 | L4₹10.4 Cr+₹1.5 Cr (17.0%)Admitted-Finance 12 A GAHMARKUNJ CHINHAT MATIYARI LUCKNOW UTTAR PRADESH 226017 | LUCKNOW | UTTAR PRADESH | 226017 | -23.00% | ₹10.4 Cr+₹1.5 Cr (17.0%) | L4 | Admitted-Finance |
| 5 | L5₹11.1 Cr+₹2.3 Cr (25.7%)Admitted-Finance 122 721 EKTA SHASTRI NAGAR KANPUR NAGAR UTTAR PRADESH 208005 | KANPUR NAGAR | UTTAR PRADESH | 208005 | -17.30% | ₹11.1 Cr+₹2.3 Cr (25.7%) | L5 | Admitted-Finance |
Tender Value
₹13.5 Cr
EMD Value
₹26.9 L
Closing Date
29 Dec 2025, 4:00 pmClosed
DIG (Engr), Eastern Frontier, ITB Police, Lucknow
6th Floor, Kendriya Bhawan, Sector-H, Aliganj, Lucknow, UP
Construction of combined building of GOs Mess for Eastern Frontier and SHQ (LKO) at Darogakhera, Eastern Frontier, ITBP, Lucknow
2025_ITBP_888662_1
NIT No 10358 dtd 04-12-25
Open Tender
Civil Works - Buildings
Percentage
455 days
At Darogakheda, Lucknow, UP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26.9 L
2 Feb 2026
5 Dec 2025
30 Dec 2025
5 Dec 2025
29 Dec 2025
5 Dec 2025
5 Dec 2025 - 29 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil | 1,942 | Cum | 172.71 | ₹3,35,402.82 |
| 2 | Excavating trenches by mechanical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil Pipes, cables etc. exceeding 80 mm dia. But not exceeding 300 mm dia | 180 | Rmt | 342.64 | ₹61,675.2 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,942 | Cum | 190.71 | ₹3,70,358.82 |
| 4 | Carriage of Earth by mechanical transport including loading, unloading and Stacking including royalty & carriage up to 5 KM complete. | 250 | Cum | 681.59 | ₹1,70,397.5 |
| 5 | Supplying and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete. | 300 | Cum | 2,066.41 | ₹6,19,923 |
| 6 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. All kinds of soil. | 4,200 | Sqm | 33.23 | ₹1,39,566 |
| 7 | Supplying chemical emulsion in sealed containers including delivery as specified . chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 215 | litre | 228.41 | ₹49,108.15 |
| 8 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor : With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | 1,837 | Sqm | 301.68 | ₹5,54,186.16 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 68.15 | Cum | 7,097.74 | ₹4,83,710.98 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 290.56 | Cum | 6,628.08 | ₹19,25,854.92 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
gosmesstender.pdf
Tender Documents • 21.17 MB
BOQ_934048.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .