| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.1 CrAccepted-AOC VILLAGE THARAS P O HURLA TEHSIL BHUNTAR DISTT KULLU H P 175125 | KULLU | HIMACHAL PRADESH | 175125 | ₹5.1 Cr | L-1 | Accepted-AOC As per approval of competent authority |
| 2 | L-2₹5.4 Cr+₹26.6 L (5.18%)Rejected-Finance MAIN ROAD PRAGATI VIHAR RISHIKESH DEHRADUN 249201 | DEHRADUN | UTTARAKHAND | 249201 | ₹5.4 Cr+₹26.6 L (5.18%) | L-2 | Rejected-Finance As per approval of competent authority. |
| 3 | L-3₹5.7 Cr+₹57.9 L (11.3%)Rejected-Finance R O SHARMA NIWAS NAND PLACE SECTOR 4 NEW SHIMLA H P 171009 | SHIMLA | HIMACHAL PRADESH | 171009 | ₹5.7 Cr+₹57.9 L (11.3%) | L-3 | Rejected-Finance As per approval of competent authority. |
| 4 | L-4₹6.4 Cr+₹1.2 Cr (24.0%)Rejected-Finance | ₹6.4 Cr+₹1.2 Cr (24.0%) | L-4 | Rejected-Finance As per approval of competent authority. |
| 5 | L-5₹6.7 Cr+₹1.5 Cr (29.7%)Rejected-Finance | ₹6.7 Cr+₹1.5 Cr (29.7%) | L-5 | Rejected-Finance As per approval of competent authority. |
| Sl No | Description | Qty | Unit | STARCON INFRA PROJECT INDIA PRIVATE LIMITED L5 | ALPHA PACIFIC SYSTEMS PVT. LTD. L4 | SS Soam Engineers Pvt. Ltd. L2 | SAI SHAKTI SOLUTIONS LLP L3 | C P SYSTEMS PVT LTD L6 | Drillcon Infrastructure Pvt Ltd L7 | Ashadeep Construction Private Limited L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of debris/boulders from collection chamber, Silt Flushing tunnel, gate grooves, intake structure and other associated structure and disposal of all excavated earth upto a lead of 20 mtr and all lift. | 6,530 | Cum | 2,750 ₹1,79,57,500 | 520 ₹33,95,600 | 3,500 ₹2,28,55,000 | 450 ₹29,38,500 | 275.6 ₹17,99,668 Lowest | 500 ₹32,65,000 | 1,480 ₹96,64,400 |
| 2.00 | Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Hard rock (blasting prohibited) | 69,159.45 | Cum | 425 ₹2,93,92,766.25 | 465 ₹3,21,59,144.25 | 150 ₹1,03,73,917.5 Lowest | 180 ₹1,24,48,701 | 275.6 ₹1,90,60,344.42 | 900 ₹6,22,43,505 | 300 ₹2,07,47,835 |
| 3.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder,railings, brackets, gates and similar works. | 27,573.39 | Kg | 175 ₹48,25,343.25 | 138 ₹38,05,127.82 | 150 ₹41,36,008.5 | 110 ₹30,33,072.9 Lowest | 129.19 ₹35,62,206.25 | 140 ₹38,60,274.6 | 240 ₹66,17,613.6 |
| 4.00 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. | 45 | Cum | 15,000 ₹6,75,000 | 9,800 ₹4,41,000 | 11,000 ₹4,95,000 | 12,000 ₹5,40,000 | 9,196.17 ₹4,13,827.65 Lowest | 12,000 ₹5,40,000 | 12,500 ₹5,62,500 |
| 5.00 | Hiring of Hydraulic Excavator Ex-200 or above with bucket capacity 0.9 cum to 1.7 cum with fuel and operator etc., complete. | 250 | Hrs. | 3,500 ₹8,75,000 | 2,100 ₹5,25,000 Lowest | 5,000 ₹12,50,000 | 2,500 ₹6,25,000 | 27,598.09 ₹68,99,522.5 | 3,000 ₹7,50,000 | 3,300 ₹8,25,000 |
| 6.00 | Mobilization/ demobilization of Excavator. | 2 | Each | 2,00,000 ₹4,00,000 | 65,000 ₹1,30,000 | 35,000 ₹70,000 | 50,000 ₹1,00,000 | 2,76,038.28 ₹5,52,076.56 | 50,000 ₹1,00,000 | 25,000 ₹50,000 Lowest |
| 7.00 | Hiring of JCB with fuel and driver. | 300 | Hrs. | 2,000 ₹6,00,000 | 1,050 ₹3,15,000 Lowest | 1,500 ₹4,50,000 | 1,200 ₹3,60,000 | 1,377.99 ₹4,13,397 | 2,250 ₹6,75,000 | 1,200 ₹3,60,000 |
| 8.00 | Hiring of Dumper/ Tipper /Hiwa of capacity 10 Tonne or above with fuel and driver. | 30 | Day | 12,000 ₹3,60,000 | 7,500 ₹2,25,000 | 10,000 ₹3,00,000 | 5,000 ₹1,50,000 Lowest | 6,440.19 ₹1,93,205.7 | 15,000 ₹4,50,000 | 6,500 ₹1,95,000 |
| 9.00 | Providing & Fixing 15 tonnes Cpacity 5 m long Chain pulley with accessories. | 2 | Each | 2,50,000 ₹5,00,000 | 38,000 ₹76,000 | 25,000 ₹50,000 Lowest | 2,00,000 ₹4,00,000 | 1,10,416.27 ₹2,20,832.54 | 50,000 ₹1,00,000 | 1,90,000 ₹3,80,000 |
| 10.00 | Carriage of material by Manual Labour including loading, unloading and stacking for lead less than 0.50 KM (Intake Structure to Loading point). | 6,530.37 | Cum | 500 ₹32,65,185 | 190 ₹12,40,770.3 Lowest | 1,200 ₹78,36,444 | 2,800 ₹1,82,85,036 | 1,840.19 ₹1,20,17,121.57 | 600 ₹39,18,222 | 360 ₹23,50,933.2 |
Tender Value
₹8.5 Cr
EMD Value
₹16.9 L
Closing Date
2 Mar 2026, 6:55 pmClosed
Group Senior Manager, PnC
PnC Division,Parbati Complex,Parbati-II H.E.Project, Nagwain, Distt.-Mandi, H.P.-175121
Restoration of Jiwa Trench weir site post cloud brust incident by cleaning the silt from intake structure,collection chamber,SFC,gate grooves,Approch Tunnel,Feeder Tunnel,Adit,Majhaan Nallah and other associated structure of PHEP-II (PKG.NO-C-845)
2026_NHPC_896005_1
NH/PP-II/PnC/Pkg. No. C-845/2025
Open Tender
Civil Works
Works
180 days
Power House Civil, Sainj, Parbati HEP, Stage-II
Please refer tender document
7 documents required · 7 mandatory
₹1,770
NHPC Ltd
₹16.9 L
Yes
5 May 2026
14 Feb 2026
6 Mar 2026
14 Feb 2026
2 Mar 2026
14 Feb 2026
Cleaning of debris/boulders from collection chamber, Silt Flushing tunnel, gate grooves, intake structure and other associated structure and disposal of all excavated earth upto a lead of 20 mtr and all lift.
Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Hard rock (blasting prohibited)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder,railings, brackets, gates and similar works.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level.
Hiring of Hydraulic Excavator Ex-200 or above with bucket capacity 0.9 cum to 1.7 cum with fuel and operator etc., complete.
Mobilization/ demobilization of Excavator.
Hiring of JCB with fuel and driver.
Hiring of Dumper/ Tipper /Hiwa of capacity 10 Tonne or above with fuel and driver.
Providing & Fixing 15 tonnes Cpacity 5 m long Chain pulley with accessories.
Carriage of material by Manual Labour including loading, unloading and stacking for lead less than 0.50 KM (Intake Structure to Loading point).
Carriage of material by Mechanical Transport including loading, unloading and stacking up to 6 Km Lead.
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
EtenderC845.pdf
Tender Documents • 2.94 MB
BOQ_944559.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .