| 1.00 | STRENGTHENING THE ROAD FROM KALLIKUDI TO NKT ROAD IN PONNUSANGAMPATTI PANCHAYAT Clearing the light jungle by uprooting including all cutting charges and depositing and disposing of the products including all labour charges etc comp., km 0/0-2/560 | 3,532.8 | sqm | - | - |
| 2.00 | Picking 5 cm to 10cm old metalled surface and sectioning - 1sq.m | 3,200 | cum | - | - |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A km 0/0-2/560 | 1,152 | cum | - | - |
| 4.00 | Collection and supply of WMM including cost & conveyance of stacking them on road side to dept guage for taking pre measurement etc., | 1,200 | cum | - | - |
| 5.00 | Providing and Laying Gravel to compacted thickness including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0/0-1/0 | 270 | cum | - | - |
| 6.00 | km 1/0-2/0 | 270 | cum | - | - |
| 7.00 | km 2/0-2/560 | 151.2 | cum | - | - |
| 8.00 | Applying PRIMECOAT over WMB/WMM surface at 7.00kg of SS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/560 | 9,600 | cum | - | - |
| 9.00 | Applying TACKCOAT over Primed WBM surface at 2.50kg of RS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/560 | 9,600 | cum | - | - |
| 10.00 | Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.75mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0 | 3,750 | sqm | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
14 Oct 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 3 roads in Thuraiyur Block of Tiruchirappalli District under Tamil Nadu Rural Roads Improvement Scheme 2020-21 Package No.30
2020_RDTN_180425_30
DIPR/3344/TENDER/2020 Dated 08.09.2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.5 L
DRDA Tiruchirappalli
19 Oct 2020
22 Sept 2020
14 Oct 2020
22 Sept 2020
14 Oct 2020
22 Sept 2020
23 Sept 2020
Amount
STRENGTHENING THE ROAD FROM KALLIKUDI TO NKT ROAD IN PONNUSANGAMPATTI PANCHAYAT Clearing the light jungle by uprooting including all cutting charges and depositing and disposing of the products including all labour charges etc comp., km 0/0-2/560
Picking 5 cm to 10cm old metalled surface and sectioning - 1sq.m
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A km 0/0-2/560
Collection and supply of WMM including cost & conveyance of stacking them on road side to dept guage for taking pre measurement etc.,
Providing and Laying Gravel to compacted thickness including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0/0-1/0
Applying PRIMECOAT over WMB/WMM surface at 7.00kg of SS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/560
Applying TACKCOAT over Primed WBM surface at 2.50kg of RS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/560
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.75mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0
Provision for KM stone
Provision for HM stone
Name board charges
STRENGTHENING THE ROAD FROM SOKKANATHAPURAM TO SAMATHUVAPURAM ROAD Clearing the light jungle by uprooting including all cutting charges and depositing and disposing of the products including all labour charges etc comp., km 0/0-2/420
Picking 5 cm to 10cm old metalled surface and sectioning - 1sq.m
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A km 0/0-2/420
Collection and supply of WMM including cost & conveyance of stacking them on road side to dept guage for taking pre measurement etc.,
Providing and Laying Gravel to compacted thickness including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0/0-1/0
Applying PRIMECOAT over WMB/WMM surface at 7.00kg of SS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/420
Applying TACKCOAT over Primed WBM surface at 2.50kg of RS-1 Bitument Emulsion/10 sq.m including labour for spraying, hire charges for bitument sprayer etc comp. km 0/0-2/420
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.75mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0
Provision for RCC Culvert 0/0- Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation -
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. -
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing -
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle -
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle -
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specification clauses 1002, 1010 and 1202
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete
Reinforce cement concrete 1:1 1/2:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc.,
Provision for RCC Culvert 1/480- Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation -
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. -
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing -
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle -
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle -
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specification clauses 1002, 1010 and 1202
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete
Reinforce cement concrete 1:1 1/2:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc.,
Provision for KM stone
Provision for HM stone
Name board charges
Strengthening the Road from Athanur to Kalladipatti Road in Athanur Panchayat.., Km 0/0-1/150 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A (0/0-1/150)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,(0/0-1/150)
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., (0/0-1/150)
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m (0/0-1/150)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. (0/0-1/150)
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.(0/0-1/150)
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.(0/0-1/150)
PREMIX CARPET WITH SEAL COAT TYPE ' A ' Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete (0/0-1/150)
Providing KM Stones White washing lettering etc., complete. (1.65 x 0.45 x 0.15 m )
Providing HM Stones White washing lettering etc., complete. (0.75 x 0.23 x 0.1 )
Providing for Name Board painting & Lettering charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R MURUGAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TechBid30.pdf
Tender Documents • 0.33 MB
PriceBid30.pdf
Additional Documents • 0.23 MB
BOQ_216327.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .