| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 CrAccepted-AOC | L1 | Accepted-AOC Work awarded to L1 bidder | |
| 2 | L2₹27.0 Cr+₹2.1 Cr (8.28%)Rejected-Finance | L2 | Rejected-Finance Work awarded to L1 bidder | |
| 3 | L3₹27.3 Cr+₹2.4 Cr (9.64%)Rejected-Finance | L3 | Rejected-Finance Work awarded to L1 bidder | |
| 4 | L4₹27.7 Cr+₹2.8 Cr (11.1%)Rejected-Finance | L4 | Rejected-Finance Work awarded to L1 bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical Shortfall documents not submitted |
Tender Value
₹27.4 Cr
EMD Value
₹20 L
Closing Date
21 Aug 2024, 6:00 pmClosed
MANAGING DIRECTOR, CIAL
Cochin International Airport Ltd, Nedumbasserry
Civil and Interior Works
2024_CIAL_679043_1
CIAL/CIVIL/613B/E21
Open Tender
Civil Works - Buildings
Item Rate
450 days
Cochin International Airport Ltd
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
₹20 L
Cochin International Airport Ltd
27 Sept 2024
3 Jul 2024
23 Aug 2024
3 Jul 2024
21 Aug 2024
8 Aug 2024
4 Jul 2024 - 17 Jul 2024
22 Jul 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH: EARTHWORK
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared,including cost and conveyance of all materials, labour charges,tool rental charges, lead,lift etc complete as directed by Engineer-in-Charge at all levels. | 28,193.2 | Sqm | 100 | ₹28,19,320 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sq.m on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed. The rate quoted should be inclusive of dewatering.
All kinds of soil. | 3,068.43 | Cum | 100 | ₹3,06,843 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth.1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil, disposed earth to be levelled and neatly dressed within the site as directed by the Engineer-in-Charge.but for every additional lift of 1.5m to 3.00m or part there of. The rate quoted should be inclusive of dewatering.
All kinds of soil. | 673.13 | Cum | 10 | ₹6,731.3 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil, disposed of the earth to be levelled and neatly dressed within the site as directed by the Engineer-in-Charge. but for every additional lift of 3m to 4.5m or part thereof. The rate quoted should be inclusive of dewatering.
All kinds of soil. | 186.4 | Cum | 10 | ₹1,864 |
| 5 | Earth work in excavation by means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth. and 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil, disposed earth to be levelled and neatly dressed within the site as directed by the Engineer-in-Charge. but for every additional lift of 4.5m to 6m or part thereof.The rate quoted should be inclusive of dewatering.
All kinds of soil. | 35.75 | Cum | 10 | ₹357.5 |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.The rate quoted should be inclusive of dewatering.
All kinds of soil | 10 | Cum | 10 | ₹100 |
| 7 | Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. | 201.36 | Cum / Mtr | 10 | ₹2,013.6 |
| 8 | Back filling in plinth , or trenches, under floors, in areas with crusher sand including watering, ramming, consolidating and dressing including cost and conveyance of all materials, labour charges, lead, lift etc. complete at all levels as directed by the Engineer-in-Charge | 1,683.58 | Cum | 10 | ₹16,835.8 |
| 9 | Filling in plinth or trenches underfloors, foundations in areas etc with red earth in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m including cost and conveyance of all materials, labour charges etc. complete at all levels as directed by Engineer-in-charge | 1,056.29 | Cum | 10 | ₹10,562.9 |
| 10 | Carriage of materials by mechanical transport including loading, unloading and stacking lead up to 5 km, including all lifts involved as directed by the Engineer-in-Charge. Excavated Earth | 4.19 | Cum | 100 | ₹419 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1055981.xls
BOQ • 0.76 MB
147543986.pdf
Tender Documents • 0.52 MB
147543988.html
Tender Documents • 0.04 MB
ConventionHallDwgs.pdf
Tender Documents • 37.17 MB
CottagesADwgs.pdf
Tender Documents • 30.56 MB
ExternalDevelopmentDwgs.pdf
Tender Documents • 12.90 MB
GolfHandrailDetail.pdf
Tender Documents • 0.97 MB
GolfTenderDocument.pdf
Tender Documents • 3.47 MB
MasterplansDwgs.pdf
Tender Documents • 21.00 MB
SportsComplexDwgs.pdf
Tender Documents • 27.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .