Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.8 LAccepted-AOC | 1 | Accepted-AOC Admitted. | |
| 2 | 2₹19.9 L+₹2.1 L (12.1%)Rejected-AOC NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | 2 | Rejected-AOC Admitted. | |
| 3 | 3₹20.0 L+₹2.2 L (12.5%)Rejected-AOC | 3 | Rejected-AOC Admitted. | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical LINI NIVAS NALLILA KOLLAM | KOLLAM | KOLLAM | KERALA | - | Rejected-Technical Rejected |
Tender Value
₹27.0 L
EMD Value
₹50,000
Closing Date
4 Sept 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Roads Division Palakkad
Investigation work
2020_PWD_380129_1
PWD/2020-2021/15003/RdDnPKD
Open Tender
Civil Works - Roads
Item Rate
90 days
Thrithala
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
Executive Engineer
₹50,000
Yes
11 Jan 2021
26 Aug 2020
7 Sept 2020
26 Aug 2020
4 Sept 2020
26 Aug 2020
60 days
Amount
Investigation for Road Improvement
od7427/2020_2021 : Total station surveying in plain builtup area with hindrance to line of sight due to buildings or structures with 1m contour intervel in 5x5m intervel and preparation of site plan, longitudinal section, cross sections etc and furnishing the drawing in six copies as per the direction of the Engineer in charge.
od7428/2020_2021 : Preperation of the quantities of earth work (cutting and filling), pavement layers from the results of re alignment plan, Surveey results and pavement design etc in consultation with the Engineer in charge including preperation of results such as longitudinal section, cross section, quantity calculation, level readings etc in book form
od7429/2020_2021 : Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral tansitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 50m C/C.
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
od7430/2020_2021 : Conducting traffic survey for 3 days including providing huts on either side of road, lighting, providing barricade, preparing data sheets etc. complete.
od7474/2020_2021 : Conducting sub soil investigation tests at suitable intervals including taking samples, grain size analysis, Temperature measurement, Atterbergs limits, Proctor compaction, Soaked CBR value etc and submitting the compiled reports etc. complete as per the IRC guide lines and direction of the departmental officers.
od7475/2020_2021 : Conducting Benkelman Deflection Test at 50 m intervals as per specifications including digging hole 15 mm dia and 40 mm depth for taking temperature and collecting soil samples at testing point as per the specifications and furnishing of the test result report as directed by the engineer in charge
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
VELCITI CONSUTING ENGINEERS PVT LTD
Liju D John
MUHAMMED NOUFAL
C Two Infrastructure Private Limited
MERIDIAN SURVEYS AND MAPPING PRIVATE LIMITED
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Liju D John
VELCITI CONSUTING ENGINEERS PVT LTD
AA AND S CONSTRUCTIONS
MUHAMMED NOUFAL
Synergy Architects and Engineers
C Two Infrastructure Private Limited
MERIDIAN SURVEYS AND MAPPING PRIVATE LIMITED
ANAS K.P.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_539162.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .